Loading...
HomeMy WebLinkAbout20191029 Ver 4_401 Request Attachment_20211004 (2)Submitted 10/04/2021 Submitted 10/04/2021 Submitted 10/04/2021 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 17+44/17+62 -L- (RT) Scour Hole Stabilization < 0.01 < 0.01 20 15 2A 29+10/29+46 -L- (LT) Channel Improvements < 0.01 < 0.01 26 12 2B 33+00/33+30 -L- (LT) Bank Stabilization < 0.01 < 0.01 40 10 3A 33+30/33+51 -L- (LT) 3 @ 10'X10' RCBC Extension 0.03 53 33+30/33+51 -L- (LT) Bank Stabilization 0.02 < 0.01 45 15 3B 33+61/33+85 -L- (RT)Excavation < 0.01 33+24/33+38 -L- (RT) Bank Stabilization < 0.01 < 0.01 15 33 4 14+02/14+36 -RPB- (RT)Fill Slope < 0.01 4A 4B 14+52/14+80 -RPD- (LT) Bank Stabilization < 0.01 < 0.01 23 20 5A 75+05/75+30 -Y- (LT) Bank Stabilization < 0.01 < 0.01 10 20 5B 5C 51+50/52+59 -L- (RT) 3 @ 12'X12' RCBC Extension 0.02 37 51+50/52+59 -L- (RT) Channel Improvements 0.02 32 51+50/52+59 -L- (RT) Bank Stabilization 0.05 0.02 86 26 5D 54+50/54+75 -Y- (LT) Scour Hole Stabilization < 0.01 < 0.01 14 38 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 4 OF 5 Channel Impacts Permanent: 25 FT Channel Impacts Temporary: 26 FT WAKE I-5700 AUGUST 17, 2021 REVISED PERMIT DRAWING I-5506 Permit Sites have already been permitted and do not contribute to the total wetland and stream impacts for I-5700.NC DEPARTMENT OF TRANSPORTATION I-5506 Permit Site 5A (48" CMP) I-5506 Permit Site 5B (Bank Stabilization)DIVISION OF HIGHWAYS Permanent SW Impacts: <0.01 ac. Temporary SW Impacts: <0.01 ac.8/17/2021 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS REMOVED AFTER 4B MEETING REMOVED DUE TO DESIGN CHANGE Submitted 10/04/2021 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No. (From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 5E 29+90 -Y3- (CL) Proposed 12'X10' RCBC 0.07 176 29+90 -Y3- (CL)Bank Stabilization 0.03 < 0.01 73 20 6 51+47/51+74 -L- (RT) Channel Improvements < 0.01 52 7 52+38/52+76 -L- (RT) Channel Improvements 0.005 0.007 20 34 8A 29+75/28+90 -Y3- (CL)Channel Fill 0.01 121 8B 26+22/28+96 -Y3- (LT)Fill Slope 0.30 0.07 26+25 -Y3- (CL)Rip Rap Pad < 0.01 9 53+20/53+34 -Y- (LT) Bank Stabilization < 0.01 < 0.01 45 17 10A 87+20/88+15 -Y- (RT) 3 @ 9'X8' RCBC Extension < 0.01 7 87+20/88+15 -Y- (RT) Channel Improvements 0.03 0.01 50 17 10B 88+00/88+74 -Y- (RT) 3 @ 9'X8' RCBC Extension 0.03 10C 86+82/87+00 -Y- (RT) 3 @ 9'X8' RCBC Extension < 0.01 11 95+48/99+77 -Y- (RT) 60" RCP Extension < 0.01 17 95+48/99+77 -Y- (RT) Scour Hole Stabilization < 0.01 < 0.01 28 23 11A 101+00/101+15 -Y- (LT) Bank Stabilization < 0.01 < 0.01 28 10 12 101+15/101+57 -Y- (LT) Diversion Channel < 0.01 40 TOTALS*:0.30 0.00 0.01 0.11 0.00 0.34 0.09 1018 350 0 *Rounded totals are sum of actual impacts NOTES: Revised 2018 Feb SHEET 5 OF 5 Channel Impacts Permanent: 25 FT Channel Impacts Temporary: 26 FT WAKE I-5700 AUGUST 17, 2021 REVISED PERMIT DRAWING I-5506 Permit Sites have already been permitted and do not contribute to the total wetland and stream impacts for I-5700.NC DEPARTMENT OF TRANSPORTATION I-5506 Permit Site 5A (48" CMP) I-5506 Permit Site 5B (Bank Stabilization)DIVISION OF HIGHWAYS Permanent SW Impacts: <0.01 ac. Temporary SW Impacts: <0.01 ac.8/17/2021 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Submitted 10/04/2021