Loading...
HomeMy WebLinkAbout20130634 Ver 1_Staff Comments_20130905Strickland, Bev From: Lucas, Annette Sent: Thursday, September 05, 2013 12:07 PM To: Smith, Cherri L Cc: Strickland, Bev Subject: 13 -0634 MacGregor Downs Deck Addition - CONDITION Attachments: 13 -0634 MacGregor Downs Deck Addition - CONDITION.docx Cherri, Condition attached. Sorry so slow — I was waiting for Hunter to send me the O &M. I plan to review Colleymore -Bey this afternoon. Hope you are doing well! A Annette M. Lucas, PE Environmental Engineer NCDENR I DEMLR I Stormwater Program 1612 Mail Service Center, Raleigh, NC 27699 -1612 (N111a.i.l.) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (i ocatior &, Parcels) Phone: (919) 807 -6381 1 Fax: (919) 807 -6494 1 Email: l nnetLe.1 -u as'(rLL(- Uicnr.��t-ry Website: http: / /portal.ncdenr.org /web /lr /stormwater Before printing this email, please consider your budget and the environment. E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 13 -0634 MacGregor Downs Deck Addition - CONDITION AML comments September 5, 2013 Stormwater Management Plan (SMP) Approval by the Division The Division approves the SMP consisting of one rain water harvesting system and all associated stormwater conveyances, inlet and outlet structures, and the grading and drainage patterns depicted on plan sheets dated August 7, 2013, which are incorporated by reference and are enforceable by the Division. The following conditions also apply: a) The maximum allowable drainage area for the approved rain water harvesting system shall be 2,000 square feet. Any changes to these maximum areas shall require the applicant to submit and receive approval for a revised stormwater management plan by the Division. b) The footprint of all stormwater management devices as well as an additional 10 -foot wide area on all sides of the devices shall be located in either public rights -of -way, dedicated common areas or recorded easement areas. The final plats for the project showing all such rights -of -way, common areas and easement areas shall be in accordance with the approved plans. c) The approved SMP shall be constructed and operational before any permanent building or other structure is occupied at the site. d) The SMP may not be modified without prior written authorization from the Division. A copy of the approval letter and the modified SMP shall be submitted to the DWR Webscape Unit prior to the commencement of the modifications. e) Maintenance activities for the wet detention basins shall be performed in accordance with the notarized O &M agreements signed by Mr. Russ Curtis (General Manager) on September 5, 2013. The O &M agreement shall transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility. The Division shall be notified promptly of every transfer. f) The applicant and /or authorized agent shall provide a completed Certificate of Completion form to the Division within thirty (30) days of project completion (available at http: / /porta 1. ncden r.org /web /wq /swp /ws /401 /certsa nd perm its /apply /forms).