Loading...
HomeMy WebLinkAbout20130634 Ver 1_More Info Received_20130905Strickland, Bev From: Lucas, Annette Sent: Thursday, September 05, 2013 11:28 AM To: Strickland, Bev Subject: FW: 13 -0634 MacGregor Downs Deck Addition Attachments: MacGregor O &M Manual.pdf From: Freeman, Hunter [ma i Ito: HFreemanCa)withersravenel.com] Sent: Thursday, September 05, 2013 10:34 AM To: Lucas, Annette; Smith, Cherri L Subject: MacGregor Downs Deck Addition Annette — I've attached the signed maintenance agreement for the cistern. Let me know if you need anything else. Permit Number: (to be provided by DWQ) Drainage Area Number: Rainwater Harvesting System Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The roof area will be maintained to reduce the debris and sediment load to the system. Excess debris can clog the system and lead to bypass of the design storm, and reduced reuse volume. — To ensure proper operation as designed, a licensed Professional Engineer, Landscape Architect, or other qualified professional will inspect the system annually. — The system components will be repaired or replaced whenever they fail to function properly. — If the outlet is metered, use must be recorded at a minimum of monthly. These records shall be kept on site for inspection by DWQ. The system will be inspected by the owner/ operator at least monthly and within 24 hours after each rain event. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problems: How to remediate the problem: The entire system A component of the system is Make any necessary repairs or replace if damaged or leaking. damage is too large for repair. Water is flowing out of the Check system for clogging and damage. Repair overflow pipe during a as needed so the design volume is stored design rainfall or smaller properly without discharging during a design (usually a 1" or 1.5" rainfall). storm. Check that the pump is operating properly and that the water is actually being used at the volume designed. If it is still not operating properly, then consult an expert. The captured roof area Excess debris or sediment is Remove the debris or sediment as soon as resent on the roofto . possible. The gutter system Gutters are clogged, or water Unclog and remove debris. May need to install is backing up out of the gutter screens to prevent future clogging. gutter system. Rooftop runoff not making it Correct the positioning or installation of gutters. into gutter system. Replace if necessary to capture the roof runoff. Form SW401-Rainwater Harvesting O &M -Rev. l Page 1 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number: BMP element: Potential problems: How to remediate the problem: The pump Pump is not operating Check to see if the system is clogged and flush if properly. necessary. If it is still not operating, then consult an expert. The overflow pipe Erosion is evident at the Stabilize immediately, overflow discharge point. The overflow pipe is clogged. Unclog or replace if it cannot be unclogged. The outflow pi pe is dams ed. Repair or replace the pipe. The secondary water Not operating properly. Consult an expert. supply The cistern Sediment accumulation of 5% Remove sediment. or more of the design volume. Algae growth is present Do not allow sunlight to penetrate the cistern. inside the cistern. Treat the water to remove/ prevent algae. Mosquitoes in the cistern. Check screens for damage and repair/ replace. Treat with 'mosquito dunks' if necessa The screens and filters Debris and /or sediment has Search for the source of the debris /sediment accumulated. Screens and and remedy the problem if possible. filters are clogged. Clean/ clear debris/ sediment from screen or filter. Replace if it cannot be cleaned. Form SW401- Rainwater Harvesting O &M -Rev.1 Page 2 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:MacGregor Downs Deck Addition BMP drainage area number:1 Print name:Russ Curtis Title:General Manager Address:420 Saint Andrews Lane Cary, NC 27511 Phony Sigoz si! Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of / « , County of do hereby certify that .personally appeared before me this day o , Z!%l3 , and acknowledge the due execution of the forgoin nnage et ce requirements. Witness my hand and official seal, LAUREN WELCH Notary Public, North Carolina Wake County My Commission Expires December 04, 2017 SEAL My commission expires A z4YI? Form SW401-Rainwater Harvesting O &M -Rev. l Page 3 of 3