Loading...
HomeMy WebLinkAbout20130634 Ver 1_More Info Received_20130829Strickland, Bev From: Lucas, Annette Sent: Thursday, September 05, 2013 11:27 AM To: Strickland, Bev Subject: FW: 13 -0634 MacGregor Downs Deck Addition Variance Attachments: 130808— OUT— LTR —NCDEN R. pdf From: Freeman, Hunter [ma i Ito: HFreeman(a)withersravenel.com] Sent: Thursday, August 29, 2013 3:07 PM To: Lucas, Annette Cc: Smith, Cherri L; Devane, Boyd Subject: RE: 13 -0634 MacGregor Downs Deck Addition Variance Annette — here is a pdf of what we submitted to Cherrie. 04711011110110-4 on, Hunter From: Lucas, Annette [ mailto :annette.lucas @ncdenr.gov] Sent: Thursday, August 29, 2013 2:49 PM To: Freeman, Hunter Cc: Smith, Cherri L; Devane, Boyd Subject: 13 -0634 MacGregor Downs Deck Addition Variance Hi Hunter — Did you submit more info on this with details on the RWH system? I can't locate more info in the file or in laserfiche. Thanks, A Annette M. Lucas, PE Environmental Engineer NCDENR I DEMLR I Stormwater Program 1612 Mail Service Center, Raleigh, NC 27699 -1612 (N111a.i.l.) 512 N. Salisbury St, Raleigh, NC 27604 1 9th Floor (i ocatior &, Parcels) Phone: (919) 807 -6381 1 Fax: (919) 807 -6494 1 Email: l nnetLe.1 -u as'(rLL(- Uicnr.��t-ry Website: http: / /portal.ncdenr.org /web /lr /stormwater Before printing this email, please consider your budget and the environment. E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. ENGINEERS PLANNERS I SURVEYORS August 7, 2013 NCDENR Division of Water Quality 1601 Mail Service Center, Raleigh, NC 27699 -1601 Attn: Cherri Smith Dear Ms. Smith. Attached please find our revised request for a variance from the Neuse River Buffer rules for 2,920 sf of Zone 2 of the buffer adjacent to the existing clubhouse at MacGregor Downs Country Club. The club plans to expand its food and beverage services and is proposing an expansion of the existing outdoor seating areas. We have revised our submittal per comments received from you and Ms. Annette Lucas. The revisions include a plan to offset proposed impacts using credits from a private mitigation bank, and revisions to the proposed rainwater harvesting system. The cistern has been revised to a 2,500 gallon cistern, and the location of the installation has been moved of the club's maintenance facility. Although a passive drawdown device is proposed, the club may also use a portion of the captured rainwater for maintenance purposes such as hand watering around the golf course. Should you have any questions regarding this request, please do not hesitate to call me directly at (919) 535 -5137. Sincerely, 115 Macl<enan Drive I Cary, NC 27511 I tel.: 919.469.3340 I fax: 919.467.6008 I www.withersravenel.com I License No. C -o832 1410 Commonwealth Drive I Suite 1o1 I Wilmington, NC 28403 I tel: 910.256.9277 1 fax: 910.256.2584 7o11 Albert Pick Road, Suite G I Greensboro, NC 27409 1 tel: 336.6o5.3oo9 I fax: 919.467.6008 AIF"' HCD North Carolina Department of Environment and Natural Division of Water Quality Pat McCrory Thomas A. Reeder Governor Acting Director July 3, 2013 Certified Mail Return Receipt Requested 7012 0470 0001 3843 0112 MacGregor Downs Country Club Attn: Russ Curtis 430 Saint Andrews Lane Cary, NC 27511 Subject: REQUEST FOR ADDITIONAL INFORMATION MacGregor Downs Deck Addition Dear Mr. Curtis: Resources John E. Skvarla, III Secretary DWQ #13 -0634 Wake County On June 20, 2013, the Division of Water Quality (Division) received your application dated June 5, 2013, requesting a Minor Variance from the Neuse Riparian Area Protection Rule for your project. The Division has determined that your application is incomplete and cannot be processed until we receive information regarding the mitigation of Zone 2 impacts totaling 2,920 square feet. Approval of a Variance is contingent upon mitigation for the impacts that are considered prohibited by this Rule. In this case, the required mitigation is 4,380 square feet (2,920 multiplied by 1.5). This mitigation can be satisfied through payment to a mitigation bank, payment to the NC Ecosystem Enhancement Program (NC EEP), or mitigation conducted by the applicant. If payment to a mitigation bank or NC EEP is chosen, please provide the approval letter regarding the availability of the appropriate buffer mitigation credits. Pursuant to Title 15A NCAC 02B .0233 (8), the applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 One Phone: 919-807-6301TAX: 919-807-6494 NorthCaroftna Internet: http : / /portal.ncdenr.orgtweb /wq/ws � f a 1��`l An Equal Opportunity 1 Affirmative Action Employer i�tC1[ MacGregor Downs Deck Addition DWQ# 13 -0634 Request for Additional Information Page 2 of 2 Please respond in writing within 30 calendar days of receipt of this letter by sending two copies of the above requested information to the Wetlands, Buffers, Stormwater — Compliance and Permitting (Webscape) Unit, 1650 Mail Service Center, Raleigh, NC 27699 -1650. Please be aware that you have no authorization under the Neuse Riparian Area Protection Rule for this activity and any work done within protected riparian buffers may be a violation of North Carolina General Statutes and Administrative Code. Please contact Cherri Smith at 919 - 791 -4251 or cherri.smith @ncdenr.eov if you have any questions or concerns. Since ely, ✓'t. Danny S ith, Supervisor Surface Water Protection — Raleigh Regional Office cc: Hunter Freeman; Withers & Ravenel; 115 MacKenan Drive; Cary, NC 27511 DWQ RRO 401 files Forrest Creek Riparian Buffer Mitigation Bank Rudolph Riparian Buffer Bank Statement of Availability July 29, 2013 NC Division of Water Quality U.S. Army Corps of Engineers Ms. Katie Merritt Mr. Monti Matthews 401 Oversight /Express Permitting Unit CESAW -RG -R 1650 Mail Service Center Raleigh Regulatory Field Office Raleigh, NC 27699 -1650 3331 Heritage Trade Center, Suite 105 Wake Forest, NC 27587 Re Project: MacGregor Downs Country Club This document confirms that MacGregor Downs Country Club. (Applicant) for the Project: MacGregor Downs Deck Addition has expressed an interest to utilize 4,380 Square Feet of Riparian Buffer Mitigation Credits from either of the EBX Neuse Riparian Buffer Umbrella Mitigation Bank /Rudolph Site, the Forrest Creek Riparian Buffer Mitigation Bank, or the Upper Neuse Buffer - Nutrient Reduction Mitigation Bank /Cedar Grove Site, all located in and approved to serve the Neuse HUC 03020201. As the Bank Sponsor for all sites, EBX attests to the fact that mitigation is available for transfer upon permit issuance at this time. Banker will notify applicant if the 4,380 Sq. Ft. of Buffer Mitigation become considered "At Risk" of not being available prior to permit issuance. Credits are not considered secured until payment in full is received from the applicant resulting in the issuance of a Bill of Sale and Affidavit of Sale by the bank acknowledging that the applicant has fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation obligation requiring the credits /units. The Banker will issue the Affidavit of Sale within three (3) days of receipt of the balance of the Purchase Price. Banker shall provide to Applicant with a copy of the Affidavit of Sale and a documented copy of the debit of credits from the Bank Official Credit Ledger(s) showing the permit number and the resource type secured by the applicant. A copy of the Affidavit of Sale, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the proper documentation. If any questions need to be answered, please contact me at 239 - 872 -1678 Best Regards ^44L Matthew R. Fisher EBX -EM, LLC 909 Capability Drive Suite 3100. Raleigh, NC 27606 Permit N (to be provided by DWQ) NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM RAINWATER HARVESTING SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. Captured Horizontal Surface Area of Roof Are you in Coastal County SA waters or ORW Areas? Storage Volume: Non -SA Waters / Other Design rainfall Rain Harvesting Volume Provided (Must include a factor of safety at least 1.2x design rainfall) Rain Harvesting Volume Provided Storage Volume: SA Waters & Saltwater ORW Areas Runoff Volume generated from 1.5' 1 -yr, 24 -hr rainfall depth at your site Pre - Development 1 -yr, 24 -hr Runoff Post - Development 1 -yr, 24 -hr Runoff 1 -yr, 24 -hr Runoff Volume Post -Pre Use 1.5” or Pre /Post? Volume of Rainwater Harvesting System Provided Rain Harvesting Volume Provided at Site Factor of Safety Rain Harvesting Volume Provided ft3 in ft3 _ ft 0.00 ft3 Fill out Non -SA Waters/Other Section OK OK Do not fill out this section Do not fill out this section Do not fill out this section Do not fill out this section Do not fill out this section 334:00 ft3 OK 1,33 _ OK 2498.65 gal ci 2 Form SW401- Rainwater Harvesting -Rev.3 Parts I. & II. Design Summary, Page 1 of 6 „,r s ,,, ,,, { s;( ,t,rJ ;�`:= s „'! ,: ,r•(,� - ;t�,u'•'��P 1 -k t) t,,,:: ,, n #+ \,,t,z:, otsrS`;14tiftu:,u 4 §::: Project name MacGregor Downs Deck Additftion Contact person Hunter Freeman Phone number 919 - 469-3340 Date 713112013 Drainage area number 1 . ,,, -- � a i t.. � . 4, fil�li',, Site Characteristics Captured Horizontal Surface Area of Roof Are you in Coastal County SA waters or ORW Areas? Storage Volume: Non -SA Waters / Other Design rainfall Rain Harvesting Volume Provided (Must include a factor of safety at least 1.2x design rainfall) Rain Harvesting Volume Provided Storage Volume: SA Waters & Saltwater ORW Areas Runoff Volume generated from 1.5' 1 -yr, 24 -hr rainfall depth at your site Pre - Development 1 -yr, 24 -hr Runoff Post - Development 1 -yr, 24 -hr Runoff 1 -yr, 24 -hr Runoff Volume Post -Pre Use 1.5” or Pre /Post? Volume of Rainwater Harvesting System Provided Rain Harvesting Volume Provided at Site Factor of Safety Rain Harvesting Volume Provided ft3 in ft3 _ ft 0.00 ft3 Fill out Non -SA Waters/Other Section OK OK Do not fill out this section Do not fill out this section Do not fill out this section Do not fill out this section Do not fill out this section 334:00 ft3 OK 1,33 _ OK 2498.65 gal ci 2 Form SW401- Rainwater Harvesting -Rev.3 Parts I. & II. Design Summary, Page 1 of 6 Permit No % Runoff % Runoff Used On -Site Primary Method Used On -Site % Runoff Treated On -Site Primary Method of Treatment % Runoff Infiltrated On -Site Total Runoff Accounted For Water Balance Calculations Attached? Cistern Overflow, Gutter, & Gutter Downspout Sizing 100 % passive drawdown 100 % OK No Closest City Raleigh Captured Roof Area 2000 ft, Overflow Pipe Diameter Needed (in Dec. Inches) 6 in Maximum Captured Area for above Overflow Pipe 2000 {t, OK Guttering (to be provided by DWQ) Number of Gutters Total gutters Do you have a plan details showing numbered gutters? No Please include plan details showing numbered gutters Do you have a detailed table showing slopes of all gutters? No gutters Do you have a detailed table showing diameters of all gutters? No gutters Do you have a detailed table showing downspout diameterof all Na Please include a detailed table showing downspout gutters? diameter of all gutters Do you have a detailed table showing maximum captured area for No Please include a detailed table showing maximum all gutters? captured area for all gutters Additional Design Elements Have you modeled this system using a water harvesting model? Yes OK Days to Draw Down Rainwater Harvester 3 days Overflow discharged to: Vegetated Area OK Does the overf low discharge directly to impervious surfaces? No OK What is the overflow velocity for the 10 -year storm? 1.5 ft/s Yes Please provide calculations to show non - erosive Is the overflow velocity non - erosive velocity Is a First Flush Diverter Used? No If First Flush Diverter used, where is bypassed water discharged to? Actual City Gary Closest City Raleigh Average Annual Historic Rainfall at your Site 42 in Percent of Rainfall that will Overflow Cistern 6 % Additional Design Elements Which Model? NCSU Does this cistern have a dedicated year -round use? Yes OK Screen Sizing at Entrance to Rainwater Harvester 1 mm OK Do you have a secondary water supply to the rainwater harvester? No Design for footing must be provided if the load of the cistern at full capacity is greater than the soils will Plans for the footing included in submittal? No support Is the cistern buried? No OK Pump provided? What is the pressure? psi What are the designated uses of the pump? Are Pump Sizing Calculations Attached? No Is Cistern Metal? No OK If Metal Cistern - Is Waterproof Bladder Provided? If the only use is irrigation - are plans provided? N/A OK Form SW401- Rainwater Harvesting -Rev.3 Parts h & II. Design Summary, Page 2 of 6 Permit Labeled as non - potable water? Yes OK Are Local & State pumbing codes followed? Yes Does this roof area deduct BUA from calculations of another BMP? No If so, what BMP? Notes: (to be provided by DWQ) Form SW401- Rainwater Harvesting -Rev.3 Parts I. & II. Design Summary, Page 3 of 6 Permit NO (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan tnfti s Sheet No. 1' Plans (1" 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Rain Harvester dimensions, Pretreatment system, -Any first flush bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Partial plan (1" = 301-or larger) and details of rain harvester showing: - Maintenance access - Volume - Area overflow is directed to and appropriate details of overflow area including vegetation, seeding plan and side slopes Screen sizing - Waterproof bladder if applicable - Footings - Pump design and sizing - Guttering with sizing and slopes, overflows, and Filter strip. 3. Section view of the roof and rain harvester (1" = 20' or larger) showing: Pretreatment and treatment areas, and - Inlet and outlet structures. 4• Rain harvesters shall not be used for sediment and erosion control during construction. 5. A table of elevations, areas, gutter slopes, gutter and overflow dimensions, incremental volumes & accumulated volumes for overall site to verify volume provided. 6. A construction sequence that shows how the rain harvester will be implemented on site. 7' The supporting calculations. $' A copy of the signed and notarized operation and maintenance (0 &M) agreement. 9' A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. 11 A copy of the printout from the water harvesting model used. 12 A copy of average annual rainfall at your site. Form SW401- Rainwater Harvest! ng -Rev.3 Part III. Required Items Checklist, Page 4 of 6 M�- Me m Gla3ic Usage 0"I sagel� on OutPLAs . .......... . ....... Daily Simulabon Results $233 Current Previous Total Volume Capt- U% 96% Usage Replace 20 f. 20% Anrwall Water Usage 45151 gal. 4GOM gal, Arrazal Water Savings S 228 $233 Am- Backup Water Ulsage 0 gal. 0 gal. Ann- Backup Water Cost SO SO Overflow Frequency 3% 2-1 Dry Cistern Freqpjency 89 88% Water Quality V61 - caw 100/. Annual Mdrogen Removed OA5 tbs. 14615s. Payback Period 11 yrs. 71 YTS. save ut] [-7� 4--D Simulation Date xrae L---5 9—p'j Speed Simulation Complete! D V�aie I u11�i/ Z —tea fA 3 � zo O s v S ® ASS.: NOR�WS N Y F I b � os J a2 \ -- O \ �l \I it0iy�h� NN +s K 3a L d LJ _ n - 'J (J o r 1 ^ �6 + I I � r i no n f� \ 3AiP�� x w a <aw w w � Ali w wn � Z J d z V } H i V Z_ ¢� z Q d N g J W Z `W W N , 3 w z J W (I°7 s v S b \ q -- O \ �l \I it0iy�h� NN +s K 3a L d LJ _ n - 'J (J o r 1 ^ �6 + I I � r i no n f� \ 3AiP�� x w a <aw w w � Ali w wn � Z J d z V } H i V Z_ ¢� z Q d N g J W Z `W W N , 3 w z J W (I°7