Loading...
HomeMy WebLinkAbout20130953 Ver 1_401 Application_20130913401 WQC /Buffer Application To: Cherri Smith, Raleigh Regional Office From: Webscape Unit, Central Office Date: 9/05/2013 DWQ M 13 -0953 Project Name: William Ferrell Home County: Wake Addition 60 -day Processing Time: 09/04/13 — 11/03/13 ® Please review attached application /additional information. ❑ This is an Individual Permit and will be issued out of the Central office. ❑ This is a "Courtesy Copy" and is located in laserfiche. ® A copy of the application /stormwater has been given to Boyd for review. ❑ Restoration Project NOT for mitigation (issued by RO). A copy has been given to Eric. ❑ Non -EEP mitigation project (issued by RO). A copy has been given to Eric. ❑ EEP full delivery project (issued by RO). A copy has been given to Eric. ❑ EEP design -bid build project (issued by RO). A copy has been given to Eric. di WA rF4 G < SEP - 4 2013 20130953 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express © Riparian Buffer Authorization, le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ❑X No 19. Is the project located in any of NC's twent�r coastal counties. if yes, answer 1 h' below. []Yes Q Na 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes Q No 2. Project information 2a. Name of project: Residential home addition 2b. County: Wake '2c. Nearest municipality / town:; Raleigh 2d. Subdivision name: Budleigh 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: William & Melissa Ferrell 3b. Deed Book and Page No. 09660/2115 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3117 Agecroft Road 3e. City, state, zip: Raleigh, NC 27608 3f. Telephone no.: 919 - 783 -6887 3g. Fax no.: 919- 782 -2828 L3h. Email address: kent�neuhoffcustombuilders.com Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant information (if different from owner) 4a. Applicant is: Q Agent [];Other, specify: 4b. Name: Ken Neuhoff 4c. Business name, (if applicable):` Neuhoff Custom Builders, Inc. 4d. Street address: 3612 Corbin St. 4e. City, state, zip: Raleigh, NC 27612 4f. Telephone no.: 919- 786 -0111 4g. Fax no.: 919 -782 -2828 4h. Email address: ken @neuhoffcustombuilders.com 5- Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 Project information and Prior Project History) ;Property Identification �r�je6_Tcii�ntlffqqtion __ (1a:_ — 10795826681000 PIN o�pj4rm),','� 11b. Site coordinates-(m- decimal -'35.8175 _r', -78.6672 11114atituck, Longitude., 'im Property' s-ize:" I 0.562 2., 'Surface Waters '2a, --Name of nearest body of water to proposed project-, UT to SW Prong Beaver Dam Creek 2b. Water Quality Classification of nearest receiving water. C:NSW 2c. River basin: Neuse River 7 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Forested lot adjacent to residence In a residential neighborhood. Property Is currently not being used for any purpose. 3b. List the total estimated acreage of all existing wetlands on the property: 0.085 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 197 3d. Explain the purpose of the proppsed project: To provide living space for the property owners aging mother. 3e. Describe the overall project in detail, including the type of equipment to be used: The project Includes a =Mr attached addition to the existing house with a garage on the ground level and mother-in -taw suite on the second level. 1A 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property project (including all prior phases) in the past?, ❑'Yes. 0 No ❑ Unknown Comments: no wetlands In area of proposed construction 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yes, who delineated the jurisdictional areas? 'Name (if known): Agency/Consultant Company: I Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History Sa. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes [],No Q Unknown If yes, explain in detail according to "help file instructions. 6. Tuture Project Plans 6a. Is this a phased project?' ❑ Yes Q No 6b. If yes, explain. (Page_3 of 10)_ ',Pq_N Form-- Version 1.4 January 2009; C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries Q Buffers, ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No We - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary m 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - S2 - Choose one S3 - Choose one S4 - Choose one - S5 - Choose one - Se - Choose one 3h. Total stream and tributary Impacts 31. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: S. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin ?, ® Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. - Buffer Impact number — Permanent (P) or ,Temporary 6c. Reason for impact 6d. 'Stream_ name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact '(square feet B1 P residential addition UT to SW Prong Beaver Dam Creek No 0 510 B2 - Yes/No B3 - Yes/No B4 - YestNo B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 0 1 61, Comments: e existing house was built current resident n 1993 wasp or to enforcement Neuse Buffer. The -- - - - proposed addition Is direly in line with the existing house and no closer to the stream. Page 5 of 10 D. Impact Justification and Mitigation 1. 'Avoidance and Minimization; --- - -- --- — --- ----- - - Ia. Specifically describe measures t9ken to avoid or minimize the proposed impacts in designing project. The design of the proposed addition has been modified to avoid Impacting zone I and zone 2 as much as possible and has resulted In a less than favorable design for the homeowner. Ib'. Specifically describe measures taken to avoid or minimize the _proposed impacts through construction techniques. We will hand dig footings along the bads wall closest to the stream to minimize Impact as much as possible. Light equipment will be used only where absolutely necessary. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in-lieu fee program ❑ Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete If Making a Payment to ln4leu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 0. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. ;Buffer Mitigation (State Regulated Riparian Buffer Rules) —required by DWQ, 6a. Will the project result in an impact within_ a protected riparian buffer that requires ;buffer mitigationZ Yes No 6b. � If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mtigation. Calculate the amount of mitigation required. i T {Zone; :6c. _ - Reason for impact - ,6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet), Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. °Total buffer mitigation required:, 6g. , if buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments) Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified ©Yes [],No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why. The rainwater downspouts will be installed with splash pads and surrounded by a crushed stone bed to diffuse flow. Existing house downspouts large lawn is least 75 Q Yes ❑ No slow and the water empty onto a which at feet from the creek bank. 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local novernmerif s jurisdiction is this project? ❑ Phase II ❑ NSW 3b. Which of the following locally- implemented stormwater management programs USMP apply (check all that apply): Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑Coastal counties ❑HQW 4a. Which of the following state - implemented stormwater management programs apply ❑ORW (check all that apply): ❑Session Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federaVstateAocaq funds or the ❑ Yes ❑ No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered yes° to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 21-1.0600), isolated, Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,' ❑Yes Q No or Riparian_Buffer Rules (15A NCAC 2B .0200)Z 2b. is this an after -the -fact permit application? ❑ Yes, Q No 2c. if you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in Yes Q No ;additional development, which could impact nearby downstream water quality ?, 3b. if you answered yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description.. This addition serves a single family residence and the proposed addition is for a specific purpose of providing housing for an aging parent. No further development Is planned. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 u 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No 5c. If yes, indicate the USFWS Field Office you have contacted. 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? 44r N "b�p' ,ApplicapgAgenrs Printed Name, ApplicantlAge sig re (Agenfs signature is vali an authorization} letter from the applicant is rovided. Date Page 10 of 10 CHESTERFI�fjLi? RD �C; N; -iY VIAP v� N. l. 'S SUBJECT PROPER"FY IS IS NOT 1 OCATED IN A SPECIAL FLOOD HA -7 Q 1�j I ­ARD AREA AS DESIGNATED ON FEDERAL EMERGENCY MANAGEMENT AGENCY (F.E.M.A.) FLOOD INSURANCE RATE MAP NUMBER 3720079500,1 ZONE D13 9976, 690 S1A7E %),F NORTH CAROi-!,;NA Si COUN_ I Y OF WAKE F1_­IIS PLAI Or—?. MAP­1�5 NOT, A SUBDIVISION, BUT A R;E.COMBiNA`11ON \',-"F FIREVIOUL N - R _PEARED BL-FORE ME _I HIS DAY, EACH Y FO Pt-AT TED PROP�E AND MEETS ALL STATUTORY RZEQUIREMENTIS FOI,<' RECORDING. TI--11AT THE- LLOWING PERSON(S) PEr SONAI-LY AP 'D T HF IFOOING DOCUMEN'T FOR FHE ACKNOINLi4.H_),GING TO ME THAT HE OR SHE VOLUN" __Y SIGN,' Y INDICATED--wi qk _&efr P PURPOSE STATED THEEREIN AND IN THIE CAPACII t41 { DA T E--.-.-- " pi�' 200V 'A 64 qLANNINQ DII'! RE, TOR/wAKE COUNTY REVIEW OFFICER Pe, -E RED l ME_ �La_A,_,_ NOTARY PUBLIC MY COMMISSION EXPIRES This certiflcs cind warrants !no,, the ur-idersiqned is (ore) the sole. owner s of tne property shown on this map or plot ant r !,y the ex ceptions on recon-', �, * �EIP ccoornpanying sheets subieci to ing re ­y in fee si: m p! e JAMES K WILEY acquired the properL cy deed's) recorder: SHARON 13 VIL-FY g' - %-a ;l a office of the Regis of Deeds of Wake County, North " roiin or I-cs 'have) the right to Cpl PIN# 0795 82 4-618 SANTIAGO ESI*R�IADA otherwise, as snown below and as such, DB 9976, PC 689 JV1\� MARY MARTIN ESTRADA and thct Tine dedicator�s) will convey the, properLy in fee simple, PIN# 0795 82 _�881 a J! me accins,, ie iawful claims of warrant and cefend the t'+, I D8 11314, PC 2416 Dy sibmission 14� j persons whomsoever unless excepted herein and thot approval I (we) do deaico'e to the City of 0 T 1 of this plot or moo for appi -s, public easements, public FDWARD M SC , ­10E:'N BORN Raleigh for pUblic use- all public'. street PIN# 0795 82 4566 ihese into public parks and pubili (Gs intc s,,s to (-,(,enw(jys e code and indicate of, ore defined In n d on t,h!' � ml 0 p ry s p o C and as the son,".' may be shown thereon, for cit ol.,rooses to which the city rnoy devote or allow the some to be used . and upon ceolance c':ercl-of in occ-,ordonce with cli 'City Poi' i�At._EiGirli for ordinances, la conditions of the City of r regi� jtions or said dedication slno l be irrevocable tie benefit o� ,ne public, 4z provided, any dedication of easement, for storm drainage are not f - )ode to the 0 mode to the City of Raleigh but are irrevo(,,GD!y rr EII �20 A �neir `16 r 110,92, properties shown hereon for Q�) i subsequent owners of any and all 11 use end benefit subject to the condit.:ons or 'b", l`c), GUY EIP pp ( f) of Section I and Sect-on 4 of • "City Storm A (d), and d WIRE&-.-- Fl FT, P-L, (Resolution 19*70-7/12 as tine some may EXISTING NP J !�rainclge olicy", e from -n e fiche acne ae M.H. t a 7> --�-)-7/, z:n rr (s4.-�4 C�) fi J A0. i 0 4 �110/S 0 CH ' ESI ERFIELD INVESTMENTS ;_i_.0 PIN# 0795 82 6478 DB 11223,45, PC STATE OF NORT i CAROLINA L ; -0-11, 1 1; WAKE COUN_P( E 1, J-01-IN Y. F HLLPS JR., PROFESSIONAL LAND SU-' VEYOR CER­IFY IHAJI THIS MAP WAS DRAWN UNDER MY SUPERVISION, DEE).J DEESCRIPI-ION RECORDED IN DEF-D BOOK THAI THE- RATIO 0r FIRE.ClSION AS PAGE Ti - CALCULATED 1S ji2(-�, 11 HAT THE BOUNDARIES -TED NOT SURVEYED ARE SHOWN AS 3R'OKEN LINES PLOI FROM INFORMATION FOUND IN Boor< --- AS______ PAGE____5B_&6__- THAT THIS MAP WAS PRE-PARr.D IN ACCORDANCE WITH C, S. 47-30 AS AMENDED, Alff1iESS MY HAND AND SfAL ',HIS DAY Or 2 1,----- 07 9 6 F-YOR, 1 JOHN Y, PHELPS JR., PROFESSIONAL LAND SURVE L-1319 CER. TO ONE OR MORE. OF ]HE (,QLLOWING 101 7 ILI -V OWN Al um 4 TE ILE DA 0 OWNER/1"IT0 12 24,514, SQ. r-T. 0.562 AC 444 BRlc C� 0 TWO STORY _ 44 C- ? BRICK" PLA!:, NOT TO BE RECORDt-_:�` 03 -DAY ()F A,-t Vk WITH (A AFIFER, -i M tit BASEMENT P CO PY TO Br' RF1AiNED POR TH;-_ C,dy CR J l S_ 41 0-U I V '411S PLA-11- S_'­-` k r\ ki l i i!l­ C; CIA /U v. 0 BRICK F iCK VINI-t- - ------ 3 1` 0111 :j_ PATIO x C- T W C ST CRY. -) I 10 M 3' LP p S n I L.� EIRICK __ I -I— I U P 171 — f L_ - co WITH I'D BASEMENT Y111-11 t-, G A ARAU + rn GRAPIOC SCALE �j 0 CV z C) 0 17 �o 0 01 2 1 .35 1 108.65 EIP I 4 EIP ACIA.. 3 CL- IN FEET S03028'01S'jW 130l00 I iAich - 30 ft. PIP EDGE OF PAVEMENT EIP ALL 'LiEAtRiiNGS Sc DiSTANCFS ARE - ri�_!S pLI\ � !S 7 F ANOTHER D. FHAI A SURVLY 0, 4;IrIt'4, ;.4 R r AGE 14 OLD 16815 SF CORRECT F -if-LD OF EXISTING ORDERS RECOMBINAHON PARCELS, A COURT OR +7699 SF-78,51 SF TOTAL 24-5114 SF2,3274 11 t IVEASUREMENTS EXCEPTIONS TO THE ,g�LFINITION OF SUBD��ISfON. PUBLIC R/W 50' SEAL /SCALED FROM BM 194 PG 33) BOOK OF MAPS 194" PAC ..... ..... _W' -, FESSIONAL LAND SURVEYOR PRO �ORS,10� 319 BOOK 01- D' E D 12-.586 PACE 2 Y. BOOK 0 F DEEDS 0 E_ 9660 PAGE 2' 11 Jp V :A <--v __IED F.VA, X`b�IVER 1-"f:- AQf SHOWN ON r­,E RECORDED PLAT IDENTli j'' & AREA 1 -ABLE RIPARIAN BUFFER SHALL BE MAINTAINED IN PERPETUITY IN TH IR NATURAL OR MITIGATED CONDITION. NO PERSON OR ENTITY SHALL. FILL, GRADE, EXCAVATE, OR PERFORM ANY OTHER LAND DISTURBING ACTIVITIES; NOR i CONSTRUCT ANY STRUCTURES CUT, REMOVE, OR HARM ANY VEGETATION; NOR CONS NOR ADD ANY ADDITIONAL IMPERVIOUS SURFACE, NOR ALLOW ANIMAL GRAZING _1 U OR WATERING OR ANY 01HER AGRICULTI RAL USE ON SUCH PROTECTED AREAS WITHOUT WRITTEN AUTHORIZATION OF THE DIVISION OF WATER QUALITY (DW OR COMPLIANCE WITH THE RIPARIAN BUFFER PROTECTION RULES (15A NC 2B .0233 OR .0259). THIS COVENANT IS TO RUN, WITH THE LAND, AND SI­ A BE BINDING ON THE OWNER, AND ALL PARTIES CLAIMING UNDER IT. 2) RECOMBINED PROPERTIES ARE SUBJECT TO PART 10, CHAPTER 9 (STORMWATE CONTROL AND WATERCOURSE BUFFER REGULATIONS) OF THE RALEIGH CITY CODE. 3) LOT 12 WAS NOT DRAWN FROM A CURRENT FIELD SURVEY. LOCATION OF IMPROVEM TAKEN FROM A SURVEY BY JOHN Y PHELPS JR., PLS DATED 07/13/93, !TVA M A 0 C, K 0 1 Cr Lit /91 r IN F-1 S 4�', LOT 12 14 OLD 16815 SF 31105 SF NEW +7699 SF-78,51 SF TOTAL 24-5114 SF2,3274 Sr Now ""o-If A'S r_ # R- -- 6 7_-- -081 0-795 ZONED R­4. V 782 82 6,'.,) 7 PIN -HU/95 82 6 SCALE RECOMBINATION OF LOTS 12, 13, 14 BLOCK 4 DATE BUDLEIGH, I-AKEVIEW SECTION IINT(J" 04/16/08 LOTS 12 AND '14 [.3h_OCK 4 FD, BK OWNERS: FERRELL, WILLIAM G. MELISSA L. 3117 AGECROF-I RD 501 CHESTERFIELD RD RALEIGI-I, N.C. 480/1235 ( 56838 RALE-ICiH, N. --v C_ S N A s r,vr- a _101 1N Y. C I- r- ,,) j PUR OAK 1'l 10 `1 / i RAIJ D(", \ 11 - IE- C''i � ", i � \.C. 2_/612 PlION- '�'q� - _�':j