Loading...
HomeMy WebLinkAbout20130952 Ver 1_401 Application_20130913�oF warF90 O ^C Q�c��od�p SEP - 4 2013 20 1 30952 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ❑ Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number. 1 c. Has the NWP or GP number been vedfed by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express .[ .Riparian Buffer Authorization 1e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No It 1s payment into a mitigation bank or in -lieu fee program proposed for: mitigation of impacts? If so, attach the acceptance letter from mitigation bank, -or to -lieu fee program.; ❑ -Yes ❑ No 1g. Is the project located In any of NC's twenty coastal counties. If yes, answer 1fi below. ❑Yes ;� No .1h. Is the project located wdhin a NC DCM Area of Environmental Concom (AEC)?. ❑ Yes ❑ No 2. Project Informatfori -------------- --- - - - - -- - -- 2a. '; Name of project '2b. County:; e 2c. kdarest municip; kGty / town: g; 2d. Subdivision name: vom5v Nf i I I S 2e. NCDOT only, T.I.P. or state project no: 3; 'Owner Information' 3a. Name(s) on Recorded Deed:. mu ; Qu Ibe 3b. Deed Book and Page No. S d !X Responsible Party (for LLC if; applicable):; 3d. Street address:' p e I va- 139. City, state, zip: DVA a7 Z. Telephone no.:, I q - ill - 3g. Fax no.:, - -3h. Email address: Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is:; ❑ Agent ❑ Other, specify: 4b. Name: MAMAe 1:1t .Saves 4Sbn . bncoc! 4c. Business name (f applicable): SPi re jo 4 S Lt—c 4d. Street address: 1en 2 S 4e. City, state, zip: a-i Lo I 4f. Telephone no.: . -7 _ 7 49. Fax no.: A. Email address: f" IM ho gf n as-Or.1, n 5. Ageni/Consultant information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip:, 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 eA M Pr *1nformsA6rj',*fiO Prior _.!�iRject History) Y- E .Step at ;Qrid670–M-1 gogkeii)-) I 0*&i Lig t-�go qlq (2) ,'Surface Waters) ,2a. Name of nearest body of water to prop osed PrOled) !2b. Water Quality Classification ol"nearest receiving water:; 2c. River basin.*,: e, ' A; Project biscilpeon: ,3a. Dftcrii 9 the existing conditions on the site and the general land use In the vicinity of the pi 41 th time of thij 0 project is -application:, CurreAot Y"W, &we 1'::r ovRr-Orow.-I, O'er lTeer C."d VS ;JA#JO/) , Aor-b6-''� " bul'id /)OW sin"qte &P19,e 01-7 A004. 3b. List the total estimated acreage of all existing wetlands on the property: -3c. Ust the total estimated linear feet of all misting streams (intermittent and perennial) on the property:: ert_ Zs` :3d. Explain the purpose df-16e proposed project: 3e. Describe the overall project in detail, including the type of equipment to be used: dos!-r"alb"). cca-'Ll, Irite- pe► -VOL&I e%Vh-,"d,%4 4. Jurisdictional Determinations 4a. Have NrisdiOldnal wetland or stream determinations by the' p obtained ,R9r,�at4Jg!.I1eqrti&qMe !a Cops I .AgEob . net *bjebt OW6ding A prior phases) in Nijiit?, Yes- ❑ W 13 OnK�o­w­n­- :Comments:, 4b. If the Corps made the jurisdictional determination, what type of determination was made? ❑ Preliminary ❑ Final 4c. If yet, who delineated the Jurisdictional areasf Narn6(If known):. -'Agency/C*o'n'sidtantCo*m"pan Other'. . Y: 4d. -if yes, list the dates of the Corps jurisdictional determinations or State determinations ----- and attach documentation. 11 3 13 .34 5. 'Project History -'6a- D - T: �Acatlons'been req jy8'OerrOI4.*.-" requested or obtained 'to Afils pipject (including all prior phases) In the pas E]Yii ONo, ❑'Unknown -5b. If yes, explain in detail according to'help, filer instructions.] S. 'Future Protect Plans` ❑ Yes No Ob. 'If yes, explain.; ,Page 3, of 10) - PQM,FF6i ( t%--. F,4V&O-rMTf-4'%IAnuary 2009) C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams — tributaries ❑ lBuffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland Impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No W4 - Choose one Choose one Yes/No W5 - Choose one Choose one Yes/No we - Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary Impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream Impact number Permanent (P) or Temporary () 3b. Type of Impact 3c. Stream name 3d.- Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - S2 - Choose one - S3 - Choose one S4 - Choose one - S5 - Choose one - SO - Choose one 3h. Total stream and tributary Impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.4 January 2009 D. Impact Justification and Mitigation 1. 'Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed #*i O� project. GOOJ%nJ fa,.�l nod- G'ncl�c.t, ,�� jjc er2oye. 1 b. Specifically describe measures"taken to avoid or minimize the proposed impacts through construction techniques.` 0 k�Fr i4' mite *0 bd +,+ %110 f,.'or 4 + Ai,,,g 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2s. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ❑ No 2b. if yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete If Making a Payment to In -lieu Fee Pro ram 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 6. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form —Version 1.4 January 2009 4. Open Water Impacts If there are proposed Impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual list all open water impacts below. 49. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water Impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed. then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 51. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If spy Impacts require miti atiori, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ;R Neuse ] Tar - Pamlico ❑ Catawba []Randleman ❑ Other: 6b. `Buffer Impact• :number —; .Permanent (P) or, iTe 6c. = Reason for impact; 6d. -Stream name 6e. Ouiteri mitigation ;requiredf 6f. :Zone 1) Impact (square :feet ; 8g, Zone 2i impact (square ;fee i 61 - fl—AA .t4:1- FJ y cx%&K Yes/No 132 - Yes/No 133 - Yes/No B4 - Yes/No B5 - Yes/No Be - Yes/No 6h. Total Buffer Impacts: 61. Comments: Page 5 of 10 S. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWO 6a. Will the project result in an impact within "a protected riparian buffer that requires` buffer mitigation ?, 0 Yes No 1 9 6b. If yes, then identify the square feet of impact to each zolis of the riparian buffer that requires mitigation. Calculate the amount of mitigation required.; .Zone tic Reason for impact 6d.; Total impact .(square feet) Multiplier tie. Required mitigation (square feet)", Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation Is proposed (e.g., payment to "private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)., 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. .Diffuse Flow Plan' 1a. Does the project include or is it adjacent to protected riparian buffers Identified .within one of the NC Riparian Buffer Protection Rules ?_ ❑Yes' ❑ ;No' 1b. If yes, then is a diffuse flow plan Included? If no, explain why.- Yes ❑ No 2. Stormwater Mana ement Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local governmenrs Jurisdiction is this project? 3b. Which of the following locally- implemented stormwater management programs apply (check all that apply): ❑ Phase II ❑ NSW ® USMP Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): ❑Coastal counties ❑HQW BSesslon ORW Law 2006 -246 ❑Other. 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form —Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public ( federa lstatellocaq funds or the ❑ Yes ❑ No use of public (federal /state) land? 1b. If you answered "yes' to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or Slate ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered *yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a..Is the site in violation of DWQ Wetland Rules (15A NCAC 21­1.6500). Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,: ❑ Yes No :or Riparian Buffer Rules (M NCAC 28.0200) ?i 2b. ;Is this an after - the -fact parmit application? ❑Yes No 2c: If you answered wyes7 to one or both of thier above questions, provide an explanation of thie violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future Impacts) result In ❑Yes j�No additional development, which could impact nearby downstream water quality ? / 3b. If you answered Nos* to the above, submit a qualitative or quantitative cumulative impact�Onaiyshi in accordance with the• most recent DWQ policy.*jijroii ariswereii "no; provide a short narrative description: 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9of10 PCN Form —Version 1 .4 January 2009 . A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑Yes ❑ No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ❑ Yes ❑ No Sc. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) ea. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ❑ Yes ❑ No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? 13 'Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Appficant/Agenrs Printed Name. Applicant/ is Signature (Agent s stnatm Is agd onV B an authodzatlm, ;letter from the appllcW Is muted. Do Page 10 of W