HomeMy WebLinkAbout20130948 Ver 1_401 Application_20130913JOHN L. PIERCE & ASSOCIATES, P.A.
LAND SURVEYING - LAND PLANNING - MAPPING
P.O. BOX 1685
JACKSONVILLE, NC 28541
OFFICE: (910) 346 -9800 FAX: (910) 346 -1210
E -MAIL: beMb@ilpnc.com
Or hriani(nlilnne rnm
20130948
Letter of Transmittal
— .,,e..... -._ ...
TO: Jennifer Burdette
NCDENR
401 Wetlands Unit
1650 Mail Service Center.
Ralei zh. NC 27699 -1650
DATE:
August 29, 2013
ATTENTION:
Jennifer Burdellt
Re:
BndgeWrt Subdivision
COPIES
DATE
NUMBER
DESCRIPTION
5
"Pre- Construction Notification PC form " for 401 Certification
1
Check in the amount of $240.00
_.. _
0
MN—R-- - aMR-0—AL".
wal.w
REMARKS:
2 ®130948
OF W A TF�
\off pG Office Use Only:
Corps action ID no.
o DWQ project no.
Form Version 1.3 Dec 10 2008
Pre - Construction Notification PC Form
A. Applicant Information
1. Processing
I e
1 a. Type(s) of approval sought from the
Corps:
®Section 404 Permit ❑Section 10 Permit
1b. Specify Nationwide Permit (NWP) number. 29 or General Permit (GP) number.
1c. Has the NWP or GP number been verified by the Corps?
❑ Yes
® No
Id. Type(s) of approval sought from the DWQ (check all that apply):
® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required?
For the record only for DWQ 401
Certification:
® Yes ❑ No
For the record only for Corps Permit:
® Yes ❑ No
1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu
fee program.
❑ Yes
® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
® Yes
❑ No
1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes
® No
2. Project Information
2a. Name of project:
BRIDGEPORT
2b. County:
ONSLOW
2c. Nearest municipality / town:
SNEADS FERRY
2d. Subdivision name:
BRIDGEPORT
2e. NCDOT only, T.I.P. or state
project no:
3. Owner Information
3a. Name(s) on Recorded Deed:
BEAVER CREEK INVESTERS
3b. Deed Book and Page No.
3359 436
3c. Responsible Party (for LLC if
applicable):
JOHN PIERCE
3d. Street address:
PO BOX 1685 S E P
— .3 20113
3e. City, state, zip:
JACKSONVILLE, NC, 28540
910 - 346 -9800 yy
QUALMY
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 10
PCN Form — Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is:
® Agent ❑ Other, specify:
4b. Names.
HAYWOOD PITTMAN
4c. Business name
(if applicable):
PITTMAN SOIL CONSULTING
4d. Street address:
1003 GREGORY FORK ROAD
4e. City, state, zip:
RICHLANDS, NC,
4f. Telephone no.:
910 - 330 -2784
4g. Fax no.:
4h. Email address:
PITTMANSOIL @YAHOO.COM
5. Agent/Consultant Information (if applicable)
5a. Name:
HAYWOOD PITTMAN
5b. Business name
(if applicable):
PITTMAN SOIL CONSULTING
5c. Street address:
1003 GREGORY FORK ROAD
5d. City, state, zip:
RICHLANDS, NC,
5e. Telephone no.:
910 - 330 -2784
5f. Fax no.:
5g. Email address:
PITTMANSOIL @YAHOO.COM
Page 2 of 10
PCN Form —Version 1 .3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID):
766-23
1b. Site coordinates (in decimal degrees):
Latitude: 34 31 39.57 Longitude: - 77.27
10.27
(DD.DDDDDD) (- DD.DDDDDD)
1c. Property size:
91.87 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project:
TURKEY CREEK
2b. Water Quality Classification of nearest receiving water:
SA
2c. River basin:
WHITE OAK 03030001
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
RECENTLY MOWED TIMBER LAND AND OLD FARM FIELDS
3b. List the total estimated acreage of all existing wetlands on the property:
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
3500
3d. Explain the purpose of the proposed project:
RESIDENTIAL DEVELOPMENT
3e. Describe the overall project in detail, including the type of equipment to be used:
CONSTRUCTION OF ROAD CROSSING WITH FILL AND HEAVY EQUIPMENT
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
[D Yes El No ❑Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made?
El Preliminary ED Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): DAVID BAILEY
Agency /Consultant Company: PSC
Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
2010
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
El Yes ® No ❑ Unknown
5b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project?
❑ Yes ® No
6b. If yes, explain.
Page 3 of 10
PCN Form — Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
® Wetlands ® Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a.
2b.
2c.
2d.
2e.
2f.
Wetland impact
Type of jurisdiction
number —
Type of impact
Type of wetland
Forested
(Corps - 404, 10
Area of impact
Permanent (P) or
(if known)
DWQ — non-404, other)
(acres)
Temporary
W1 ®P ❑ T
FILL
RIPPARIAN NON
® Yes
® Corps
044
RIVERINE
❑ No
® DWQ
W2 ®P ❑ T
FILL
RIPPARIAN
❑ Yes
® No
® Corps
® DWQ
022
W3 ®P ❑ T
FILL
RIPPARIAN
[I Yes
❑ No
❑ Corps
❑ DWQ
018
W4 ❑ P [IT
❑ Yes
❑ Corps
❑ No
❑ DWQ
W5 ❑ P [IT
❑ Yes
❑ Corps
❑ No
❑ DWQ
W6 ❑ P ❑ T
❑ Yes
❑ Corps
❑ No
❑ DWQ
2g. Total wetland impacts
.246
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact
Type of impact
Stream name
Perennial
Type of jurisdiction
Average
Impact
number -
(PER) or
(Corps - 404, 10
stream
length
Permanent (P) or
intermittent
DWQ — non -404,
width
(linear
Temporary (T)
(INT)?
other)
(feet)
feet)
S1 ® P [--IT
CULVERT #2
UT
❑ PER
® INT
® Corps
® DWQ
4
88
S2 ®P ❑ T
CULVERT #3
UT
❑ PER
® INT
® Corps
® DWQ
4.5
60
S3 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S4 ❑ P ❑ T
[]PER
❑ Corps
❑ INT
❑ DWQ
S5 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
S6 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
148
3i. Comments:
Page 4 of 10
PCN Form —Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a.
4b.
4c.
4d.
4e.
Open water
Name of waterbody
impact number —
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary
01 ❑ PEI T
02 ❑P ❑T
03 ❑P [IT
04 ❑P ❑T
4E Total open water impacts
4g. Comments:
5. Pond or (Lake Construction
If pond or lake construction proposed, then complete the chart below.
5a.
5b.
5c.
5d.
5e.
Wetland Impacts (acres)
Stream Impacts (feet)
Upland
Pond ID
Proposed use or purpose
(acres)
number
of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5E Total
5g. Comments:
5h. Is a-dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWO)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If any impacts require mitigation, then you MUST fill out Section D of this form.
6a.
❑ Neuse ❑ Tar - Pamlico ❑ Other.
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
for
Stream name
mitigation
(square feet)
(square feet)
Temporary
impact
required?
B1 ❑P ❑T
❑Yes
❑ No
B2 ❑P ❑T
❑Yes
❑ No
B3 ❑P ❑T
❑Yes
❑ No
6h. Total buffer impacts
6i. Comments:
Page 5 of 10
PCN Forth — Verrsiort 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
ROAD PLACED IN AREA TO AVOID IMPACTS AS MUCH AS POSSIBLE. IMPACT 1 MOVED TO AVOID STREAM
CROSSING.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
INSTALLATION OF SILT FENCE AROUND ALL WETLAND AREAS AND PLANTING A GRASS MIXTURE AND COVERING
IT WITH STRAW UPSLOPE OF THE WETLANDS TO HELP STABILIZE TO MINIMIZE EROSION.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State?
® Yes ❑ No
2b. If yes, mitigation is required by (check all that apply):
® DWQ ® Corps
2c. If yes, which mitigation option will be used for this
project?
® Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank: BACHELORS DELIGHT
3b. Credits Purchased (attach receipt and letter)
Type RIPPARIAN
Quantity 0.5
3c. Comments: STREAM 148 LINEAR FEET
4. Complete if Making a Payment to In4leu Fee Program
4a. Approval letter from in -lieu fee program is attached.
❑ Yes
4b. Stream mitigation requested:
linear feet
4c. If using stream mitigation, stream temperature:
❑ warm ❑ cool []cold
4d. Buffer mitigation requested (DWQ only):
square feet
4e. Riparian wetland mitigation requested:
acres
4f. Non - riparian wetland mitigation requested:
acres
4g. Coastal (tidal) wetland mitigation requested:
acres
4h. Comments:
5. Complete If Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form — Version 1.3 December 10, 2008 Version
S. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation?
❑ Yes ® No
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
Zone
6c.
Reason for impact
6d.
Total impact
(square feet)
Multiplier
6e.
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund).
6h. Comments:
Page 7 of 10
PCN Form — Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1b. If yes, then is a diffuse flow plan included? If no, explain why.
❑ Yes No
❑
Comments:
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project?
>25 %
2b. Does this project require a Stormwater Management Plan?
® Yes ❑ No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: COASTAL COUNTY
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narr~ative description of the plan:
PLAN WILL PREPARED BY MARK HARGROVE PE
❑ Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan?
® DWQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
❑ Phase II
3b. Which of the following locally- implemented stormwater management programs
❑ NSW
❑ USMP
apply (check all that apply):
❑ Water Supply Watershed
❑ Other:
3c. Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
4. DWQ Stormwater Program Review
® Coastal counties
4a. Which of the following state - implemented stormwater management programs apply
El HQW El ORW
(check all that apply)
❑ Session Law 2006 -246
❑ Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached?
❑ Yes ® No
S. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes ❑ No
5b. Have all of the 401 Unit submittal requirements been met?
❑ Yes No
Page 8 of 10
PCN Form — Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federaUstate/local) funds or the
❑ Yes ® No
use of public (federal /state) land?
1 b. If you answered °yes° to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered °yes° to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
letter.)
❑ Yes ❑ No
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards,
❑ Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after- the -fact permit application?
❑ Yes ® No
2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
PLURIS
Page 9 of 10
PCN Form —Version 1.3 December 10, 2008 Version
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or
❑ Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act
Yes ❑ No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted.
® Raleigh
❑ Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
usfw web site Natural HERITAGE
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
SOUTH ATLANTIC HABITAT AND ECOSYSTEM IMS
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
Yes No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
STATE HISTORIC PRESERVATION OFFICE WEB -SITE
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA- designated 100 -year floodplain?
❑ Yes ® No
8b. If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? NC FLOODPLAIN MAPPING PROGRAM WEBSITE
HAYWOOD PITTMAN
8 -20 -13
ApplicanVAgents Printed Name
ApplicanVAgents Signature
Date
(Agents signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
PCN Form — Version 1.3 December 10, 2008 Version
BA U3M DELIGHT w f nGATlON BANK
AUPWI5,2W
M. lfay�ttood Plttrnan
P.0. Bohr 1387
Oddand4 NC 20574
PI . " VAMN09416W
FUM Bachelors OdbM AAitlPOW Bards
C/o Land his 200 a - tt Group, b=
3803 WHOWdle Awenus, Sint& 15
is ! 610, � NC 2M
a suarht to your rore coedit request, Bachelors Delight Mh%ptbn Bank (BOMB) is provifg canf nwMon
of acceptance to supply riparian wedand and stream eompensatory mitt don credits for Impacts
associated veldt the Bddpp 11 t project in the WMte Oak River Basin (cantonal upon receipt of Payment
as ouL%W belo 14 Please refer to the table bekrdh► depk t6 the type and quantity of credits requested
and reserwd for your project.
Type Credo Cre ft4 t e0
i Swam 148 to
� xSw wMem wedow
f
Note that the BOMB provides h N o flarhd in 0.1 -acre IKrenwaM Based upon receipto(Wemall and
cenhgeted cwt request form tra wnitted on Augm 15, 2013, BOMB has reserved 148 seam credits and
0,5 rbadan - wetarrd credits. These cred is are reserved until November 15, 2013 (90 days from the date of
this letter,. Please contm us should you rregdre addilonal Ow for the coedit reservation beyond this
date.
Upon Megh" for rteoeipt of aiedil trarhsfer, BOMB WN lfs an bneoice in the amount of 00 ,603. Upon
receipt of payment, BOMB vdl provide an executed Transfer of Oak C,ertilkate. Able that all payments
mum be node with certified fords. It is the appOcwWs reuponsiblity to ensure that the credit types and
ama u it ' nwested are consistent with the compensatory rhhi kdbn requirements of the permhM issued.
BOMB ardor its age n are not responsible for dekvmbhing the appliCCanes mittalon requkements. 0 you
have any questions or need additional informadon, please contact me by phone at (930) 452-0001 or by
emall at *W@lmeroua.rwt.
GRAPHIC SCALE
400 2p 4
1 Wch = 400 fL
WETLAND
IMPACT #3
_WETLAND
IV= VAN" JWAM ma.+ eis a+a� as
mm me BMW OR &AM As aR
AV sow 1M
°oo�Ioo�'I�o�ss��fii
��vQepdo�
off'
v
°° \add
OoOVO oo�
ool��,
o
f oo
i oo' CGGO
i o�P000
l
ool
loo
l o�
l�aovi�;i00000
000_
00000
oi��oo�0000000000��iooa
WETLAND
IMPACT #1 - 1,843 SIF
IMPACT #2 - 995 SIF
IMPACT #2
IMPACT 0 - 7,873 SIF
TOTAL - 10,711 SIF
TOTAL - 0.246 AC
IV= VAN" JWAM ma.+ eis a+a� as
mm me BMW OR &AM As aR
AV sow 1M
11414milml WIN
mm w I mom
'm
MWAM I
, -
0+00 o4m 1+00 .'
SECTION A —A
WETLAND IMPACT 1
GRAPHIC SCALE
40 0 20 40 so
1 Inch = 40 it.
MALDESIGN - NOTRELEASF.D FOR
VlZW BWAM
i8 IM
p0m
- FOR PERBEM 0G ONLY
I lIVA&T #I I
me 8JUXIMUM am
IffAmrom w ism
Rm In
2
As as
Wma
mo
111W
foomm ft
am
AM
41"
Rm In
2
As as
��� �
���� �
���t� �
�1��;�� �
�:�� -- .�
i ar .r(;]j
BONN= OF
aE1LAND
11lPACT
0+00 0+30 1+00 .�
SECTION B -B
WETLAND IMPACT 2
GRAPHIC SCALE
40 0 20 40 00
1 Inch = 40 it.
ow w
NE1L/WD
0VACT
110
ND
fg"L DFMGN - NOr REL W FOR CON31 ucnoN - FOR PmffrnNG ONLY
A rrmirl morof OWN ft WAZ
lWrAW nrPacW >� a ME '-�o'
te
�8tae� I V"
n�aac as
4
wRu
pig CF 18
NE:ILAND -N
WPACT
16
CENTE11M ROAD
B" 20.89
END OF
VAUAND
WACT
14
EXISIM
11m=
12
X10
0+00 0+50 1+00
SECTION C—C
WETLAND IMPACT 3
GRAPHIC SCALE
40 0 20 40 s0
1 inch — 40 ft.