Loading...
HomeMy WebLinkAbout20130948 Ver 1_401 Application_20130913JOHN L. PIERCE & ASSOCIATES, P.A. LAND SURVEYING - LAND PLANNING - MAPPING P.O. BOX 1685 JACKSONVILLE, NC 28541 OFFICE: (910) 346 -9800 FAX: (910) 346 -1210 E -MAIL: beMb@ilpnc.com Or hriani(nlilnne rnm 20130948 Letter of Transmittal — .,,e..... -._ ... TO: Jennifer Burdette NCDENR 401 Wetlands Unit 1650 Mail Service Center. Ralei zh. NC 27699 -1650 DATE: August 29, 2013 ATTENTION: Jennifer Burdellt Re: BndgeWrt Subdivision COPIES DATE NUMBER DESCRIPTION 5 "Pre- Construction Notification PC form " for 401 Certification 1 Check in the amount of $240.00 _.. _ 0 MN—R-- - aMR-0—AL". wal.w REMARKS: 2 ®130948 OF W A TF� \off pG Office Use Only: Corps action ID no. o DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification PC Form A. Applicant Information 1. Processing I e 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number. 29 or General Permit (GP) number. 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No Id. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ® Yes ❑ No For the record only for Corps Permit: ® Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ® Yes ❑ No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: BRIDGEPORT 2b. County: ONSLOW 2c. Nearest municipality / town: SNEADS FERRY 2d. Subdivision name: BRIDGEPORT 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: BEAVER CREEK INVESTERS 3b. Deed Book and Page No. 3359 436 3c. Responsible Party (for LLC if applicable): JOHN PIERCE 3d. Street address: PO BOX 1685 S E P — .3 20113 3e. City, state, zip: JACKSONVILLE, NC, 28540 910 - 346 -9800 yy QUALMY 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ❑ Other, specify: 4b. Names. HAYWOOD PITTMAN 4c. Business name (if applicable): PITTMAN SOIL CONSULTING 4d. Street address: 1003 GREGORY FORK ROAD 4e. City, state, zip: RICHLANDS, NC, 4f. Telephone no.: 910 - 330 -2784 4g. Fax no.: 4h. Email address: PITTMANSOIL @YAHOO.COM 5. Agent/Consultant Information (if applicable) 5a. Name: HAYWOOD PITTMAN 5b. Business name (if applicable): PITTMAN SOIL CONSULTING 5c. Street address: 1003 GREGORY FORK ROAD 5d. City, state, zip: RICHLANDS, NC, 5e. Telephone no.: 910 - 330 -2784 5f. Fax no.: 5g. Email address: PITTMANSOIL @YAHOO.COM Page 2 of 10 PCN Form —Version 1 .3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 766-23 1b. Site coordinates (in decimal degrees): Latitude: 34 31 39.57 Longitude: - 77.27 10.27 (DD.DDDDDD) (- DD.DDDDDD) 1c. Property size: 91.87 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: TURKEY CREEK 2b. Water Quality Classification of nearest receiving water: SA 2c. River basin: WHITE OAK 03030001 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: RECENTLY MOWED TIMBER LAND AND OLD FARM FIELDS 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3500 3d. Explain the purpose of the proposed project: RESIDENTIAL DEVELOPMENT 3e. Describe the overall project in detail, including the type of equipment to be used: CONSTRUCTION OF ROAD CROSSING WITH FILL AND HEAVY EQUIPMENT 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? Comments: [D Yes El No ❑Unknown 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary ED Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): DAVID BAILEY Agency /Consultant Company: PSC Other. 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 2010 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? El Yes ® No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Temporary W1 ®P ❑ T FILL RIPPARIAN NON ® Yes ® Corps 044 RIVERINE ❑ No ® DWQ W2 ®P ❑ T FILL RIPPARIAN ❑ Yes ® No ® Corps ® DWQ 022 W3 ®P ❑ T FILL RIPPARIAN [I Yes ❑ No ❑ Corps ❑ DWQ 018 W4 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P [IT ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts .246 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ® P [--IT CULVERT #2 UT ❑ PER ® INT ® Corps ® DWQ 4 88 S2 ®P ❑ T CULVERT #3 UT ❑ PER ® INT ® Corps ® DWQ 4.5 60 S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T []PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 148 3i. Comments: Page 4 of 10 PCN Form —Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ❑ PEI T 02 ❑P ❑T 03 ❑P [IT 04 ❑P ❑T 4E Total open water impacts 4g. Comments: 5. Pond or (Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5E Total 5g. Comments: 5h. Is a-dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar - Pamlico ❑ Other. Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? B1 ❑P ❑T ❑Yes ❑ No B2 ❑P ❑T ❑Yes ❑ No B3 ❑P ❑T ❑Yes ❑ No 6h. Total buffer impacts 6i. Comments: Page 5 of 10 PCN Forth — Verrsiort 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. ROAD PLACED IN AREA TO AVOID IMPACTS AS MUCH AS POSSIBLE. IMPACT 1 MOVED TO AVOID STREAM CROSSING. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. INSTALLATION OF SILT FENCE AROUND ALL WETLAND AREAS AND PLANTING A GRASS MIXTURE AND COVERING IT WITH STRAW UPSLOPE OF THE WETLANDS TO HELP STABILIZE TO MINIMIZE EROSION. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ® Yes ❑ No 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ® Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: BACHELORS DELIGHT 3b. Credits Purchased (attach receipt and letter) Type RIPPARIAN Quantity 0.5 3c. Comments: STREAM 148 LINEAR FEET 4. Complete if Making a Payment to In4leu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool []cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version S. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes No ❑ Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? >25 % 2b. Does this project require a Stormwater Management Plan? ® Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: COASTAL COUNTY 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narr~ative description of the plan: PLAN WILL PREPARED BY MARK HARGROVE PE ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ® DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state - implemented stormwater management programs apply El HQW El ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No S. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federaUstate/local) funds or the ❑ Yes ® No use of public (federal /state) land? 1 b. If you answered °yes° to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered °yes° to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ❑ Yes ® No 2c. If you answered 'yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. PLURIS Page 9 of 10 PCN Form —Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ® Raleigh ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? usfw web site Natural HERITAGE 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? SOUTH ATLANTIC HABITAT AND ECOSYSTEM IMS 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? STATE HISTORIC PRESERVATION OFFICE WEB -SITE 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? NC FLOODPLAIN MAPPING PROGRAM WEBSITE HAYWOOD PITTMAN 8 -20 -13 ApplicanVAgents Printed Name ApplicanVAgents Signature Date (Agents signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version BA U3M DELIGHT w f nGATlON BANK AUPWI5,2W M. lfay�ttood Plttrnan P.0. Bohr 1387 Oddand4 NC 20574 PI . " VAMN09416W FUM Bachelors OdbM AAitlPOW Bards C/o Land his 200 a - tt Group, b= 3803 WHOWdle Awenus, Sint& 15 is ! 610, � NC 2M a suarht to your rore coedit request, Bachelors Delight Mh%ptbn Bank (BOMB) is provifg canf nwMon of acceptance to supply riparian wedand and stream eompensatory mitt don credits for Impacts associated veldt the Bddpp 11 t project in the WMte Oak River Basin (cantonal upon receipt of Payment as ouL%W belo 14 Please refer to the table bekrdh► depk t6 the type and quantity of credits requested and reserwd for your project. Type Credo Cre ft4 t e0 i Swam 148 to � xSw wMem wedow f Note that the BOMB provides h N o flarhd in 0.1 -acre IKrenwaM Based upon receipto(Wemall and cenhgeted cwt request form tra wnitted on Augm 15, 2013, BOMB has reserved 148 seam credits and 0,5 rbadan - wetarrd credits. These cred is are reserved until November 15, 2013 (90 days from the date of this letter,. Please contm us should you rregdre addilonal Ow for the coedit reservation beyond this date. Upon Megh" for rteoeipt of aiedil trarhsfer, BOMB WN lfs an bneoice in the amount of 00 ,603. Upon receipt of payment, BOMB vdl provide an executed Transfer of Oak C,ertilkate. Able that all payments mum be node with certified fords. It is the appOcwWs reuponsiblity to ensure that the credit types and ama u it ' nwested are consistent with the compensatory rhhi kdbn requirements of the permhM issued. BOMB ardor its age n are not responsible for dekvmbhing the appliCCanes mittalon requkements. 0 you have any questions or need additional informadon, please contact me by phone at (930) 452-0001 or by emall at *W@lmeroua.rwt. GRAPHIC SCALE 400 2p 4 1 Wch = 400 fL WETLAND IMPACT #3 _WETLAND IV= VAN" JWAM ma.+ eis a+a� as mm me BMW OR &AM As aR AV sow 1M °oo�Ioo�'I�o�ss��fii ��vQepdo� off' v °° \add OoOVO oo� ool��, o f oo i oo' CGGO i o�P000 l ool loo l o� l�aovi�;i00000 000_ 00000 oi��oo�0000000000��iooa WETLAND IMPACT #1 - 1,843 SIF IMPACT #2 - 995 SIF IMPACT #2 IMPACT 0 - 7,873 SIF TOTAL - 10,711 SIF TOTAL - 0.246 AC IV= VAN" JWAM ma.+ eis a+a� as mm me BMW OR &AM As aR AV sow 1M 11414milml WIN mm w I mom 'm MWAM I , - 0+00 o4m 1+00 .' SECTION A —A WETLAND IMPACT 1 GRAPHIC SCALE 40 0 20 40 so 1 Inch = 40 it. MALDESIGN - NOTRELEASF.D FOR VlZW BWAM i8 IM p0m - FOR PERBEM 0G ONLY I lIVA&T #I I me 8JUXIMUM am IffAmrom w ism Rm In 2 As as Wma mo 111W foomm ft am AM 41" Rm In 2 As as ��� � ���� � ���t� � �1��;�� � �:�� -- .� i ar .r(;]j BONN= OF aE1LAND 11lPACT 0+00 0+30 1+00 .� SECTION B -B WETLAND IMPACT 2 GRAPHIC SCALE 40 0 20 40 00 1 Inch = 40 it. ow w NE1L/WD 0VACT 110 ND fg"L DFMGN - NOr REL W FOR CON31 ucnoN - FOR PmffrnNG ONLY A rrmirl morof OWN ft WAZ lWrAW nrPacW >� a ME '-�o' te �8tae� I V" n�aac as 4 wRu pig CF 18 NE:ILAND -N WPACT 16 CENTE11M ROAD B" 20.89 END OF VAUAND WACT 14 EXISIM 11m= 12 X10 0+00 0+50 1+00 SECTION C—C WETLAND IMPACT 3 GRAPHIC SCALE 40 0 20 40 s0 1 inch — 40 ft.