HomeMy WebLinkAboutNCC201319_Notice of Termination_20210930Action History (UTC-05:00) Eastern Time (US & Canada)
Subrrit by Anonymous User 9/30/2021 5:15:25 PM (NOT Submittal)
Approve by Morman, Alaina 10/4/2021 9:33:47 PM (NOT Request Review- NCC201319)
• The task was assigned to Morman, Alaina. The due date is: October 5, 2021 5:00 PM
9/30/2021 5:15 PM
1 �
NORTH CAROLINA
Enrlronmenral Quallly
Certificate of
NCC201319
Coverage (COC)
Enter the Certificate of Coverage Nmber
No.*
2020 Annual Fee Status
2021 Annual Fee Status
PAID
Nt3y be blank (if not yet billed).
Information associated
with this permit:
Project Name
Sutton Plant Castle Hayne 230kV Sub 115kV North and South - Reconductor Line
Address
801 Sutton Steam Plant Road, Cape Fear Township, NC
County
New Hanover
Latitude
34.2835
Longitude
-77.9846
Permittee Listed
Duke Energy Progress, LLC
Legally Responsible
Randy Veltri
Individual
NC Reference No.
NCG01-2020-1319
E&SC Plan ID
NEWHA-2018-014
Original NOI
23842
Tracking No.
Date COC Issued
4/3/2020
Prior Rescission
Cate populates only if COCwas already rescinded at time of submittal.
Date
Reason for Rescission/Termination Request:
Reason for
r Project Closed -Out
Termination of
r Sale (Another Owner/Operator obtained a new COC)
Coverage *
r Mistake or Invalid Coverage
r Other
Additional IVbre information about the basis of this request, if needed.
Explanation
Supporting upload Supporting Documentation if applicable.
Documentation Mist beRYforrrat
Project Close-out Information:
Final Close-out 8/24/2021
Inspection Approval
Project Close-out newha-2018-014 20210824.pdf 40.27KB
Approval Must be FDFforrrat
Documentation
North Carolina General Statute 143-215.66 (1) provides that:
Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand
dollars ($10,000).
rJ I, as an authorized representative, hereby request rescission of coverage under
the NPDES Stormwater Permit for the subject facility. I am familiar with the
information contained in this request and to the best of my knowledge and
belief such information is true, complete and accurate.
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B,
Item (6) of that permit.
Signature
Type Name* Nuwan Wijesuriya
Title * Sr Transmission Permitting Manager
Organization* Duke Energy Progress, LLC
Date * 09/30/2021
Email for nuwan.wijesuriya@duke-energy.com
Confirmation *
Contact Telephone* 9199316655
NOT Certification NCG01-eNOT-Certification-Form-20210514-
Form DEMLR-SW.pdf
Mist be FDF Forrrat
Is this COC Already Ensure this CCChas not been rescinded since subrrittal!
Rescinded?
Additional Email CCd on Notification En -ails
(Optional)
Original Permittee CCdonWificationErrails
Email randy.veltri@duke-energy.com
Original Site Contact CCd on Notificaiton Errails
Email Nuwan.Wijesuriya@duke-energy.com
936.8KB