Loading...
HomeMy WebLinkAboutNCC201319_Notice of Termination_20210930Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/30/2021 5:15:25 PM (NOT Submittal) Approve by Morman, Alaina 10/4/2021 9:33:47 PM (NOT Request Review- NCC201319) • The task was assigned to Morman, Alaina. The due date is: October 5, 2021 5:00 PM 9/30/2021 5:15 PM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC201319 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status PAID Nt3y be blank (if not yet billed). Information associated with this permit: Project Name Sutton Plant Castle Hayne 230kV Sub 115kV North and South - Reconductor Line Address 801 Sutton Steam Plant Road, Cape Fear Township, NC County New Hanover Latitude 34.2835 Longitude -77.9846 Permittee Listed Duke Energy Progress, LLC Legally Responsible Randy Veltri Individual NC Reference No. NCG01-2020-1319 E&SC Plan ID NEWHA-2018-014 Original NOI 23842 Tracking No. Date COC Issued 4/3/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Additional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation Mist beRYforrrat Project Close-out Information: Final Close-out 8/24/2021 Inspection Approval Project Close-out newha-2018-014 20210824.pdf 40.27KB Approval Must be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Nuwan Wijesuriya Title * Sr Transmission Permitting Manager Organization* Duke Energy Progress, LLC Date * 09/30/2021 Email for nuwan.wijesuriya@duke-energy.com Confirmation * Contact Telephone* 9199316655 NOT Certification NCG01-eNOT-Certification-Form-20210514- Form DEMLR-SW.pdf Mist be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification En -ails (Optional) Original Permittee CCdonWificationErrails Email randy.veltri@duke-energy.com Original Site Contact CCd on Notificaiton Errails Email Nuwan.Wijesuriya@duke-energy.com 936.8KB