Loading...
HomeMy WebLinkAbout520013_Lagoon Repair Plan Review - 2_20210528ROY COOPER Governor DIONNE DELLI-GATTI Secretary S. DANIEL SMITH Director DC Mills Farms, Inc DC Mills Farm 153 Lee Mills Rd Trenton, NC 28585 Dear DC Mills Farms, Inc: NORTH CAROLINA Environmental Quality May 28, 2021 Subject: Lagoon Repair Plan Review DC Mills Farms Swine Waste Collection, Treatment, Storage and Application System Jones County The Division of Water Resources (Division) has reviewed the repair summary submitted along with the response to the items of concern that the Division provided. The Division still finds that the proposal would not provide adequate protection of surface and ground waters. The earthen liner for this structure has failed twice now — once during initial construction and the current failure. There remain questions as to the integrity of the embankment due to the unknown flow path of the failure under the embankment. A repair plan that only includes repairing/replacing the liner along the embankment wall and twenty feet out into the lagoon bottom does not provide adequate protection for this structure in this location. At a minimum, the breach inlet and outlets must be properly repaired along with the installation of a synthetic liner to protect surface and ground waters. Lagoon replacement also remains an option for this facility. The new lagoon would also need a synthetic liner. Please provide updated repair plans as they become available. Sincerely, Christine B. Lawson Engineer Animal Feeding Operations NORTH CAROUNA Oeparbnenl or Environment.' Opall\ North Carolina Department of Environmental Quality I Division of Water Resources 512 North Salisbury Street 11636 Mail Service Center I Raleigh, North Carolina 27699-1636 919.707.9129