HomeMy WebLinkAbout520013_Email_20210930Strickland, Bev
From: Lawson, Christine
Sent: Thursday, September 30, 2021 4:30 PM
To: Love, Chris
Cc: new.start.life21 @gmail.com; Stilley, Megan; Ravella, Ramesh
Subject: RE: Mills Lagoon Repair Update
Attachments: LagoonRepairPlanResponse3.pdf
Chris and Donnie —
I have been searching for the response that I previously wrote regarding the repair plan for the DC Mills lagoon. As I
could not locate it, I have drafted it again. See attached. Please keep the regional office informed as repairs proceed so
that staff may monitor progress.
Christine B. Lawson
Engineer
Animal Feeding Operations Program
Department of Environmental Quality
919 707 3664 office
984 232 1223 mobile
Christine.Lawson@ncdenr.gov
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
From: Love, Chris <chris.love@ncagr.gov>
Sent: Wednesday, September 22, 2021 10:26 AM
To: Lawson, Christine <Christine.Lawson@ncdenr.gov>
Subject: Mills Lagoon Repair Update
Christine,
Can I get an update on the status of the DC Mills Lagoon repair plan review? Donnie Mills says that you told him over the
phone that the plan has been approved. If that is true please let me know so we can move forward.
Thanks,
Chris Love, PE
Regional Engineer
NCDA&CS - Division of Soil and Water Conservation
Office: 919-707-3794
Cell: 919-449-5669
1
ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH NORTH CAROLINA
Director Environmental Quality
September 27, 2021
DC Mills Farms, Inc
DC Mills Farm
153 Lee Mills Rd
Trenton, NC 28585
Subject: Lagoon Repair Plan Review
DC Mills Farms
Swine Waste Collection, Treatment, Storage
and Application System
AWS520013
Jones County
Dear DC Mills Farms, Inc:
The Division of Water Resources (Division) has reviewed the repair summary submitted by Chris
Love, NC Division of Soil and Water Conservation, on July 14, 2021. The repair plan to utilize a
60 mil HDPE synthetic liner for the full lagoon is acceptable. As noted in the plan, all installation
shall comply with the current NC NRCS Standards 359 (Waste Treatment Lagoon) and 521 (Pond
Sealing or Lining — Geomembrane or Geosynthetic Clay Liner).
The engineer will be required to certify the repair of the hole created by the breach and submit that
certification to the Division's Central Office prior to installation of the liner.
Sludge removal must be done prior to the installation of the synthetic liner to prevent failure of the
liner. Please provide a Sludge Plan of Action (POA) developed and signed by a Certified
Technical Specialist as soon as possible. Approval of the Sludge POA is not required prior to
implementation; however, it must be submitted to the Division prior to implementation.
Engineer's Certification of the completed repairs must be submitted to the Division's Central
Office. Please send to my attention. If you have additional questions, please feel free to contact
me at Christine.Lawson@ncdenr.gov.
Sincerely,
a-gAw Lott. Listi,>AK.,„___
Christine B. Lawson
Engineer
Animal Feeding Operations
NORTH CAROUNA
Oeparbnenl or Environment.' Opall\
North Carolina Department of Environmental Quality I Division of Water Resources
512 North Salisbury Street 11636 Mail Service Center I Raleigh, North Carolina 27699-1636
919.707.9129