Loading...
HomeMy WebLinkAbout20070081 Ver 2_More Info Letter_20070711~QF W ATFhy~ Michael F. Easley, Governor ,~Q; (ter William G. Ross Jr., Secretary t/j ~ rp" North Carolina Department of Environment and Natural Resources ~ --I ~ .~ Coleen H. Sullins, Director Division of Water Quality July 11, 2007 DWQ EXP No. 07-0081v2 Wake County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Robert Polanco 8804 Albright Road Raleigh, NC 27612 Subject Property: Cedar Ridge Subdivision, Rolesville, NC Harris Creek [030402, 27-26, C NSW] REQUEST FOR MORE INFORMATION-EXPRESS REVIEW PROGRAM Dear Mr. Polanco: On July 9, 2007, the Express Review Program of the Division of Water Quality (DWQ) received your application for the above referenced project. The DWQ has determined that your application will require additional information. Please provide the following information so that we may continue to review your project and prevent denial of your application as required by 15A NCAC 2H .0506: 1. DWQ sent a request for additional information on June 4, 2007. Item 1 regarding the issue of the geotechnical subsurface exploration in regard to use of a Con-Span bottomless arch culvert, was not addressed in the July 9, 2007 submittal package. 2. DWQ has concerns regarding cumulative impacts. Please explain the stubbed out roads- Genovesa Drive, Montserrat Drive, and Marbella Drive. 3. You have indicated a total of 2201inear feet of permanent stream impacts and 1601inear feet of temporary stream impacts on the cover letter; a total of 941inear feet of impacts on page 4 of the PCN; 961inear feet of impacts on page 6 of the PCN (for the same impact site); and Sheet 6 of 35 identifies 2501inear feet of permanent stream impacts and 20 feet of temporary stream impacts. The May 15, 2007 submittal package indicated 1491inear feet of stream impacts. Please explain the discrepancies. 4. Your PCN Application indicates a request for a Water Quality Certification and Buffer Authorization for Phase II; the construction plans indicate Phases III-IV. Please clarify the project scope and verify with the USAGE representative. 5. Please include all proposed riparian buffer impacts (whether requiring mitigation or not) within Section X of the PCN. 6. The Zone 2 buffer impacts within the table (depicted on Sheet 6 of 35) does not match with the individual impacts depicted on the construction sheets. 7. You are proposing a total of 13 bioretention facilities in lieu of using level spreaders. a. Please use the bioretention supplement worksheet located at http://h2o. enr.state.nc.us/su/documentsBioretentionAreaSupplement-DRAFT 11- 1.pdf. 401 Oversight 1 Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-689311nternet: http:/Ih2o.enr.state.nc.uslncwetlands Noe Cazolina ~turally An Equal Opportunity/Affirmative Action Employer- 50% Recycled110% Post Consumer Paper Cedar Ridge Subdivision Page 2 of 2 July 11, 2007 b. DWQ requires a minimum of three (3) tree species; three (3) shrub species; and three (3) ground cover species. You have not provided the minimum amount of plant diversity. c. You have specified Myrica cerifera (wax myrtle). This species fixes atmospheric nitrogen and should not be used for nutrient reduction. Please specify a different species. See Chapter 12 Bioretention [http:/lh2o.enr.state.nc.us/su/documents/Ch12- B ioretention_000.pdfJ . d. All plants proposed for your Bioretention facilities must be able to withstand the ponding depth you have indicated. e. You have specified a soil media depth of 2.5 feet. This is shallower than DWQ minimum standards for planting trees and shrubs. £ You have not included soil specifications for the Bioretention facilities in your construction plans. g. Please describe how the planting soil infiltration rate was determined. h. The construction details for the Bioretention facilities do not appear to include an underdrain. Please explain. i. Your construction plans contain inadequate detail regarding the sequencing of the Bioretention construction. Please describe when and how the Bioretention facilities will be constructed. j. Sheet 9A of 35 Landscape Notes. Your project is located in Rolesville, NC. Please ,explain the references to the Town of Cary Standard Appearance Specifications Manual and the Town of Cary site inspectors. k. Maintenance Agreement, page 13 of 14 Item III B includes fertilizing in April and October. This information conflicts with page 5 of 14 item 4. DWQ will not allow ' regular semi-annual fertilizing as the purpose of the Bioretention facilities is to reduce nutrients in a Nutrient Sensitive Water watershed. Please respond within five (5) days of the date of this letter by sending three (3) copies of the above information in writing. The Express Review Program is a process that requires ali parties to participate in a timely manner. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please contact Lia Myott or Cynthia Van Der Wiele at (919) 733- 1786 if you have any questions regarding or would like to set up a meeting to discuss this matter. Sincerely, /,~ /, Cyndi Karoly, Supervisor 401 Oversight/Express Review Permitting Unit CBK/cvdw/lem cc: USACE Raleigh Regulatory Field Office DWQ Raleigh Regional Office File Copy Central Files Jay Keller, Keller Environmental, 7921 Haymarket Lane, Raleigh, NC 27615 Harold Yelle, Aiken and Yelle Assoc., PA, 3755 Benson Drive, Raleigh, NC 27609