HomeMy WebLinkAbout20052167 Ver 5_Pre-Filing Meeting Information_20211004Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:*
Is this a transportation project?*
Deborah Shirley
dshirley@sandec.com
Winston Ridge Development, LLC (Attn: Bobby Sumner)
Winston Ridge -Phase 4
Franklin
Street Address
1265 Flat Rock Church Road
Address Line 2
aty
Louisburg
Postal / Zip axle
27549
C Yes c: No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
F Individual Permit F Modification
F- Shoreline Stabilization
Does this project have an existing project ID#?*
C Yes (: No
State / Province / Pegion
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Stephanie Goss
Please give a brief project description below.*
This project proposes the construction of a single-family residential
development including but not limited to, roadway infrastructure,
utilities, SCMs and residential lots. Currently, there are propose
stream and wetland impacts for a road crossing. The project is
approArnately 73 acres and is located off of NC 96 HWY in
Youngsville, NC. E)asting conditions onsite consists primarily of
forested land along with two (2) intermittent streams and one (1)
wetland feature.
Please give a couple of dates you are available for a meeting.
3/23/2021
3/24/2021
3/25/2021
3/26/2021
3/29/2021
Please attach the documentation you would like to have the meeting about.
C2 - OVERALL SITE PLAN.pdf 1.9MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature *
f ,9� —Q
Submittal Date 3/22/2021