HomeMy WebLinkAbout20211450 Ver 1_Site Plan_20211004 (2)La k
r
(At Full Pond/ Norma( Water Lever
4V \
� a 0 }
r
Side
Y,
.^-r4 16f s1
Lake
(At Full Rend/ Normal Water level]
:Existing Dock
_
S t
30 ftx 7k
jM\
00
w0p,�
�'`
ull Pond/ Normal Water Level
Riprap
3ftx 150 ft
Below full pond/NWL
a k x 1s0 k
2k.x150 k.
Above full pond/ NWL
additional clearing
' H necessary
E'
AMPLE
Plan View
FORM: SSGP 02-2017 Page 2 of 3