Loading...
HomeMy WebLinkAbout20211405 Ver 1_Meeting Request Review_20210920 tie R•.'. DWR Pre-Filing Meeting Request Form NORTH CAROLINA EnWmnnacnlrtl Qua fay ID#* 20211405 Version* 1 Regional Office* Central Office-(919)707-9000 Reviewer List* eads\rjconchilla Pre-Filing Meeting Request submitted 9/20/2021 ......................................................................................................................................................................................................................................................................................................................................................................................................................................................... Contact Name* Jerry Parker Contact Email Address* japarker3@ncdot.gov Project Name* Coble Church Rd Bridge Replacement Project Owner* NCDOT Project County* Guilford Owner Address: Street Address 1584 Yanceyville Street Address Line 2 P.O. Box 14996 City State/Rovince/Region Greensboro NC Fbstal/Zip Code Country 27415 USA Is this a transportation project?* 0• Yes r No Type(s)of approval sought from the DWR: fJ 401 Water Quality Certification- I— 401 Water Quality Certification- Regular Express I— Individual Permit I— Modification I— Shoreline Stabilization Does this project have an existing project ID#?* (' Yes r No Please list all existing project ID's associated with this projects.* WBS Number 17BP.7.R.136 Do you know the name of the staff member you would like to request a meeting with? Ryan Conchilla Please give a brief project description below and include location information.* State project 17BP.7.R.136 involves the replacement of the existing NCDOT Bridge#400267 on SR 3336(Coble Church Road)over Climax Creek. Bridge#400267 consists of 1 @32'-6"reinforced concrete deck girders and abutments; reinforced concrete full height.The proposed bridge consists of 1 @80'33"box beam with 4'-0"caps.The proposed crossing is located in Zone AE of FIRM Map number 3710880000J and was studied by Redelineated Study methods.Two stormwater outfalls are proposed which will be placed at a distance to minimize disturbance to adjacent stream and nearby buffers. Rip Rad pads will be utilized to dissipate the energy. No deck drains are required for the proposed bridge Please attach the documentation you would like to have the meeting about. Coble Church Rd Permit Drawings.pdf 2.46MB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired,and you can submit an application. Signature �� Submittal Date 9/20/2021 Reviewer Meeting Request Decision Is a meeting required or is there more info needed?* r Yes 6* No If rrore infornnation is needed,please add cotrrrents for the enail notification below.