Loading...
HomeMy WebLinkAbout20130941 Ver 1_401 Application_20130813Michael Lovoy, P.E. 20 1 3 0 9 4 1 34 Big Bear Trail Asheville NC 28805 Phone: 828 -545 -5393 mlovoy@aceasheville.com Transmittal Letter To: NC DWO, WBSCP Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 Date: 8 -21 -13 Protect Name: Haw Branch Restoration Pro ect: 1309 Banks Bamardsville Prope cc: David McHenry, US Army Corps of Ennineem Via Mail X Overnight Hand Delivered Pickup @ ACE Office �� ------ Copies - - - -- -------- ate- - - - - -- ---------------------------------------- Description------------------- - - - - -- 5 8 -16 -13 PCN Application Form (executed) 5 6 -15 -13 Agent Authorization Form 5 7 -13 Haw Branch Restoration Project - Banks Property 11 °x17° Design Plans ----------------------------------------- 1 8 -12 -13 $570 Check # 7527 - Application Processing Fee REMARKS: By: Mike Lovoy, P.E. --------------------------- - - - - -- Wig 0. AUG 302013 201 3094 1 o?ot WA TFA o Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification C Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ❑Section f 0 Permit Now 1 b. Specify Nationwide Permit (NWP) number: 13, 39 or General Permit (GP) number. 1c. Has the NWP or GP number been verified by the Corps? ® Yes ❑ No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑ Yes ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Haw Branch Restoration 2b. County: Buncombe 2c. Nearest municipality / town: Bamardsville 2d. Subdivision name: n/a 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Carolyn Banks, Trustee 3b. Deed Book and Page No. 5033/1114 3c. Responsible Parry (for LLC if applicable): 3d. Street address: 717 Dillingham Road 3e. City, state, zip: Bamardsville, NC 28709 Q 3f. Telephone no.: 828 -778 -0187 3g. Fax no.: n/a A 3h. Email address: n/a . rr Page 1 of 11 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The project represents a long -term benefit to the streams by stabilizing eroding banks and reducing fine sediment inputs. Stream impacts will be temporary and minimal. Construction phase best management practices will help minimize the short- term impacts, as described in below. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The will begin only after all materials are stockpiled nearby. Equipment will work from the top of the stream banks and access to the stream bottoms will be limited to designated areas of disturbance. A pump - around flow diversion will be used for work on UT1. The contractor will be required to use only well maintained and functioning equipment and perform daily checks for leaks. An emergency spill plan will also be required. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes ® No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to iMieu fee program ❑ Permittee Responsible Mitigation 3. Complete If Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. if using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 49. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: S. Complete If Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 7 of 11 PCN Form — Version 1.3 December 10, 2008 Version S. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 8 of 11 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan la. Does the project include or is it adjacent to protected riparian buffers identified Q Yes No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑Yes No ❑ Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? n/a % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Project does not constitute development or an increase in impervious area. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certifted local Government Stonnwater Review 3a. In which local government's jurisdiction is this project? n/a ❑ Phase II 3b. Which of the following locally- implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ® No attached? 4. DWQ Stormwater Pro ram Review ❑ Coastal counties 4a. Which of the following state - implemented stormwater management programs apply ❑ HQW ❑ ORW (check all that apply): Q Session Law 200 6-246 ❑ Other. 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ® No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/statellocal) funds or the ❑ Yes ID No use of public (federallstate) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ® No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ® Yes ❑ No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after -the -fact permit application? ® Yes ❑ No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): An NOV was issued by DWQ (2013 -PC -0121) on April 16, 2013 for failure to secure of 401 WQC and removal of best usage. 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage OWposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 10 of 11 PCN Form — Version 1.3 December 10, 2008 Version S. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC One Map website 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NC One Map website 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NC One Map website 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? www.ncfloodmaps.com website Michael D. Lovoy Applicant/Agents Printed Name Ap nt's Signature Date (Agents signature is an authorization letter from the applicant is rovided. Page l l of 11 . PCN Form — Version 1.3 December 10, 2008 Version AGENT AUTHORIZATION FORM PROPERTY LEGAL DESCRIPTION: Deed Book 5033 Deed Page 1114 Parcel ID: 975810 -1213 Street Address: Lf 4`1 11: -, - 1 in A � r� _i�r__e►nrc>,sy.11 L � �, 2�r7c��->t i Please print: Property Owner: Aris rJ -7AA g Property Owner: The undersigned, registered property owners of the above noted property, do hereby authorize Mike Lovov. P.E. of (Contractor/ Agent) Michael D Lovov. P.E. (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owner's Address (ifdifferentthan property above): r T)b11irJ,*L%m RA Telephone: -7 7 %- 0 l YL% We hereby certify the above information submitted in this Form is true and accurate to the best of our knowledge. Authorized Signa re Authorized Signature Date: J u ale. 15, 7-a 3 Date: r- 0 C7 D O =� z .tom ca N '' Z m x —I n O -n A �N „�. R , '' FESS�' ; A cnmZ = m y C O Z = m -3000 s co CONFLUENCE m ti, \ ° oozy t r /< = - RSON COVE RD C) -n Z J i DESCRIPTION DATE APP. � o BARNARDSVILLE, NC Phone: 828.255.5530 Vim' =?p ,,� y 1 I M DAV S' REVISIONS f _ Y \ O O O cn Y/ ^ o z O O K 43s !)93d I '7 HAW BRANCH RD _ 2"r D M Z 3 _ t It cn C. ti .tom ca N '' Z m x —I n O -n A �N „�. R , '' FESS�' ; A cnmZ = m y C O Z = m am Zr- cn D p m HAW BRANCH A �N „�. R , '' FESS�' ; A e C = m STABILIZATION PROJECT CONFLUENCE m BANKS PROPERTY ENGINEERING, PC"�! /< = - C) -n Z 16 Broad Street Asheville, North Carolina 288 0 1 = 22 k - DESCRIPTION DATE APP. � o BARNARDSVILLE, NC Phone: 828.255.5530 Vim' =?p ,,� I M DAV S' REVISIONS ql� i tea.- s i s� i w. 4� y a t , ► Nil � oo•os _ sir fat ` ., A v HAW BRANCH f, �N ..... B m STABILIZATION PROJECT CONFLUENCE'oFESSi'':i C m ENGINEERING, PC �f< BANKS PROPERTY = l t b Broad Street N Asheville, North Carolina 28801 2 - Z (n r = � Phone: 828.255.5530 v, = o BARNARDSVILLE, NC ",2a,cl V;= DESCRIPTION DATE APP. z "' DAV S REVISIONS Ott /--4 y s i s� i w. 4� y a t , ► Nil � oo•os _ sir fat ` ., A v HAW BRANCH f, �N ..... B m STABILIZATION PROJECT CONFLUENCE'oFESSi'':i C m ENGINEERING, PC �f< BANKS PROPERTY = l t b Broad Street N Asheville, North Carolina 28801 2 - Z (n r = � Phone: 828.255.5530 v, = o BARNARDSVILLE, NC ",2a,cl V;= DESCRIPTION DATE APP. z "' DAV S REVISIONS MIN. VAT 10:1 10.5' MIN. VAT 10:1 —13.0' 2.0' 2.5:1 TYP SEE NOTE 1 3.0' 2:1 TERRACE SLOPE, TYP 2.5:1 TYP 3.0' 1 TYPICAL UT1 RIFFLE 2 TYPICAL UT1 POOL 3 1 ° = 10' 3 in= 10' LEGEND EXISTING — PROPOSED —� 10:1 TYP 2.5:1 TYP 3 TYPICAL HAW BRANCH 3 1"= 10' 2:1 TYP a a a Ld a � o Z O_ o V) a LJ U D' N W 0 �8 Lu N o V �N Z W Z N W co ZW ZZ o Oz =�r V W� — u — — V z xo� V a a rTOM WIDTH a O� m�a NOTES: 1. IF DEPTH OF EXISTING CHANNEL IS GREATER THAN 3', BED MAY BE RAISED USING ON -SITE COBBLE AND /OR CLASS 1 STONE. SEE CONSTRUCTED RIFFLE DETAIL. H 2. GRADED BANKS SHALL BE ROUGHENED PERPENDICULAR TO SLOPE, COVERED WITH 3' LAYER OF TOPSOIL, SEEDED, MULCHED AND DATE: JULY 2013 MATTED WITH 780 G /SM COIR FIBER MATTING. SCALE: AS SHOWN 3. TERRACE SLOPES SHALL BE ROUGHENED PERPENDICULAR TO SLOPE, SEEDED AND MULCHED. TYPICAL 4. CREATE SMOOTH TRANSITIONS BETWEEN SECTIONS RIFFLES AND POOLS ON UT TO HAW BRANCH. SHEET 3 OF 5 TOP OF BANK V MIN. MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWN STREAM / DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN T O.C. DIAMOND PATTERN MATTING ANCHORED 1' BELOW STREAM BED SMOOTH SURFACE, REMOVE ALL DEBRIS AND SEED/MULCH BEFORE PLACING MATTING SECTION NOTE: I. MATTING SHALL BE COIR FIBER, 780 GRAMS /SQ. METER WITH NOMINAL 0.50 INCH OPENING SIZE. 1 EROSION CONTROL MATTING �4 NTS PERMANENT SEED MIX ' APPLIED AT 0.5 LB /1,000 SF TO ALL DISTURBED AREAS Common Name Scientific Name Percentage Switchgrass Panicum virgatum 30 Virginia Wild Rye Elymus virginicus 30 Deer Tongue Panicum clandestinum 20 Fox Sedge Carex vulpinoidea 20 TOTAL 100 TEMPORARY SEED MIX (APPLIED WITH PERMANENT MIX) Application Dates Common Name Rate (lb /1,000 sl) August 15 to May 1 Rye Grain 1.0 May 1 to August 15 Browntop Millet 0.3 u LIVE STAKE 2 NODES ABOVE GRADE IN DIAMOND PATTERN HARD SOIL OR STONE MAY BE PRESENT SEE NOTE 1 2' MIN. 2' TO FIRST ROW BASEFLOW W.S. SECTION NOTES: 1. FORM PILOT HOLE THROUGH HARD SOIL OR STONE TO PREVENT DAMAGE TO STAKE. 2. LIVE STAKE MIX TO INCLUDE AT LEAST TWO OF THE FOLLOWING SPECIES: SILKY DOGWOOD, SILKY WILLOW, ELDERBERRY,BUTTONBUSH. 3. LIVE STAKING TO BE DONE DURING THE DORMANT SEASON. 2 LIVE STAKING 4 NTS a a a R CONSTRUCTION 1/2" TO 2" J ' a o cf) Z O_ (n BASE CUT AT 45 DEG.; -� o BUDS POINTED 4 " " " "... 0 �S W No V Lj UPWARD W N J N W N Oz� 0 V W iE r FINISHED GRADE f PER PROFILE Li 0 24 " -30" 1/2" TO 2" J ' BASE CUT AT 45 DEG.; -� LIVE STAKE DETAIL 4 " " " "... 0 �S W No V W zN�u�+ W N J N W Z ? Z ti Oz� 0 V W iE r FINISHED GRADE f PER PROFILE L18" TYP z SECTION A -A' sn AIXTURE OF ON -SITE BOBBLE AND CLASS 1 STONE (5 " -17 ") PLAN r3�� CONSTRUCTED RIFFLE 4 NTS V °xxz w as O 1 u, �a H � DATE: JULY 2013 SCALE: NTS DETAILS SHEET 4 OF 5 ROAD /DRIVEWAY ROAD /DRIVEWAY 1 CONSTRUCTION EXIT 5 NTS STEEL T -POST FILTER FABRIC WITH WIRE BACKING COMPACTED BACKFILL CREEK 8' MAX. — RUNOFF SIDE STEEL T -POST 18" MIN. 8" 24" MIN. a PRELIMINARY Q [PLANS W c o Z NON -WOVEN SILT BAG O 9" MIN. THICKNESS o V) CLASS A STONE _ _ 10' MIN. FROM STREAM a w W U [n 9" MIN. CLASS B o STONE PAD SILT RAG �f m c� GEOTEXTILE AS NEEDED 4" I.li I 1 W W FILTER FABRIC WITH WIRE BACKING SECTION PROFII F NOTES: 1. SILT FENCE SHALL BE PLACED ON STREAM SIDE OF ALL STOCKPILES. 2. SILT FENCE SHALL BE REMOVED UPON COMPLETION OF EARTHWORK. 3 SILT FENCE 5 NTS IMPERVIOUS DIKE; SAND BAG COFFER DAM W/ PLASTIC SHEETING OR APPROVED EQUAL V DEEP SETTLING POOL DIVERSION PUMP 20 GPM CAPACITY FOR UT1 0 DEWATERING PUMP SILT BAG ON STONE PAD, AS NEEDED F SEE DETAIL ABOVE X /I WORK AREA• TOE OF BANK (TYP) TOP OF BANK (TYP) VARIES PROTECT EXIST. BANK VEGETATION ULASJ t% KIVKAV J *NOTE: SPLASH PAD WORK AREA SHALL BE STABILIZED BY THE END OF EACH WORK DAY. r2_' PUMP- AROUND SCHEMATIC 5 NTS W Z W J LL O V 0 N O Q n; oZ — cna aa�o co W N W Q ?mz W IIi a V z zo w o� aa�a H � DATE: JULY 2013 SCALE: NTS DETAILS SHEET 5 OF 5