Loading...
HomeMy WebLinkAboutSW6210905_Plansheet - Misc. Detail_202109272 3 4 5 D C B 0.5% MIN.L 2" #57 STONE SURFACE COURSE 6" COMPACTED AGGREGATE BASE COURSE II I I I I �i COMPACTED SUBGRADE I' HEAVY DUTY GRAVEL SURFACE N.T.S. 1 % MIN. _ NCDOT R/W PAVEMENT N.T.S. NOTE: FINAL PAVEMENT SECTIONS TO BE REVIEWED AND APPROVED BY GEOTECHNICAL ENGINEER OF RECORD PRIOR TO CONSTRUCTION. 3" BITUMINOUS CONCRETE SURFACE COURSE, TYPE S9.5C 4" BITUMINOUS CONCRETE INTERMEDIATE COURSE, TYPE 119.00 10" COMPACTED AGGREGATE BASE COURSE (OF IF <6' WIDE; 5" B25.00) COMPACTED SUBGRADE EX. EDGE OF PAVEMENT w Of > EX. EDGE OF PAVEMENT 20'� 1 �R 20' R z m z _30'-m m m O O In -n I7 I7 G G VARIABLE 6' 8' 5' WIDTH SHOULDER WIDTH 1 /4"/FT OR EX. X-SLOPE -2 08% +8% III=(� I=III= -8.33% 0R ///� /18% 1VFT ?s o 5' SHOULDER SECTION GRADES DRIVEWAY DETAIL N.T.S. SEEDING SCHEDULE BERMUDA LAWN, SLOPES (MAX. 3:1) DATE TYPE PLANTING RATE APR. 15 -JUNE 15 BERMUDA 2 LBS/1000 SF LATE SPRING(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF EARLY SUMMER(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF LATE SUMMER(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF EARLY FALL(1 st 2 YEARS) 16-04-08 SLOW RELEASE FERTILIZER 5-10 LBS/1000 SF MID SUMMER (ESTABLISHED) 16-04-08 SLOW RELEASE FERTILIZER 5 LBS/1000 SF LATE SUMMER (ESTABLISHED) 16-04-08 SLOW RELEASE FERTILIZER 5 LBS/1000 SF SHOULDERS, SIDE DITCHES, SLOPES (3:1 TO 2:1) DATE TYPE PLANTING RATE MAR 1. JUN. 1 SERICEA LESPEDESA 50 LBS/ACRE & MAR 1. - APR. 15 ADD TALL FESCUE 120 LBS/ACRE JUN. 1 -SEP. 1 ***TALL FESCUE AND 120 LBS/ACRE ***BROWNTOP MILLET OR 25 LBS/ACRE SOUGHNUM-SUDAN HYBRID 30 LBS/ACRE SEP. 1 - MAR. 1 ERICEA LESEDESCA AND 70 LBS/ACRE TALL FESCUE 120 LBS/ACRE NOV. 1 - MAR. 1 ADD ABRUZZI RYE. 25 LBS/ACRE o olo o CONSULT EROSION CONTROL ENGINEER OR SOIL CONSERVATION SERVICES FOR OTHER ALTERNATIVES FOR VEGETATION OF DENUDED AREAS. THE ABOVE VEGETATION RATES ARE THOSE WHICH DO WELL UNDER LOCAL CONDITIONS. OTHER SEEDING RATE COMBINATIONS ARE POSSIBLE. ***TEMPORARY - RESEED ACCORDING TO OPTIMUM SEASON FOR DESIRED PERMANENT VEGETATION. DO NOT ALLOW TEMPORARY COVER TO GROWN OVER 12-INCHES IN HEIGHT BEFORE MOWING. OTHERWISE FESCUE MAY BE SHADED OUT. SEEDBED PREPARATION 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL 3 INCHES DEEP OVER ADVERSE SOIL CONDITIONS, IF THEY OCCUR. AFTER ALL ROUGH GRADING IS COMPLETED, TILL SOIL AREAS TO BE SEEDED AND PLANTED TO A DEPTH OF FIVE INCHES. 2. REMOVE ALL LOOSE ROCKS, ROOTS, DIRT CLODS, AND OTHER OBSTRUCTIONS LEAVING GROUND SURFACE SMOOTH AND UNIFORM. 3. TO PREPARE UNIFORM SEEDBED, INCORPORATE AGRICULTURAL LIME FERTILIZER AND SUPERPHOSPHATE INTO SOIL AREAS TO BE VEGETATED. DISK NUTRIENTS INTO SOIL UNTIL WELL PULVERIZED. 4. SEED ON PREPARED SEEDBED AND COVER LIGHTLY WITH SEEDING EQUIPMENT OR CULTIPACK. APPLY TEMPORARY SEEDING TO SOIL STOCKPILE AREAS THAT WILL BE DISTURBED WITHIN 30 DAYS. APPLY PERMANENT SEEDING TO WHERE FINISH GRADES ARE ESTABLISHED. 5. MULCH IMMEDIATELY AFTER SEEDING AND ANCHOR WITH LIQUID ASPHALT AT 400 GAL./ACRE OR EMULSIFIED ASPHALT AT 300 GAL./ACRE. 6. MULCH ALL SEEDED AREAS WITH SMALL GRAIN STRAW AT 90 LBS./l000 SF AND SPREAD UNIFORMLY. GROUND SURFACE SHOULD BE VISIBLE TO ALLOW SUNLIGHT PENETRATION. 7. MULCH AROUND SHRUBBERY AND TREES WITH SHREDDED HARDWOOD TO A DEPTH OF 3 INCHES. 8. AFTER WORK IS COMPLETED AND AREAS ARE STABILIZED, CALL EROSION CONTROL OFFICER FOR SITE INSPECTION AND RECEIVE CERTIFICATE OF COMPLETION. REMOVE ALL TEMPORARY EROSION CONTROL MEASURES, INSTALL RIP -RAP, AND SEED AND MULCH ANY REMAINING BARE AREAS. w �w r,V) U C7 U O z=> z0 OO OU U U U w �w �Q aW aN Qw N 00 Z NOTES: 1. ALL PAVEMENT CUTS SHALL BE REPAIRED WITHIN A MAXIMUM OF SEVEN (7) DAYS FROM THE DATE THE CUT IS MADE. 2. IF CONDITIONS DO NOT PERMIT A PERMANENT REPAIR WITHIN THE GIVEN TIME LIMIT, PERMISSION TO MAKE A TEMPORARY REPAIR MUST BE OBTAINED FROM THE TOWN ENGINEER. � 12'$ BACKFILL 6" MAX. LIFTS COMPACTION: 95% MAX. DRY DENSITY (STD. PROCTOR) L� TRENCH WIDTH MIN: PIPE OUTSIDE DIAMETER + 8" EACH SIDE MAX: PIPE OUTSIDE DIAMETER +12" EACH SIDE TRENCH & PAVEMENT REPAIR SECTIONS STANDARD TYPE (UP TO 20 FEET IN DEPTH) I 5" 0 48" MIN. tL FLAT TOP STANDARDS STEP DETAIL 16" ON CENTER (TYP.) ���� -��� \ I 12" -STANDARD MANHOLE RING & COVER -TOP DESIGNED FOR HS-20 LOADING --PLASTIC CEMENT PUTTY OR BUTYL RUBBER JOINTS JEEP HOLES W/ STONE & WIRE MESH, 2" MIN. DIA. `BRICK & MORTAR INVERT STONE BEDDING s" 0 TRAFFIC AREAS: ECCENTRIC CONE ONLY NON -TRAFFIC AREAS: FLAT TOP ONLY PRECAST MANHOLE JUNCTION BOX RCP CLASS MIN (ft) MAX (ft) III 2 20 IV 1 30 CPP CSP CAP Diamet a MIN (in) MAX (ft) MIN (in) MAX (ft) MIN (in) (ft) 15 28 12 158 2 98 18 12 28 12 1 12 81 21 12 113 12 69 24 12 26 98 12 60 30 12 26 1 79 12 57 36 12 ofO 12 12 47 42 1 20 12 55 12 40 48 12 20 12 48 35 5 12 56 15 31 60 24 20 1 12 50 15 2 MIN: 4" BACKFILL INITIAL LIFT: 12" MAX. NON TRAFFIC AREAS: 12" MAX. LIFTS TRAFFIC AREAS: 6" MAX. LIFTS COMPACTION: 95% MAX. DRY DENSITY (STANDARD PROCTOR) ----GEOTEXTILE FABRIC (NON -WOVEN) WRAP STONE AND PIPE -#57 STONE BACKFILL TO SPRINGLINE NOTES: 1. EXCAVATE TO 4 INCHES BELOW THE PROPOSED PIPE ELEVATION. 2. PROVIDE 4 INCHES STONE BEDDING AND STONE BACKFILL TO SPRINGLINE. 3. WHERE BELL AND SPIGOT PIPE IS USED, PROVIDE RECESSES TO RECEIVE PIPE BELL. 4. UNDERCUT UNSUITABLE MATERIAL AS DIRECTED BY THE ENGINEER AND BACKFILL WITH STONE OR OTHER APPROVED MATERIAL. 5. BACKFILL MATERIAL SHALL BE APPROVED SUITABLE MATERIAL. 6. WHERE NECESSARY, TEMPORARILY DIVERT SURFACE WATER TO MAINTAIN A DRY CONDITION IN THE PIPE FOUNDATION. DIRECT THIS TEMPORARY FLOW INTO SUITABLE EROSION CONTROL DEVICES. STORM DRAIN PPE BEDDING & BACKF LL NG PLAN co z LO M STANDARD 24"X24" GRATE & FRAME 26" X 26" MINIMUM V) I I OPENING w V) W O U CORBEL BRICK 1" PER OURSE FOR 6 COURSES Q ROUT WEEP HOLES W/ STONE & WIRE MESH, 2" MIN. DIA. Li• d,' 3000 PSI CONCRETE STONE BEDDING SECTION NOTE: 1. EITHER SOLID BLOCK, CONCRETE, OR PRECAST CONCRETE MAY BE USED. 2. FOR 24" R.C.P. AND LARGER --USE PIPE DIA PLUS 12" FOR MINIMUM INSIDE DIMENSION. 3. CAST IN PLACE DESIGNS TO BE SUBMITTED. YARD INLET W/ GRATE & FRAME 8 E� #4 BARS "V" 6" @ EQUAL SPACES 1 %2 „ 3 R �' _ W R U CL � � m J v0 w ch �, PLAN OF TOP SLAB 8" E #8 "W" BARS #4 BARS "V" 6" @3 EQUAL SPACES _ r #4 BARS "U" E12 „ SECTION R-R 6" 1 1/2 rr co U) W Q CL (i) Ow m mm v O x w Cl) s Li SECTION S-S T #4 BAR NIT 6" DOWEL r L.ru14 CURB AND GUTTER WITH CATCH BASIN ON STEEP GRADES TOP ELEVATION 6„ EXPANSION JOINT USE ON FLAT GRADES 2% AND UNDER 11-7 EXPANSION JOINT-73'-0' I CO 1 3'- 0 DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON LIGHT GRADES TOP ELEVATION NORMAL GUTTER LINE 6" 8rr EXPANSIONOJOIN USE ON GRADES OVER 2% ? I 10" MAX - 0 EXPANSION JOINT 1 __Q7L ' DEPRESSED GUTTER LINE ELEVATION NORMAL CURB AND GUTTER ON STEEP GRADES MINIMUM DIMENSIONS AND QUANTITIES FOR BRICK CATCH BASIN(BASED ON MIN. HEIGHT, H, WITH NO RISER)* DIMENSIONS OF BOX AND PIPE TOP SLAB DIMENSIONS CU.YDS. CONC. IN BOX BRICK MASONRY DEDUCTIONS ONE PIPE PIPE SPAN WIDTH WIDTH SPAN IMIN. HEIGHT BARS-U NO. LENGTH BARS-V NO. LENGTH BARS-W NO. LENGTH TOTAL LBS. TOP SLAB BOTTOM SLAB TOTAL CONC. BRICKMSNR. IN WALLS TOTAL BRICK AND CONCRETE D A B C G H E F 12" 3'-0" 2'-2" 2'-9" 0.281 0.281 0.883 1.164 0.020 0.042 15" 3'-0" 2'-2" 3'-0" 0.281 0.281 0.963 1.244 0.031 0.047 18" 3'-0" 2'-2" 3'-3" 0.281 0.281L2.1 1.324 0.044 0.065 24" 3'-0" 2'-2" 3'-9" 0.281 0.2811.485 0.078 0.121 30" 3'-0" 2'-2" 3'-4" 4'-3" 1'-2" 4'-4" 4 1'-6" 3 4'-1" 3 4'-1" 45 0.147 0.374 0.5212.217 0.122 0.184 36" 3'-0" 2'-2" 3'-10" 4'-9° 1'-8" 4'-4" 4 2'-0" 4 4'-1" 3 4'-1" 49 0.187 0.415 0.602 2.516 0.176 0.261 42" 3'-0" 2'-2" 4'-5" 5'-3' 1'-5" 3'-6" 4 1'-9" 3 3'-3" 3 3'-3" 38 0.135 0.373 0.5082.660 0.240 0.371 48" 3'-0" 2'-2" 5'-0" 5'-9"2'-0" 3'-6" 4 2'-6" 4 3'-3" 1 3 3'-3" 41 0.173 0.410 0.583 2.998 0.313 0.477 54" 3'-0" 2'-2" 5'-7" 6'-3" 2'-7" 3'-6" 1 4 3'-0" 6 3' 3° 3 1 3' 3" 1 47 0 211 0 448 0.659 2.806 3.465 1 0.396 1 0.595 BACK OF CURB SECTION Y-Y .� �i•�i�i� rl� mm .IN .I. INN INN -Lwim WHFRF 30" TO 36" PIPF IS 11SFD WHERE 42" TO 54" PIPE IS USED DETAIL SHOWING METHOD OF RISER CONSTRUCTION z O L7 I~- Q Q HOC�C� LLJ�I--Iz O O C15 _ cui Z O aCC0CD H Cf) LL 0 _j OOCnCC z H CL H 1 Lu p � p CC O LL C'3 Z H v/ Q w < CO �- 0 CL Z 0 v LO rr h z W N � cc p m Q O cr SHEET 2 OF 2 1840.01 * RISER HAS .321 CUBIC YARDS OF BRICK MASONRY PER FOOT HEIGHT zg" NOTES: MORTAR JOINTS 1/2"2" +/- 1/THICK, p USE CLASS "B" CONCRETE THROUGHOUT. H W } TOP ELEVATION USE FORMS FOR CONSTRUCTION OF THE BOTTOM SLAB. )- Q DEDUCT FOR PIPE(S) FROM TOTAL CU. YDS. OF BRICK MASONRY. Q Q H ' USE #4 BAR DOWELS AT 12" CENTERS FOR ALL PIPE SIZES. H cc PROVIDE ALL CATCH BASINS OVER 3'-6" IN DEPTH WITH STEPS 12" L.L J 2� H Z ON CENTER. USE STEPS WHICH COMPLY WITH STD. DRAWING 840.66. O 0 C7 m: USE TYPE "E", "F" AND "G" GRATES UNLESS OTHERWISE INDICATED. W Q Z LL USE BRICK OR CONCRETE BLOCK WHICH COMPLIES WITH THE REQUIREMENTS I- U O (=rj g" = OF SECTION 840 OF THE STANDARD SPECIFICATIONS. MIN. IF REINFORCED CONCRETE PIPE IS SET IN BOTTOM SLAB OF BOX, ADD TO SLAB N O W AS SHOWN ON STD. NO. 840.00. �- -j O FOR 8'-0" IN HEIGHT OR LESS, USE 8" WALL. OVER 8'-0" IN HEIGHT, USE O C7 Cr 12" WALL TO 6'-0" FROM TOP OF WALL AND 8" WALL FOR THE REMAINING Z H 6'-0". QUANTITES TO BE ADJUSTED ACCORDINGLY. H SEE NOTE CONSTRUCT WITH PIPE CROWNS MATCHING. r W p CHAMFER ALL EXPOSED CORNERS 1". r p DRAWING NOT TO SCALE. TOP ELEVATION STEPS - STD. NO. 840.66 • WIN -'� MIN � -== .IN .IN MIN =IN INN .IN MIN WIN WIN • MIN W� 6"MIN.. T SECTION J-J WHERE 30" TO 36" PIPE IS USED PLAN SEE NOTE 6rMIN. o 4. SECTION M-M 3,r WHERE 42" TO 54" PIPE IS USED PLAN SEE NOTE GRO�)0 GN\I ECTU, A Z CERT. NO. r 353 z n •��Th CARO\\G• NC ENGINEERING LICENSE NO. P-0803 ,\` y\ C A Iq�,,®/® ® + • gip® OF SS/0�® ® SEAL- _ 34981 r I� R \�y\®®�� /l� elf FOR REVIEW ONLY cn U w Ou w Q w Q a_ Q 1 U (n o � a z O J IDOLo0) . a_ L0I- N -00 tN+' (n 0N�0� C � �ll�N000 Lii0 O Q)zrnrn M z w JD w - O (n O O J _ U w� (D X� I 0C) u I- il�0 LLw ■L ■■■ J z W ZD O Z U J z Q O _O ^ 04 Of O U)�Z Q Q2 O Ll..I �_ Z U Q cn z cn Drawn By J HJ BY Checked SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 w co SITE PLAN x a SITE J DETAILS CL Ci Job , Code HCSS1 2 3 4 5 C 0 NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH THE STONE, THEN THE TIRES OF THE VEHICLE MUST BE RAINFALL, INSPECT ANY STRUCTURE USED WASHED BEFORE ENTERING PUBLIC ROAD. TO TRAP SEDIMENT AND CLEAN IT OUT AS 0 SELECT DESIRED HEIGHT: 3. IF A PROJECT CONTINUES TO DEPOSIT MUD AND DEBRIS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED O 84" (SHOWN) MAINTENANCE: CN SPECIFICATION: 1. REMOVE AND DISPOSE OF ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL. ONTO THE PUBLIC ROAD, THE TOWN WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE , WASHED, OR TRACKED ONTO PUBLIC INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT 2• ENSURE THAT THE MIN. CONSTRUCTION CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. ,Y,J4 96" PARTY. ROADWAYS FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWERS AT ANY POINT THAN THE DESIGN ELEVATION PLUS CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS THE SPECIFIED SETTLEMENT. 0 SELECT DESIRED COLOR: AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO 4. 5. PROVIDE SUFFICIENT ROOM AROUND DIVERSION TO PERMIT MACHINE REGRADING AND CLEANOUT. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN [� SATIN BLACK 8' 0" ON CENTER BLEND WITH THE NATURAL GROUND LEVEL AND 30 WORKING DAYS. 0 BLACK FINE TEXTURE PLAN APPROPRIATELY STABILIZE IT. 0 NINETY BRONZE L CN SPECIFICATION: 2' MIN. 2' MIN. 0 BRONZE FINE TEXTURE 1 1/2" W X 1 1/2" H RAILS 0 SPECKLED WALNUT 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER = _ 0 SANDY SHORE OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. COMPACTED - 00 0 WHITE FINE TEXTURE M 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE STEEP CUT OR FILL SLOPE _ _ _ - - -IIIII-III' 0 GLOSS BEIGE ill 1" PLANS, AND SMOOTH IT. PICKETS CD >_ 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE 0 CHOCOLATE z Q OUTLET. 3 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION I 0 GLOSS WHITE 3 3/4" to Q IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. I I I' 2: 1 SLOPE (MAX) 0 BROWN FINE TEXTURE N SPACING IX p 0 SILVER of - IMMEDIATELY STABILIZE OSELECT DESIRED OPTION : 21/2 CROSS SECTION DIVERSION DITCH WITH POSTS TEMPORARY SEEDING OR SHORT PICKETS EROSION ^CONTROL NETTING AS Q`SELECTDESIRED POST CAPS: ENTRANCE TYPE L W STONE SIZE l,/-HLLCu Uu 1 UIN I rir Lr[UJIUIV CONTROL PLANS 021/2"FLAT 0 4" FLAT ; 11/2"WX 1 1/2" H RAILS GENERAL 50' 25' 2-3" UPSLOPE TOE (sTANDARD) I RESIDENTIAL* 25' 12' #57 L nnc-iTivn nonnn I nor AAAV ? n21/2"RFLAT I�121/2"HAII * INDIVIDUAL SINGLE FAMILY rvJ �� N 04"BALL (OPTIONAL) f f SIDE SLOPE Q` FRONT ELEVATION SELECT DESIRED FINIAL OPTION: CROSS SECTION 2:1 (MAX) � 0 QUAD � 0 TRIAD NEW CONSTRUCTION- EXISTING ROADWAY L \ \ \ \ \\ \\MANUFACTURER \ \ \ \ 1NOTES . PLEASECONTACTMANUFACTURERFORALLTHEOTHERSIZESANDOPTIONS. NOTES: _III 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. = 2. DO NOT SCALE DRAWING. 3. THIS DRAWING IS INTENDED FOR USE BY ARCHITECTS, ENGINEERS, CONTRACTORS, CONSULTANTS AND DESIGN PROFESSIONALS STEEP CUT OR FILL SLOPE FOR PLANNING PURPOSES ONLY. THIS DRAWING MAY NOT BE USED FOR CONSTRUCTION. ABRI C UNDER STONE 4. ALL INFORMATION CONTAINED HEREIN WAS CURRENT AT THE TIME OF DEVELOPMENT BUT MUST BE REVIEWED AND APPROVED BY THE PRODUCT MANUFACTURER TO BE CONSIDERED ACCURATE. PLAN VIEW 5. CONTRACTOR'S NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT www.CADdetails.com/info AND ENTER REFERENCE NUMBER HCSS1_Det INDUSTRIAL ALUMINUM FENCE 5000 SERIES CONSTRUCTION ENTRANCE DIVERSION DITCH 5000 SERIES 4- RAIL W/SPEAR POINTS, AVAILABLE W/ALT. SPEAR POINTS (#5141 & #5142) MAINTENANCE: A FLOATING SKIMMER SHOULD BE ATTACHED TO THE BASE OF THE RISER. CN SPECIFICATION: THE ORIFICE IN THE SKIMMER WILL CONTROL THE RATE OF DEWATERING. CN SPECIFICATION: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. THE SKIMMER SHOULD BE SIZED TO DEWATER THE BASIN IN 2-5 DAYS. 1. CONSTRUCT THE BASIN ACCORDING TO THE EROSION AND SEDIMENT CONTROL 2. DRIVE 5-FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE I A CHART TO DETERMINE THE APPROPRIATE SKIMMER AND ORIFICE SIZE IS PLAN WITH THE BASIN SURFACE FREE OF OBSTRUCTIONS, DEBRIS AND POCKETS INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF INCLDUED ON PAGE 6.64.3. SEE PRACTICE 6.64, SKIMMER BASINS FOR OF LOW -DENSITY MATERIAL. 4 FEET APART. DETAILS ON THE INSTALLATION OF SKIMMERS. 2. ASSEMBLE AND INSTALL THE SKIMMER AS INSTRUCTED BY THE MANUFACTURER. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE 3. PLACE A 6-INCH BAND OF SEALANT AROUND THE INTERIOR FACE OF THE OUTLET MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A PVC END CAP SCHEDULE 40 BARREL PIPE. 2-FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS PVC VENT PIPE PVC PIPE VC ELBOW 4. DEPENDING ON THE EXPECTED TIME PERIOD FOR WHICH THE SKIMMER BASIN RECOMMENDED. IS DESIGNED, PERMANENTLY OR TEMPORARILY SEED ALL BARE SIDE SLOPES OF 4. PLACE CLEAN GRAVEL (NC DOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A WATER SURFACE ° THE BASIN. TANDARD METAL POSTS 2' IN GROUND HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. LIMIT THE DAM HEIGHT TO 5 FEET. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE VC END CAP ° 6. INSTALL THE SKIMMER A MINIMUM OF 1 FOOT FROM THE BOTTOM OF THE BASIN. ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. SCHEDULE 4 ORIFICE PLATE 7. THE MINIMUM BASIN WIDTH SHOULD BE 3 TIMES THE DEPTH OF THE BASIN. 6. COMPACT THE AREA PROPERLY AND STABILIZED IT WITH GROUNDCOVER PVC TEE-------" EE PVC PIPE FOR A BASIN DEPTH OF 3 FEET, THE MINIMUM BASIN WIDTH SHOULD BE 9 FEET. TIN PIPE J" HOLES VC TEE 8. INSTALL COIR FIBER MATTING UNDER THE OUTLET OF THE SKIMMER WITH ALVANIZED HARDWARE NDERSIDE MINIMUM DIMENSIONS OF 9 FEET LONG BY 6 FEET WIDE. WIRE EXTENDS TO TOP OF BOX MAINTENANCE: 9. INSTALL MATTING FOR EROSION CONTROL ON EXPOSED SIDE SLOPES AFTER INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1h INCH OR SEEDING IS COMPLETED. GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER 10. UNROLL THE GEOTEXTILE ON THE SPILLWAY IN THE DIRECTION OF FLOW, WITH OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO EDGES BURIED AT LEAST 6 INCHES DEEP. THE GEOTEXTILE SHOULD BE ONE DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE CONTINUOUS PIECE OF MATERIAL OR OVERLAPPED A MINIMUM OF 18 INCHES. - FLEXIBLE HOSE AS NEEDED. PROFILE PROFILE _�3' X 3' X 12" FOR DIVISIONS 1, 2, 3, 4, AND 6 IN THE EASTERN PART OF THE STATE, USE A o `� o o CLASS B LOW PERMEABILITY GEOTEXTILE. ° 4 DISSIPATER PAD 11. REPLACE THE PLASTIC SLOPE DRAIN PIPE AT THE INLET OF THE BASIN WITH ,( 000 0, a $ GEOTEXTILE AS DIRECTED. WT�J 12. INSTALL 3 COIR FIBER BAFFLES IN THE SKIMMER BASIN WITH A SPACING OF 1/ ono THE BASIN LENGTH. R 0 0 13. INSTALL A MINIMUM OF 2 COIR FIBER BAFFLES IN BASINS WITH LESS THAN 20 -� ARM ASSEMBLY / onq o FEET OF LENGTH AT SPACING OF 1 3 THE BASIN LENGTH. fib° no "C" ENCLOSURE 14. INSTALL A CLASS B STONE PAD (4 FEET BY 4 FEET BY 12 INCHES HIGH DIRECTLY OV�o UNDERNEATH THE SKIMMER DEVICE. -�06`�o 15. ANCHOR THE COIR FIBER MAT WITH WOODEN STAKES, STEEL REINFORCEMENT �000a, ODD °°0mCGt0) _ REBAR OR METAL STAPLES. _ •° 16. ANCHOR THE GEOTEXTILE WITH 6" STAPLES AT A MAXIMUM SPACING OF 3 FT. WATER ENTRY UNIT PRIMARY SPILLWAY 17. CONSTRUCT THE PRIMARY SPILLWAY WITH A TRAPEZOIDAL CROSS-SECTION, WITH 2:1 SIDE SLOPES, AND A MINIMUM BASE WIDTH OF 4 FEET. #57 WASHED STONE PLACED TO A HEIGHT OF 12"-18" MIN. ABOVE TOP OF BOX. CATCH BASIN & YARD INLET SKIMMER PROTECTION DETAIL 8' MAX MAINTENANCE: MAINTENANCE: VARIABLE AS DIRECTED BY THE ENGINEER INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. FLOW DIRECTION BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE FILTER OF REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE 57 WASHED VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. STONE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND MIN. 10 GA. N. 12 GA. BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING SILT FENCE FABRIC BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING INTERMEDIATE DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. TO OVERLAP DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. LINE WIRES WIRES CN SPECIFICATION: HARDWARE CLOTH CN SPECIFICATION: 1. THE BASE OF BOTH END POSTS SHOULD BE A LEAST ONE FOOT HIGHER BY 12 INCHES 1. THE BASE OF BOTH END POSTS SHOULD BE A LEAST ONE FOOT HIGHER RADE THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. THAN THE MIDDLE OF THE FENCE. CHECK WITH A LEVEL IF NECESSARY. 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON STEEL FENCE POST 2. INSTALL POSTS 4 FEET APART IN CRITICAL AREAS AND 6 FEET APART ON _= = = = = = = = = = = = = = = - - - - - - - - = _ = STANDARD APPLICATIONS. STANDARD APPLICATIONS. ---]IF-- 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT 3. INSTALL POSTS 2 FEET DEEP ON THE DOWNSTREAM SIDE OF THE SILT FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS WIRE FENCE PLAN VIEW STEEL FENCE POST FENCE, AND AS CLOSE AS POSSIBLE TO THE FABRIC, ENABLING POSTS SILT FENCE FABRIC TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. TO SUPPORT THE FABRIC FROM UPSTREAM WATER PRESSURE. INSTALLED TO SECOND 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. HARDWARE CLOT 4. INSTALL POSTS WITH THE NIPPLES FACING AWAY FROM THE SILT FABRIC. 5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED NOTE5. ATTACH THE FABRIC TO EACH POST WITH THREE TIES, ALL SPACED : WIRE FROM TOP TIIWITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE FILTER OF WITHIN THE TOP 8 INCHES OF THE FABRIC. ATTACH EACH TIE _ = DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE 57 WASHED 1. APPLICABLE FOR DRAINAGE AREAS NO MORE THAN 1/4 ACRE. DIAGONALLY 45 DEGREES THROUGH THE FABRIC, WITH EACH PUNCTURE EH _ - AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE 2. USE AS A REPAIR OF SILT FENCE FAILURES. AT LEAST 1 INCH VERTICALLY APART. ALSO, EACH TIE SHOULD BE FRONT VIEW - - POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT STON 00 POSITIONED TO HANG ON A POST NIPPLE WHEN TIGHTENED TO PREVENT SAGGING. FLOW DIRECTION 3. BURY WIRE FENCE, HARDWARE CLOTH, AND SILT FENCE FABRIC 8 SAGGING. ROPERTY LINE 6 WRAP AND SECURAPPROXIMATELY TIES. INCHES OF FABRIC AROUND THE END POSTS INCHES DEEP AND 4" WIDE MIN. 6 WRAP SECUREAPPROXIMATELY WTH 3 TIES. INCHES OF FABRIC AROUND THE END POSTS NOTES: OST 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE eil=iu=ui=iu=iu=Li=ui-iieLl T= 7. NO MORE THAN 24 INCHES OF A 36 INCH FABRIC IS ALLOWED ABOVE GROUND LEVEL.WOVEN STEEL PWIRE FABRIC - F §F: HYDRANT 8 THE INSTALLATION B FORE COMPACE CHECKED AND CORRECTED FOR ANY -I !I c7= 100 IT HARDWARE CLOT STEEL FENCE POST WIRE FENCE GROUND LEVEL. 1. USE SILT FENCE ONLY WHEN SILT FENCE GEOTEXTILE FABRIC F� E 2' MAX. 8. THE INSTALLATION SHOULD BE CHECKED AND CORRECTED FOR ANY 1 "OVER 1 "OVER DEVIATIONS BEFORE COMPACTION.L DRAINAGE AREA DOES NOT Ln 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT 14"IIlII� I~ ~I 9. COMPACTION IS VITALLY IMPORTANT FOR EFFECTIVE RESULTS. COMPACT 1 32 MIN. WIDTH I';:' THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT SIDE VIEW mint I THE SOIL IMMEDIATELY NEXT TO THE SILT FENCE FABRIC WITH THE FRONT EXCEED 4 ACRE AND NEVER ILL SLOPE ;'� WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 LJ WHEEL OF THE TRACTOR, SKID STEER, OR ROLLER EXERTING AT LEAST 60 IN AREAS OF CONCENTRATED POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND POUNDS PER SQUARE INCH. COMPACT THE UPSTREAM SIDE FIRST, AND W THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. THEN EACH SIDE TWICE FOR A TOTAL OF 4 TRIPS. FLOW. _ SILT :� jj 2. END OF SILT FENCE NEEDS N {_ 4 TO BE TURNED UPHILL. FENCE ----CURB AND SILT FENCE FABRIC i GUTTER RADE SIDEWALK A QRADF c.. i .. �i�c c.. i ♦•III -III= N = Ali-lil-lllHMH-lil - tr�1 - 8 MIN. COVER X 4 MIN. - - - - * 'I� II I -III -III -III -III ♦ i r i =III - USE 57 WASHED STONE FOR _ - - - - - ---- ii -rlll-� WIDTH OVER SKIRT iii===-_-_-_-_ _-_-----------_-- -_-__ REPAIR OF SILT FENCE _' i-lil-lil-lil-lil-i [=lil-lil-lil-lil-lil-lil-lil I I il-lil-lil-lilt C=lil-lil-lil-lil-lil-lil-lil-lil-lil-lil-7 flil-lil-lil-lil FAILURES, AND FOR ANCHOR (BACKFILL TRENCH AND flili I I _ =- !Ii� Flili= ii�•kili i- LI LI LI LI WHEN SILT FENCE IS COMPACT THOROUGHLY) u u u u SIDE VIEW FH INSTALLATION PROTECTING CATCH BASIN. FRONT VIEW TEMPORARY SILT FENCE TEMPORARY SILT FENCE OUTLET Kr,GRO�,*uRy� coo 3 w Z CERT. NO. r 353 z n •,4C)�TH CARO\" N• EI H, G NC ENGINEERING LICENSE NO. P-0803 ,®` y\ C A Iq�,,®®i ® + • gip® OF SS/0® ® SEAM • 34981 ®�//j; UEI� R FOR REVIEW ONLY 0 to U w z u Q w Q U (n z Q (n w w z Q 41 O 0 J I Do Lo Cr -0OtN+ D 0I-1LO0) N �Q�NnV)-C O 0o Do 41 0) G) �zrnrn W W-o �O- -C LAJ I� O4-- p I- il� O LL LAJ J z W 0 z CU J z Q 0 O ^ L1� cv Of O < U) Z Q Q2 O LLI F_ Z U Q 0 Z (n Drawn By JHJ BY Checked SRN DATE: 30 JUN 2021 REVISED: 1L16 SEP 2021 0 w SITE PLAN N SITE DETAILS J d Job 0 Code HCSS1 Dwg No. N SITE D L 601 a 0 0 2 3 4 5 D C ln,;pect skimmer iedirnant ba;ns it least %yeeklly mid after conch r�ugriuficanl (one,liaff ithch �ff gre�trelt) ninfaiii event wid epa6r Remove sedurvient mlid re%tore the ha%wo to its ortgnial dinitilmow; when sedinient ,ioclininilate" to 1")Iiedmllftime lamaighrt of the firm biffle, 1111di the s,ku-nrrier to orie sode qo flyat the sedinient nnidenneafli it Qirt he excavated. Excavate the Se,dinient fr�oin the en6re Inwin, ruotjast around the shirvirrier or rive ic ficefl. klake sure Vegetation growing in the bottomoftlie bwundfwF, n0t holddown die qlkuylnlel:. Rel the baffle"; if they are daniaged. Re-atichc)r the baffies it" %w,aLvr ts illowng linderreath (m Aaround thenn- If the rnc -ris di,-) ged with ttash aad there, us water in the bmn a, wirialfly t ni 9, �erking on dre rcilic wiN rnake the ski d b-, I od�; .innumer bob up slid down wic die debris, and reswre flow, ff this doe,, not work, puH die skins rrarer ,over to 6e iide id he end remove ill delitis. Ahcwchieck the, orifice iriside the skirnihiert rosee ifit iscklg,led, lfscw reniove the dl If theskininier in-n r,r hirret ffe uwi c4r,gged, theothfice can he reninved ind Re Sure, and repkicetheordice before repositioningthesictntinle.r. (Aleck the fabric lined spHliwity for danhagw and niake any requited repair-, Check dl bank tirietm spirllllways, aild outlet for .redo n daniage, wd ulspect dw enillankillent f6l lipl,ng, arld wettknient. Nlakealji rmcetvis.s y rep.mirs linmedtar6y. Remove M 11 trash ondodierdehiii firnm the Fkimtner wid pooll "rea, 5,. Freei"ing we"A[wr can result ill lice fornling, irt thic hasin. S"011ie, SINCiah precautions should be taken Gn the winter ro prevent the skillimer from pi rigg fling Wi til Ice. liilll ;; � �Illl�00091 ,��1llr »III11100 NORTH AMERICAN GREEN® 12" CRITICAL POINTS DESIGN INFORMATION TO BE PROVIDED BY THE ENGINEER ON THE CONSTRUCTION DRAWINGS DIMENSIONS ELEV EMERGENCY SPILLWAY 20 267.75 TOP OF DAM WIDTH 10' 269.0 ANTI SEEP COLLAR 54"X54"X12" N A RIP RAP DISSIPATOR PAD 12'x4.5'x18"D N/A TOP OF RISER 4 W 4 SIDES) 266.0 OUTLET PIPE INVERT IN 4" PVC 360.0 OUTLET PIPE INVERT OUT 15" RCP 360.0 ANTI -FLOATATION DEVICE 54"X54A 8 SKIMMER SIZE 2.5" ORIFICE SIZE .1.9" CONSTRUCTION SPECIFICATION: 1. (1car,, gruh,arid strup die, arca wider hlie eniKank-niciltofalli vcptafton and root mat. kernove all sLjrface soul LnUtMiENill,; hu h a mcurutr. oforganic ranatcer i1,310 ail nIljWVnruih1,P rwimpnni in die, designated dirqpaiatl area. 11ace temporary wtdinient crinirol] tneasurei bellow ba.sin w needed 2. Fnaare that filli Tylatovall for tthe enillanknwnt o� five of remits Vegetation, org'allic matter, and other obecooiabllE rriaieriall. illi2ce, 11w, fl ft in PLAN VIEW lifts that inexceed 9inches, and machineconipact it. Overnlilitheethilmnkment 6 41clue5 to alllow, feat sculelnetil. EMERGENCY SPILLWAY CONSTRUCTED OVER .4, Shapethe basin tc) the s1l diniensioni. Vrnent die skinuning. difvicc UNDISTURBED GROUND AND ARMORED WITH ftorn ierdhng tnto the rnud hy exeavalmg a -diallow Imt under the sll RIP RAP AND FILTER FABRIC provAing a llow -uppnrt undierthe skininierofstoneor timber. 4. Place the Il itypkaHy4minch 'khadulle 44) fbiNnfLifinni of �rnpeit1routi, ,nill I)n not uN,,e pervinu; marermt inch ins wand, gravc1, or cnished stfaic as Imck -fiH around the pVjle. Place the hH nutc6atl uh.rLurid the, ptpc sj,�iflw�w In 4-trich I�Wcrh and coniliact �1 Under Ind around t. IF, RAP IP RA die pilee toat �east�he --=nedens,ity 3"rthe *jacent eraliarill Cai u: ne, m sit ISS DISSIPATOR IP he Tall H,X r5 ilki, time pipe fi-nm the hnn enrntirt with its fbinldarinut Uliert AD PAD C10rupactnif" 111i'de'r the puriv haunclie", 4DA Pbce feetofconipacted back-fil Over dhe piriespHl1way aniinu�nwhiderAhof' 3' X 3' X 12"- befortetwsing it with construction Nii�pmcnt. Ili im) crisz qIv.xAd dic pire CLASS B craiduit be iiistahed by catfing a trench throughthe dain after theendlankmint DISSIPATER PAD k k eofnp�ete. 5. Asqenibie rite skurnirnier 6oll1lowng The manufituturer-, ljjn;�uucumn i, nn i q designed. fie,Lay the mhernblod skunimer oil the bottona oftlie, bas�n wkh the flexible SLOPE DRAIN (TYP.2 U TL T P UTLET PIPE "��EARTH of atthe inter of barrel I� e. P tIle excavated pit or mqiporz. fie sure to alLach POROUS BAFFLES (3 MIN. M bi DAM ILLJ a rope un The qkunirnermid anchor It to the �,Ide nf the wsan afSKIMMER to pritil the skininitr to the slide for m,mrilenance. STOR WATER LEVEL DURING CONCRETE RISER L� 7. Lar6erh spiHways- Instaii the spfliwihy ln Un&srhrbe,d wl�I to the greatest POROUS BAFFLES 3 MIN. z eX62ftt 'WrFAhi'p,, 1 fie achievenlent".evade" deF�Ugli W�,dda ", ,ri are cridca� to the �rfpf�T o SLOPE DRAI c of the ipfll)way. I'he %piflwny Mmulld lie lined Arudh lIanninated pbsd or ISKIMMER MERGENCY SPILLWAY ELEV. nilperl"lle all te, fablic. 1 hL, fabric must be wi& and long enough to coverthelbottorn wid theiapofthe daniforanchojin g INIMUM FORESLOPE 21:1 2 in a trench.1 lie tdges may be sectired with 8, mch �tarfles or piw. 1 lie, fabric niust be bong erxyujgh ro, extend down -IoPe the and Exhnnio ;tabu proimd. INIMUM BACKSLOPE 3:1 The Wnillth of flue fail n1wu lie one plece, nryt joiried or qike,adotherwise 3' X 3' X 12 Nw ater can p;ti Lundet the fabric.ff the iell&,Df the fablic rawlanufficlixitE fix tile, ARTH DAM eii6-c Meru of the spAiway, niliftirik, �,e efions, qimihiing thet,oniplfert width, . CLASS B Ilia y be u sed. I tie, uplvr sectPont,0 skalld aveflap the- liower secdprr(s) s,o DISSIPATER PAD GATE VALVE OR ORIFICECP DISCHARGE PIPE that Nvmer cannot flow kinder the fabnc. Secure die upp,er edge and lidel ANTI -FLOATATION BLOCK nf i1he lfmhrwe in a Trench wnh qmplle; ar pijjj,, 4AdiptNi frnni , A kiannqu fhr NOTES: UTLET Destlgriirq, friftalifing and Nlainannmng Skimmer Sed imEntflw4ths.fell 1) 1 SEDIMENT STORAGE: 3,600 CF/DISTURBED ACRE ANTI -SEEP COLLAR PROTECTION 199h&_, J, %V, FwrCllntsonj 2. SURFACE AREA BASED ON: Q25 CROSS SECTION (DETAIL 40018) Use 3. INSTALL SEDIMENT CLEANOUT ELEVATION STAKES. . l3dPR W3LO 11) Elle Uppei end oftht pvol],m en i,n limprove lxgssri uap effineiwy 4. BAFFLES SHALL INCLUDE 700 G/SM COIR EROSION BLANKET. 5 FLOW ENTERING THE BASIN MUST BE DIRECTED TO AVOID EROSION ALONG THE SLOPE AND SCOUR IN THE BASIN. APPROPRIATELY SIZED SLOPE DRAINS, PER THE STANDARD DETAIL, ARE RECOMMENDED. NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com A M, UVCfC LMOMNUOCMIVIO B B PROJECTED WATERLINE C. CHANNEL BOTTOM/SIDE C SLOPE VERTICES HORIZONTAL STAPLE SPACING SHOULD BE ALTERED A IF NECESSARY TO ALLOW STAPLES TO SECURE THE B CRITICAL POINTS ALONG THE CHANNEL SURFACE. C IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS. NOTES 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. REFER TO 140-OOIB FOR ADDITIONAL NOTES. 4. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wwvv.CADdetails.com/info REFERENCE NUMBER 140-001A. ROLLED EROSION CONTROL PRODUCT CHANNEL INSTALLATION 140-OOIA PROTECTED BY COPYRIGHT @2013 CADDETAILS.COM LTD. RISER BARREL SEDIMENT BASIN Tensar. NORTH AMERICAN GREEN® NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED, DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH THE PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE BLANKET IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITH APPROXIMATELY 12"(30CM) OF BLANKET EXTENDED BEYOND THE UP -SLOPE PORTION OF THE TRENCH. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN THE BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12"(30CM) PORTION OF BLANKET OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12"(30CM) APART ACROSS THE WIDTH OF THE BLANKET. 3. ROLL CENTER BLANKET IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM , STAPLES/STAKES SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. 4. PLACE CONSECUTIVE BLANKETS END OVER END (SHINGLE STYLE) WITH A 4"-6"(10CM-15CM) OVERLAP. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM) APART AND 4"(10") ON CENTER TO SECURE BLANKETS. 5. FULL LENGTH EDGE OF BLANKETS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN 6"(15CM)DEEP X 6"(15CM)WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. 6. ADJACENT BLANKETS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5CM-12.5CM) (DEPENDING ON BLANKET TYPE)AND STAPLED.TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE OVERLAPPING BLANKET(BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON THE BLANKET BEING OVERLAPPED. 7. IN HIGH FLOW CHANNEL APPLICATIONS, A STAPLE CHECK SLOT IS RECOMMENDED AT 30'TO 40'(9M-12M) INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM)APART AND 4"(10CM) ON CENTER OVER ENTIRE WIDTH OF CHANNEL. 8. THE TERMINAL END OF THE BLANKETS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM)DEEP X6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. MAINTENANCE 1. Visually inspect erosion control matting after every rain event. 2. Replace any damaged matting with new. 3. Regrade damaged diversion ditches and replace matting as necessary. NOTES 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wwvv.CADdetails.com/info REFERENCE NUMBER 140-001 B. ROLLED EROSION CONTROL PRODUCT CHANNEL INSTALLATION 1140-001 B CADdetails.com PROTECTED BY COPYRIGHT @2013 CADDETAILS.COM LTD. 9, Ert6kni cAmtrol- 4_*i1V3tTUCt the structur- sci drat the thshurbed area is mmirnizmi ll.Xveri. stff-race WaufT away frorn liar e art�ts. GoIrriltit [fit trribdrikiTtent beftwe I]-& 2rtu is cl,eared. ' Libil,L,,t the emergency spil.IwLk,, ffnhankmeml mid all mher &,,1-urhird armx ahmin the ci-inkt of Ilie, princijval sp�ttwuy c4mstn.ictian 1W huolill TwlnllvNifil"es as ;Twcified in Pr1i'mice f; FA, )orunu, It, Aftrrallthe areas hawe been periltunenfly slabflizt4� mloove die structue mul all lul umoubla NNETF11211t. the: fLr2a RA Hand "idi die adjinrinig Aunas and subtiric properly tktfertfiw-cs: surOe Tensar. NORTH AMERICAN GREEN® *2"-5" *2"-5" (5CM-12.5CM) ]I_0 _11 (5CM-12.5CM) (5CM-12.5CM) -� -SEAM STITCH 3.3 0 1.6' (1.0m) I (0.5M) - e 31' 11 (1.0m) 1 0 0 1 1.15 STAPLES PER SQ. YD. (1.35 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES THROUGH EACH OF THE RED COLORED DOTS *2"-5" *2"-5" (5CM-12.5CM) (5CM-12.5CM) -SEAM STITCH 0 0 0 20" 0 0 0 (0.5M) -- to PLAN Lij LLJ :2 LLJ 17, VIEW LLJ < n 0 PIPE ILTER L FABRIC SECTION 'A -A' NOTES: PIPE OUTLET TO WELL-DEFINED CHANNEL PLAN VIEW 1. L = THE LENGTH OF THE RIPRAP APRON 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 12 INCHES 3. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 4. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO 6 INCHES ABOVE THE MAXIMUM TAILWATER DEPTH OR THE TOP OF THE BANK, WHICHEVER IS LESS. NORTH AMERICAN GREEN 5401 ST. WENDEL-CYNTHIANA ROAD POSEYVILLE, IN 47633 TOLL FREE: 1-800-522-5011 PHONE: (812) 867-6632 FAX: (812) 867-0247 www.nagreen.com (5CM-12.5CM) SEAM STITCH 3.3 (1.0N 0.7 STAPLES PER SQ. YD (0.8 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES THROUGH EACH OF THE BLUE COLORED DOTS. *2"-5" *2"-5" --i 1 (5CM-12.5CM) (5CM-12.5CM) 1.6'(0.5M) SEAM STITCH 6 0 o 1 0 0 0 3.3 (1.0m) 1.7 STAPLES PER SQ. YD. (2.0 STAPLES PER SQ. M) 3.4 STAPLES PER SQ. YD. FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN (4.1 STAPLES PER SQ. M) GREEN DOT SYSTEM PLACE STAPLES/STAKES FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM' PLACE STAPLES/STAKES THROUGH EACH OF THE GREEN COLORED DOTS THROUGH EACH OF THE WHITE COLORED DOTS *2"-5" *2"-5" (5CM-12.5CM) (D-1 (5CM-12.5CM) SEAM STITCH STAPLE PATTERN GUIDE 101,• 9 0 9 (0.25M) *LOCATION OF SEAM STITCH WILL VARY DEPENDING 0 0 0 3.3'(1.0M) - ON NORTH AMERICAN GREEN PRODUCT TYPE 0 9• 20" (0.5M) 3.75 STAPLES PER SQ. YD. (4.5 STAPLES PER SQ. M) FOR BLANKETS WITH THE OPTIONAL NORTH AMERICAN GREEN DOT SYSTEM PLACE STAPLES/STAKES NOTES THROUGH EACH OF THE YELLOW COLORED DOTS 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTORS NOTE FOR PRODUCT AND PURCHASING INFORMATION VISIT wwvv.CADdetails.com/info REFERENCE NUMBER 140-004. ROLLED EROSION CONTROL PRODUCT STAPLE PATTERN GUIDE 1140-004 CADdetails.com PROTECTED BY COPYRIGHT @2013 CADDETAILS.COM LTD. PIPE OUTLET MAINTENANCE: 1. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE INSPECTED BY THE RESIDENT ENGINEER DURING HIS/HER WEEKLY EROSION AND SEDIMENT CONTROL INSPECTION, AFTER A STORM EVENT OF 1/2" OR GREATER AND AT THE END OF ANY DAY WHEN CONCRETE HAS BEEN POURED ON THE CONSTRUCTION SITE. THE INSPECTOR IS TO ENSURE THAT THERE ARE NO LEAKS, NO SPILLS AND THAT THE FACILITIES CAPACITY HAS NOT YET BEEN COMPROMISED. 2. ANY OVERFLOWING OF THE WASHOUT FACILITIES ONTO THE GROUND MUST BE CLEANED UP AND REMOVED WITHIN 24 HOURS OF DISCOVERY. 3. IF A RAIN OR SNOW EVENT IS FORECASTED, A NON -COLLAPSING, NON -WATER COLLECTING COVER SHALL BE PLACED OVER THE WASHOUT FACILITY AND SECURED TO PREVENT ACCUMULATION AND OVERFLOW OF PRECIPITATION. 4. CONTENTS OF EACH CONCRETE WASHOUT FACILITY ARE NOT TO EXCEED 75% OF ITS DESIGNED CAPACITY. IF THE CONTENTS REACH 75% CAPACITY, DISCONTINUE POURING CONCRETE INTO THE FACILITY UNTIL IT HAS BEEN CLEANED OUT. 5. ALLOW SLURRY TO EVAPORATE OR REMOVE FROM THE SITE IN A SAFE MANNER (IE. VACUUM TRUCK). ALL HARDENED MATERIAL CAN THEN BE REMOVED AND DISPOSED OF PROPERLY. 6. IF A LINED BASIN IS USED, IMMEDIATELY REPLACE THE LINER IF IT BECOMES DAMAGED. 7. REMOVE TEMPORARY CONCRETE WASHOUT FACILITIES WHEN THEY ARE NO LONGER NEEDED AND RESTORE THE DISTURBED AREAS TO THEIR ORIGINAL CONDITION. 8. NOT THE LOCATIONS OF TEMPORARY CONCRETE WASHOUT FACILITIES AND CHANGES TO THESE FACILITIES ON THE SWPPP. CN SPECIFICATION: 1. THE CONTRACTOR MUST SUBMIT A PLAN OF HIS/HER PROPOSED TEMPORARY CONCRETE WASHOUT FACILITY TO THE RESIDENT ENGINEER FOR HIS/HER APPROVAL AT LEAST 10 DAYS PRIOR TO THE FIRST CONCRETE POUR. 2. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE IN PLACE BEFORE ANY DELIVERY OF CONCRETE TO THE CONSTRUCTION SITE. 3. TEMPORARY CONCRETE WASHOUT FACILITIES ARE TO BE LOCATED AT LEAST 50 FEET FROM STORM DRAIN INLETS, OPEN DRAINAGE FACILITIES, OR WATER BODIES. EACH FACILITY IS TO BE LOCATED AWAY FROM CONSTRUCTION TRAFFIC OR ACCESS AREAS TO PREVENT DISTURBANCE OR TRACKING. 4. A SIGN IS TO BE INSTALLED ADJACENT TO EACH TEMPORARY CONCRETE WASHOUT FACILITY TO INFORM CONCRETE EQUIPMENT OPERATORS OF THE DESIGNATED WASHOUT FACILITY. -15' MIN- .10 + + + - - A ' O ENTRY SIDE OF --- WASHOUT ABOVE GRADE DETAIL PLAN VIEW 3' TYP EDGE OF 10 MIL PLASTIC LINER EARTHE BERM STRAW BALES 2 HIGH MAX) WOOD OR METAL _STAKES (2 PER A BALE) I WEDGE 2" -1, LOOSE -16 GAUGE STRAW STEEL BETWEEN 00 WIRE BALES STAPLE DETAIL -15' MIN - B 3' 1:1 3: � ENTRY SIDE OF__ WASHOUT %PLES 10 MIL PER BAL PLASTIC LINER -F- F I - - - L __J_ _I_ SECTION A -A GENERAL NOTES: 1. DO NOT DISCHARGE CONCRETE OR CEMENT SLURRY FROM THE SITE. 2. THE CONCRETE WASHOUT FACILITY SHOULD BE LOCATED A MINIMUM OF 50' FROM STORM DRAIN INLETS, BUFFERS, OR WATERCOURSES. 3. THE CONCRETE WASHOUT SIGN SHALL BE INSTALLED WITHIN 30' OF THE FACILITY. 4. THE ACTUAL LAYOUT CAN BE DETERMINED IN THE FIELD USING EITHER THE ABOVE GRADE OR BELOW GRADE CONSTRUCTION OPTION. 10 MIL PLASTIC LINER UNDER BERM AT ENTRY B 3' MIN EARTHEN,, 3'BERM 1 -- ----------- BELOW GRADE DETAIL PLAN VIEW to MAINTENANCE: INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACES, OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. CN SPECIFICATION: 1. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENISTY OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2. THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5. THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6. RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD, ANGULAR, HIGHLY WEATHER -RESISTANT AND WELL GRADED. 7. CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFILL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OF SLIGHTLY BELOW IT. 8. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STREAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEED TO FIT SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON. 9. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. -PLYWOOD CONCRETE +1 4P-O" X 2'-O" PAINTED WHITE WAS OUT I III LACK LETTERS + L 6" HEIGHT \--LAG SCREWS(l /2") WOOD POST (3)/2"x3)/2"x8'-0") II II 0 II 20 II 1 I i i _P0 Li to to SIGN DETAIL 5. THE CONCRETE WASHOUT FACILITY SHOULD BE CONSTRUCTED AND MAINTAINED IN SUFFICIENT SIZE AND QUANTITY TO CONTAIN ALL LIQUID AND CONCRETE WASTE GENERATED BY THE WASHOUT OPERATION. 6. THE PERIMETER OF THE 10 MIL LINER MUST BE HELD IN PLACE WITH SAND BAGS OR STEEL STAPLES. 7. ONCE CONCRETE WASTES ARE WASHED AND ALLOWED TO HARDEN THE CONCRETE SHOULD BE BROKEN UP, REMOVED AND DISPOSED OF AT AN APPROVED FACILITY IN ACCORDANCE WITH LOCAL AND STATE REGULATIONS. DISPOSE OF HARDENED CONCRETE ONCE THE WASHOUT FACILITY IS 75% FULL. 8. ONCE THE FACILITY IS NO LONGER NEEDED ALL MATERIALS SHALL BE REMOVED AND THE EXISTING GRADES SHALL BE RESTORED. 9. STORMWATER ACCUMULATED WITHIN THE WASHOUT MAY NOT BE DISCHARGED INTO THE STORM DRAIN SYSTEM OR RECEIVING SURFACE WATERS. TEMPORARY CONCRETE WASHOUT e-,O` G R 0 lJA \JECT :L z CERT. NO. 353 �b�PH CARO' 0. IGH, - F NC ENGINEERING LICENSE NO. P-0!8:03] `\\\\ I I I 0 y\ CAr. RO SsId P SEAL 34981 5 S1041* L 7 SEAS 34 98 1 6* e UEL R, FOR REVIEW ONLY cn U Ld OT_ U 12L� < Lij < 0- V) < 41 U o n(D z 0 _j _j _j I 0o to 0) Lo r- CN Q) -0 0 ItN r_1 0 (D 0 LO 0) Q) Ld 00 00 Q� N nV) -C 0 Li -I � C O� Z Z 0) 0) W z Ld -0 Ld ~ 0 - -C U) _j U l­- � 0 LW 173 MEN 0010 _j < Z Uj O < z _j Z 0 Of 0 C) ts� 0 LL_ ^ 04 Of 0 >- V) z Z _j 0 0 LLJ F_ 0 z 0 z 0 Drawn By JHJ Checked By SRN DATE: 30JUN 2021 REVISED: zL16 SEP 2020 > SITE V) W PLAN _j _j < SITE 6 DETAILS _j la-. Job Code HCSS1 Dwg No. SITE 602