HomeMy WebLinkAboutNCS000606_Email RE Following Part V Boiler in NC0039586_20210924Georgoulias, Bethany
From: Young, Brianna A
Sent: Friday, September 24, 2021 2:53 PM
To: Georgoulias, Bethany; Safrit, Don
Cc: Chernikov, Sergei; Wilson, Bob; Lucas, Annette
Subject: RE: [External] HNP NPDES NC0039586 - Industrial Stormwater Conditions Boilerplate
Part V
Don,
Please follow the standard language (Part V) of the previous NPDES wastewater permit concerning stormwater until the
stormwater permit application can be reviewed. However, one caveat to that is we suggest you use eDMR for the
stormwater outfalls to meet current EPA requirements. We will add the stormwater outfall locations to our database
under the wastewater permit NC0039586 for now so that you can submit electronically if you choose. We will hopefully
have this done sometime next week. Please let me know if you have any other questions.
Thank you,
Brianna Young, MS (she/her)
Environmental Program Consultant
Industrial Individual Permits Coordinator
Stormwater Program
NC DEQ/ Division of Energy, Mineral, and Land Resources (DEMLR)
Brianna.Young@ncdenr.gov (e-mail preferred during State of Emergency)
919-707-3647 (office)
Mailing address: 1612 Mail Service Center, Raleigh, NC 27699-1612
Physical address: 512 North Salisbury Street, Raleigh, NC 27604
Email correspondence to and from this address is subject to the North Carolina
Public Records Law and may be disclosed to third parties.
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted
operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts.
To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with
the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your
patience as we continue to serve the public during this challenging time.
From: Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>
Sent: Thursday, September 23, 2021 12:00 PM
To: Safrit, Don <Don.Safrit@duke-energy.com>
Cc: Chernikov, Sergei <sergei.chernikov@ncdenr.gov>; Wilson, Bob <Bob.Wilson@duke-energy.com>; Young, Brianna A
<Brianna.Young@ncdenr.gov>; Lucas, Annette <annette.lucas@ncdenr.gov>
Subject: RE: [External] HNP NPDES NC0039586 - Industrial Stormwater Conditions Boilerplate Part V
Don,
We discussed this this morning, and Brianna Young will be following up with you soon.
Best regards,
Bethany Georgoulias (she/her)
Environmental Engineer
Stormwater Program, Division of Energy, Mineral, and Land Resources
N.C. Department of Environmental Quality
919 707 3641 office
bethany.georgoulias@ncdenr.gov
512 N. Salisbury Street, Raleigh, NC 27604 (location)
1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing)
Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
DES-"
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has
adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or
are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to
appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your
requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging
time.
From: Safrit, Don [maiIto: Don.Safrit@duke-energy.com]
Sent: Tuesday, September 21, 2021 8:17 AM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc: Chernikov, Sergei <sergei.chernikov@ncdenr.gov>; Wilson, Bob <Bob.Wilson@duke-energy.com>
Subject: RE: [External] HNP NPDES NC0039586 - Industrial Stormwater Conditions Boilerplate Part V
Importance: High
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Bethany,
Here's the Part V which was in the previous HNP permit (NC0039586). We primarily want to be sensitive to any changes
in boilerplate language from the previous version to now so I can review with all the HNP folks involved with this matter.
While we are on the Industrial Stormwater topic, any status report on the HNP individual Industrial Stormwater Permit
(NCS000606)?
Language is in the current permit just issued by DWR which "expire" once DEMLR issues HNP ISP NCS000606.
Let me know if we need to discuss any of these aspects.
Thanks, Don
HNP NCO039586 —
art V — Industrial Stormwater Boilerplate Lang
No changes; however, there will be an Individual Industrial S
(NCS000606) issued in the future and the current N 96 9
obligations will become "null & void" once this new Individual
effect.
Part I (A)(21) STORMWATER MONITORING REQUIREMEI
seq.,15A NCAC 02h .O126 et seq.]
Stormwater conditions under this section will expire on the e{
individual stormwater permit is issued to the facility by the Di
and Land Resources.
Donald (Don) Safrit, P.E.
Lead Environmental Specialist
Duke Energy I Permitting and Compliance, Carolinas
410 S. Wilmington Street I Raleigh, North Carolina 27601
Office: (919) 546-6146 1 Cell: (984) 209-0940
E
From: Chernikov, Sergei <sergei.chernikov@ncdenr.gov>
Sent: Monday, September 20, 2021 9:39 AM
To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov>
Cc: Wilson, Bob <Bob.Wilson@duke-energy.com>; Safrit, Don <Don.Safrit@duke-energy.com>
Subject: RE: [External] HNP NPDES NC0039586 - Industrial Stormwater Conditions Boilerplate Part V
i1
Bethany,
Could you please e-mail me the latest version of the Stormwater Boilerplate Language.
Thank you!
Sergei
Sergei Chernikov, Ph.D.
Environmental Engineer III
Industrial NPDES Permitting Unit
NEW Tel. 919-707-3606
1617 Mail Service Center, Raleigh, NC 27699-1617
Express Mail: 512 N. Salisbury St., Raleigh, NC 27604
From: Safrit, Don [mailto:Don.Safrit@duke-energy.com]
Sent: Monday, September 20, 2021 9:35 AM
To: Chernikov, Sergei <sergei.chernikov@ncdenr.gov>
Cc: Wilson, Bob <Bob.Wilson@duke-energy.com>
Subject: [External] HNP NPDES NCO039586 - Industrial Stormwater Conditions Boilerplate Part V
Importance: High
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Sergei,
We were reviewing the received permit and noticed the Industrial Stormwater Boilerplate (Part V) was not attached to
the original permit received at the facility. Can you issue a clarification letter and transmit a copy of the Part V
Boilerplate to note it should have been included (include an electronic copy to Bob & myself)? I will send a copy of the
Boilerplate from the previous permit separately to guard against any email system rejections due to file sizes.
Please let me know if any questions or if we need to discuss.
Thanks, Don
Donald (Don) Safrit, P.E.
Lead Environmental Specialist
Duke Energy I Permitting and Compliance, Carolinas
410 S. Wilmington Street I Raleigh, North Carolina 27601
Office: (919) 546-6146 1 Cell: (984) 209-0940
DUKE
ENERGY.