Loading...
HomeMy WebLinkAbout310670_Compliance Evaluation Inspection_20210928Facility Number = - W Division of Water Resources 0 Division of Soil and Water Conservation 0 Other Agency Type of Visit: 9) Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: 0 Routine 0 Complaint %Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: (i d Arrival Time: M .O()r,,A Departure Time: ,l Farm Name: 1 U' aL I u n Owner Email: Owner Name: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Swine Phone: Title: Latitude: County:Region: U tiuCJ Phone: Integrator: Certification Number: Certification Number: Longitude: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. La er Non -La er Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Dry Poultry Capacity POD. La ers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [—]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE Yes ❑ No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facili Number: "l Date of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes W No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a [—]Yes �a No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes [3 No ❑ NA tZ] NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ No ❑ NA P NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes 4is No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need rX] Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA rV1 NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes ❑ No ❑ NA NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA [)fl NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes ❑ No ❑ NA] NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA NE Reunited Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes ❑ No 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes ❑ No the appropriate box. ❑ WUP []Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? Page 2 of 3 ❑ Yes ❑ No ❑ Yes ❑ No ❑ NA R] NE ❑ NA EZ NE ❑NA (Z]NE ❑ Weather Code ❑ Sludge Survey ❑ NA g NE ❑ NA t9 NE 511212020 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes ❑ No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes ❑ No 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, Freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes [2 No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes [P No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? On Yes [—]No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). ❑ NA ( NE ❑ NA (VI NE ❑ NA NE ❑ NA NE ❑ Yes ❑ No ❑ NA P NE ❑ Yes [�] No ❑ NA ❑ NE ❑ Yes M No ❑ NA ❑ NE ❑ Yes []No ❑ NA ®NE J.JCi�hZ V Y1inrJ �ot.S�S 1 ��5 (�u c� 6"-,r Q✓) 6.Ie W;�I� Ck lJet�re 1 n dACfc�. VC Gift oi` Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 (-iuS Ck l-'6Ue �_o kz_ lP CA q 6wt - Y � 05? � Sc.<rc�ncl Cr« 'y C-v S, evi , �A 1"), 1 iA(3�A Phone: Date: /01, 511212020