Loading...
HomeMy WebLinkAbout310548_Compliance Evaluation Inspection_20210923Facility Number 0 - O Division of Soil and Water Conservation 0 Other Agency Type of Visit: (7 Com ance Inspection CJ Operation Review U Structure Evaluation U Technical Assistance Reason for Visit; Routine 0 Complaint 0 Follow-up 0 Referral O Emereencv O Other O Denied Access Date of Visit: Arrival Time: Departure Time: Farm Name: CAf) M L ama C .mP Owner Email: Owner Name: �•a,ttJvt,� �}� I V�Rfa'1GJ Phone: Mailing Address: Physical Address: Facility Contact: Title: County: jr-� Region:hOl�Q OnsiteRepresentative: L' 'JL'L. Integrator: Certified Operator: Back-up Operator: Location of Farm: Swine to Finish to Feeder -to Finish v to Wean to Finish Other Latitude: Phone: Certification Number: Certification Number: Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -La er Design Current Dry Poultry Capacity Poo. La ers Non -Layers Pullets Turkeys Turkey Poults Other Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify D WR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes U>6 ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE Page 1 of 3 511212020 Continued Facilit Number: jDate of inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes � ❑ NA ❑ NE a, If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: _ I Spillway?: Designed Freeboard (in): Observed Freeboard (in): _ :� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes ED-I<o ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes MNo ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes Ej�o ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes dNo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes dNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes n/No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s) 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes o ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes l�N ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes �Ti o ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes � ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes 90 ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes [�t<o ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes EfNNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [�o ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and I" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes En�No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes No ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facility Number: Date of Inspection: } 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes [9'g/o ❑ NA 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes NA the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: ❑ NE ❑ NE ❑ Yes ED_NT—❑ NA ❑ NE ❑ / Yes ❑ No [�A ❑ NE ❑ Yes �lo ❑ NA ❑ NE ❑ Yes �Io ❑ NA ❑ NE ❑ Yes [�o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes BNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑ No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). Sv<I olik(+�Ji� �� ��I-e .mod c a0a,,) Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: _I m S�L Y ti if V Date: 2 o 511212020