HomeMy WebLinkAbout20211142 Ver 1_More Info Received_20210930Strickland, Bev From: Matt Michel <Matt.Michel@timmons.com> Sent: Thursday, September 30, 2021 1:02 PM To: Cohn, Colleen M Cc: Goss, Stephanie; Hopper, Christopher D CIV (USA) Subject: [External] FW: Glen at Cool Springs; DWR # 20211142, SAW-2020-01161 CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Hi Colleen, I wasn't sure if you were now reviewing this project (Glen at Cool Springs DWR# 20211142), but I've forwarded you our response to comments that were made by Stephanie back in early September. Chris Hopper from the Corps had sent us a provisional 404 permit approval, and we are just waiting to hear back from the State. Thanks! Matt From: Morgan Gilbert <Morgan.Gilbert@timmons.com> Sent: Friday, September 17, 2021 2:33 PM To: Goss, Stephanie <stephanie.goss@ncdenr.gov>; Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil> Cc: Matt Michel <Matt.Michel@timmons.com>; Sydni Law <Sydni.Law@timmons.com> Subject: RE: Glen at Cool Springs; DWR # 20211142, SAW-2020-01161 Good afternoon Stephanie and Chris, Please find our response to the DWR Request for Additional Information for the Glen at Cool Springs project attached to this email. Please let us know if you have any additional comments or concerns regarding this project. Thanks, Morgan Gilbert Environmental Technician TIMMONS GROUP 1 www.timmons.com 5410 Trinity Rd, Suite 102 1 Raleigh, NC 27607 Office: 984. 255. 2351 1 Fax: 919.859.5663 Mobile: 910.338.60051morgan.gilbert@timmons.com Your Vision Achieved Through Ours From: Goss, Stephanie <stephanie.goss@ncdenr.gov> Sent: Thursday, September 2, 2021 11:47 AM To: Matt Michel <Matt.Michel@timmons.com> 1 Cc: Hopper, Christopher D CIV (USA) <Christopher.D.Hopper@usace.army.mil> Subject: Glen at Cool Springs; DWR # 20211142, SAW-2020-01161 CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Matt, I am currently reviewing the above referenced project and have the following items that require clarification: 1. Steam impact 6: the 24 linear feet impact for rip rap seems excessive. Please provide details for why this impact cannot be minimized [15A NCAC 02H .0506(b)(1)] 2. Stream impact 6: Dewatering-will there be any temporary impacts for dewatering at this stream impact. Please provide clarification if there will be temporary impact {15A NCAC 02H .0506(b)(1)] Thank you in advance. Stephanie Z. Goss Environmental Program Consultant Division of Water Resources Raleigh Regional Office 380o Barrett Drive Raleigh, NC 27609 919-791-4256 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 2 ENGINEERING | DESIGN | TECHNOLOGY 5410 Trinity Road Suite 102 Raleigh, NC 27607 P 919.866.4951 F 919.859.5663 www.timmons.com September 17, 2021 Stephanie Goss 401 & Buffer Permitting Branch NCDEQ – Division of Water Resources 3800 Barrett Drive Raleigh, NC 27609 Chris Hopper USACE – Wilmington District Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Re: Response to Requests for Additional Information Glen at Cool Springs (Brownstone) SAW-2020-01161 (Approx. 55.34 acres) Lee County, North Carolina Dear Ms. Goss, On behalf of Foxfield Atlantic Coast, LLC, we are providing a response to the Request for Additional Information (RAI) email received on September 2, 2021 for the Glen at Cool Springs, an approximately 55.34-acre site located off of Cool Springs Road in Sanford, Lee County, North Carolina (the Site). The revised Impacts Maps have been attached showing an increase to temporary wetland impacts, slight decrease to permanent stream impacts, and the addition of temporary stream impacts to the drawings and table. Additionally, a Velocity Dissipation Pad (VDP) Design table has been added below the Impacts Table (Sheet CWI-C1.7). This VDP table provides the calculations for the rip rap pad dimensions associated to Impact 6. Temporary impacts to wetlands have increased from 0.071 acres to 0.072 acres to reflect a change in the position of the pipe for Impact 5. This pipe was originally proposed to maintain the hydrologic connectivity of the wetland impacted in Impact 5. The pipe was shifted to provide hydrologic input to more of the southern portion of the wetland. Please note this change was not requested by either the NC Division of Water Resources or the US Army Corps of Engineers. For streams, we are proposing a slight decrease to permanent impacts, from 128 linear feet to 127 linear feet. This decrease is because of a slight shift in the orientation of the proposed 36” RCP. Permanent-no loss stream impacts remained the same. Temporary stream impacts have been added to the table and drawings. The comments provided by the NC Division of Water Resources (NC DWR) are outlined below in italics and are grouped by question. Our response is below each comment. 1) Stream impact 6: the 24 linear feet impact for rip rap seems excessive. Please provide details for why this impact cannot be minimized [15A NCAC 02H.0506(b)(1)]: The design of the rip rap pad dimensions is based on calculations from the NC DEQ Erosion and Sediment Control Planning and Design Manual chapter 8. The factors used for this determination include the pipe diameter, velocity, and rip rap zone. The calculations for the design of the rip rap pad are shown on CWI-1.7. Different orientations and sizes of the pipe were considered, but the length of the rip rap pad could not be reduced. Please note that the final proposed design calls for a steeper pipe slope than the original design. However, we are still proposing that the inlet and outlet of the RCP will not be buried, as per the guidelines of the new Individual Water Quality Certification. 2) Stream impact 6: Dewatering-will there be any temporary impacts for dewatering at this stream impact. Please provide clarification if there will be temporary impact [15A NCAC 02H.0506(b)(1)]: Temporary stream impacts will occur and have been added to the drawings and table (CWI- 1.6 and CWI-1.7). A total of 40 linear feet of temporary stream impacts will be associated with the dewatering of the stream at Impact 6. Updated Wetland Impacts Table 0.010 0.072 0.296 Updated Stream Impacts Table Added 127 151 191 Please review the updated Impact Maps and contact Matt Michel at (574) 514-3115 or matt.michel@timmons.com if additional information is required. Sincerely, Timmons Group Morgan Gilbert Environmental Technician Matt Michel, PWS, PhD Senior Environmental Scientist JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C0.0COVERNAD83ENVIRONMENTAL IMPACTS CITY OF SANFORD, LEE COUNTY, NORTH CAROLINA GLEN AT COOL SPRINGS NOTES: 1. BOUNDARY INFORMATION TAKE FROM SURVEY BY TIMMONS GROUP DATED AUGUST 21, 2020. 2. TOPOGRAPHIC INFORMATION TAKEN FROM LEE COUNTY GIS. 3. ENVIRONMENTAL INFORMATION TAKEN BY TIMMONS GROUP DATED JUNE 2020. 4. THE SUBJECT PROPERTY LIES IN ZONE X & AE, PER FIRM MAP #3710962300J PANEL 9623 & MAP #3710963300J. 5. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF SANFORD AND NCDOT STANDARDS, SPECIFICATIONS, AND DETAILS. SITE DATA TABLE: TOTAL AREA: 53.48 ACRES TOTAL WETLANDS: 0.76 ACRES (33,174 SF) TOTAL STREAMS: 3,241 LF TOTAL PROPOSED IMPERVIOUS: 22.59 ACRES (42.20%) N/ACOOL SPRINGS RDWELLIN G T O N D R BUCHANAN DR SOUTHERN RD SITE 0 SCALE 1"=1,000' 2,000'1,000' VICINITY MAP1" = 1000' B ROW N S TO N E D R Sheet List Table Sheet Number Sheet Title CWI-C0.0 COVER CWI-C1.1 OVERALL EXISTING CONDITIONS PLAN CWI-C1.2 OVERALL ENVIRONMENTAL IMPACTS CWI-C1.3 WETLAND IMPACTS 1-3 CWI-1.4 WETLAND IMPACT 4 CWI-C1.5 WETLAND IMPACT 5 CWI-C1.6 STREAM IMPACT 6 CWI-C1.7 ENVIRONMENTAL IMPACT TABLE AND DETAILS 8'' S A N X X WETLAND WETLAND WETLAND STREAM CHADWICK CIR CAMBRIDGE DRBRISTO L W A Y WELLINGT O N D R COOL SPRINGS ROAD - S.R. 132535 0 34 9 3 5 1 340339341330331320319 3403 4 1 330331 330329331331331 320321 300301302308309309 3 6 0 35 0 35 1351351 340339341 340338339341 350349351 360361370 38037 0 360359361 360359 33032933132131 0 30 9 3 1 13002993012 9 0 29 1 300299 310311 330 330331 320319 32 1 322 310 340 330329331340341330329331332 340 350349351 340 34 1 3 3 0 32031932134 0 350JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.1OVERALL EXISTING CONDITIONS PLAN1"=250'NAD 83LEGEND EXISTING CONTOUR PROPOSED CONTOUR FLOODPLAIN PROPOSED DRAIN EASEMENT WETLANDS 0 SCALE 1"=250' 500'250' SITE DATA TABLE: TOTAL AREA: 53.48 ACRES TOTAL WETLANDS: 0.76 ACRES (33,174 SF) TOTAL STREAMS: 3,241 LF TOTAL PROPOSED IMPERVIOUS: 22.59 ACRES (42.20%) 8'' S A N SCM 1 (WET POND)SCM 2 (WET POND) SCM 3 (WET POND) OPEN SPACE 7 195,328 SF 4.48 AC OPEN SPACE 3 45,425 SF 1.04 AC OPEN SPACE 6 33,940 SF 0.78 AC OPEN SPACE 5 38,977 SF 0.89 AC OS 111,843 SF 0.27 AC 130 131 79 77 596061 565758 55 50515253 46 54 474849 45 28 27 202122 24 18 19 17 15 16 11 1213 14 10 8 79 34 5 2 1 8685848382 111112113 109110 81 23 2526 114 103 102 101 107 106 105 104 125 124 123 129 128 127 126 95 88 94 87 93 100 92 99 91 98 97 90 96 89 62636465666768 80 78 122 108 118 117 120 116 115 121119 71 74 757273 6970 6 OS 219,148 SF 0.44 AC OPEN SPACE 4 104,818 SF 2.41 AC 293435363738404139434442 30323331XX WETLAND WETLAND WETLAND 8''W 8''W 8''W 8''W 8''W8''W 8''W 8'' W 8''W 8''W 8''W 8''W 8''W S SSS SS SS SS S S S S SS S SS S S S S S S SS S SS S SSSSS S S S S S STREAM S SCHADWICK CIR CAMBRIDGE DRBRISTO L W A Y WELLINGT O N D R COOL SPRINGS ROAD - S.R. 1325SSS S35 0 34 9 3 5 1 340339341330331320319 3403 4 1 330331 330329331331331 320321 300301302308309309 3 6 0 3 5 0 35 1351351 340339341 340338339341 350349351 360361370 38037 0 360359361 360359 33032933132131 0 30 9 3 1 13002993012 9 0 29 1 300299 310311 330 330331 320319 321 322 310 340 330329331 340341 330329331332 340 350349351 340 34 1 3 3 0 32031932134 0 3508'' S A N S JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.2OVERALL ENVIRONMENTAL IMPACTSLEGEND EXISTING CONTOUR PROPOSED CONTOUR FLOODPLAIN PROPOSED DRAIN EASEMENT WETLANDS Contractor will follow the following constructionsequence:      ·Contractor shall notify the City of Sanford Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and equipment on-site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with City of Sanford specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. 1"=250' SITE DATA TABLE: TOTAL AREA: 53.48 ACRES TOTAL WETLANDS: 0.76 ACRES (33,174 SF) TOTAL STREAMS: 3,241 LF TOTAL PROPOSED IMPERVIOUS: 22.59 ACRES (42.20%) WETLAND & STREAM IMPACT LEGEND: TEMPORARY WETLANDS - PURPLE PERMANENT WETLANDS - GREEN PERMANENT STREAM - MAGENTA PERMANENT STREAM (NO LOSS) - CYAN 8''W 8''W 8''W 8''W S SAN SAN -0+500+00 3 3 6 335 3 3 4 3 3 4 333332331330329328327326325324 322 320 317 323WETLAND IMPACT 1 PERMANENT FOR PROPOSED ROAD EXTENSION AND GRADING (3,046 SF)HEADWALL 1 329330332333331 WETLANDS IMPACT 2 PERMANENT FOR GRADING (498 SF) 11 345 348 350 353 355357 359 WETLANDS IMPACT 3 PERMANENT FOR PROPOSED RETAINING WALL AND GRADING (575 SF) WETLANDS IMPACT 3 TEMPORARY FOR PROPOSED RETAINING WALL AND GRADING (115 SF) JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.3WETLAND IMPACTS 1-3NAD 830 SCALE 1"=30' 60'30' WETLANDS IMPACT 1 LEGEND EXISTING CONTOUR PROPOSED CONTOUR FLOODPLAIN PROPOSED DRAIN EASEMENT WETLANDS Contractor will follow the following constructionsequence:      ·Contractor shall notify the City of Sanford Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and equipment on-site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to anyopen cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with City of Sanford specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. 1"=30' WETLANDS IMPACT 2 WETLANDS IMPACT 3 WETLAND & STREAM IMPACT LEGEND: TEMPORARY WETLANDS - PURPLE PERMANENT WETLANDS - GREEN PERMANENT STREAM - MAGENTA PERMANENT STREAM (NO LOSS) - CYAN HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 WETLAND IMPACT 4 PROFILE 295 300 305 310 315 320 325 330 295 300 305 310 315 320 325 330 300.5303.5311.9317.5322.9303.47325.12326.21325.68-1+00 0+00 1+00 2+00 2+50 197 LF 36" RCP @ 4.07% 30' (L) X 9' (W) X 36" (D) CLASS 2 RIP RAP PROPOSED GRADE 8" WATER MAIN RETAINING WALL EXISTING GRADE DI BP2 TOP 324.73 INV IN 311.00 (BP3-BP2) INV OUT 311.00 (BP2-BP1)1+48.77325323 320319318317 316 315 -0+500+000+00 0+50 0+95.77 WETLANDS IMPACT 4 TEMPORARY FOR PROPOSED RETAINING WALL AND GRADING (2,622 SF) HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 WETLAND IMPACT 4 WALL PROFILE 300 305 310 315 300 305 310 315 302.8304.1309.25309.00-0+50 0+00 1+00 1+50 197 LF 36" RCP @ 4.07% PROPOSED GRADE EXISTING GRADE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.4WETLAND IMPACT 4NAD 830 SCALE 1"=30' 60'30' Contractor will follow the following construction sequence:      ·Contractor shall notify the City of Sanford Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and equipment on-site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with City of Sanford specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. 1"=30' WETLANDS IMPACT 4 WETLAND IMPACT 4 PERMANENT KEY RIP RAP INTO EXISTING GRADE 183 SF LEGEND EXISTING CONTOUR PROPOSED CONTOUR FLOODPLAIN PROPOSED DRAIN EASEMENT WETLANDS PROFILE SCALE 0 0 50 5 WETLAND & STREAM IMPACT LEGEND: TEMPORARY WETLANDS - PURPLE PERMANENT WETLANDS - GREEN PERMANENT STREAM - MAGENTA PERMANENT STREAM (NO LOSS) - CYAN SAN SAN 0+000+501+001+48.77WETLANDS IMPACT 5 PERMANENT FOR GRADING, SANITARY SEWER EXTENSION, AND WETLAND HYDROLOGIC CONNECTION CULVERT (5,479 SF) WETLANDS IMPACT 4 PROPOSED RETAINING WETLANDS IMPACT 5 TEMPORARY FOR WETLAND HYDROLOGIC CONNECTION CULVERT (260 SF) WETLANDS IMPACT 5 TEMPORARY FOR WETLAND HYDROLOGIC CONNECTION CULVERT (156 SF) HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 WETLAND IMPACT 5 PROFILE 290 295 300 305 290 295 300 305 294.2295.5296.0310.59317.42-0+50 0+00 1+00 1+50 132 LF 36" RCP @ 2.36% 8" DIP 18" PROPOSED GRADE EXISTING GRADE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.5WETLAND IMPACT 5NAD 830 SCALE 1"=30' 60'30' LEGEND EXISTING CONTOUR PROPOSED CONTOUR FLOODPLAIN PROPOSED DRAIN EASEMENT WETLANDS Contractor will follow the following construction sequence:      ·Contractor shall notify the City of Sanford Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and equipment on-site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with City of Sanford specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. 1"=30' WETLAND IMPACT 5 PROFILE SCALE 0 0 50 5 WETLAND & STREAM IMPACT LEGEND: TEMPORARY WETLANDS - PURPLE PERMANENT WETLANDS - GREEN PERMANENT STREAM - MAGENTA PERMANENT STREAM (NO LOSS) - CYAN 8' 'W 8' 'W 8'' W 8''W 8''W S S S A N S A N -0+500+000+501+001+09.560+00 0+ 5 0 0+96. 3 2 333 331 329 327326325324 322 320 317 3 2 0 3 2 2 3 2 4 3 2 5 3 2 7 3 2 9330 3 3 1 33 1 3 3 1 33 0 328325323 STREAM IMPACT 6 PERMANENT FOR PROPOSED ROAD EXTENSION AND GRADING (127 LF/253 SF) HEADWALL 1 STREAM IMPACT 6 PERMANENT - NO LOSS KEY RIP RAP INTO EXISTING GRADE (24 LF/147 SF) *SEE CALCS ON SHEET CWI-C1.7 STREAM IMPACT 6 TEMPORARY (20 LF/40 SF) STREAM IMPACT 6 TEMPORARY (20 LF/40 SF) HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 STREAM IMPACT 6 PROFILE 310 315 320 325 330 335 310 315 320 325 330 335 316.1315.2317.6316.7329.01331.22317.89-0+50 0+00 1+00 1+50 8 inch SDR 26 91 LF 30" RCP @ 3.52% 121 LF 36" RCP @ 3.96% PROPOSED GRADE EXISTING GRADE 8" WATER MAIN RETAINING WALL 24' (L) X 9' (W) X 26" (D) CLASS 1 RIP RAP HORIZ SCALE: 1"=50' VERT SCALE: 1"=5 HEADWALL 1 PROFILE 310 315 320 325 310 315 320 325 316.14318.80316.4315.0-0+50 0+00 1+00 1+50 121 LF 36" RCP @ 3.96% PROPOSED GRADE EXISTING GRADE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.6STREAM IMPACT 6NAD 830 SCALE 1"=30' 60'30' LEGEND EXISTING CONTOUR PROPOSED CONTOUR FLOODPLAIN PROPOSED DRAIN EASEMENT WETLANDS Contractor will follow the followingconstruction sequence:      ·Contractor shall notify the City of Sanford Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and equipment on-site. For utility crossings with casings, the carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with City of Sanford specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. VARIES STREAM IMPACT 6 PROFILE SCALE 0 0 50 5 WETLAND & STREAM IMPACT LEGEND: TEMPORARY WETLANDS - PURPLE PERMANENT WETLANDS - GREEN PERMANENT STREAM - MAGENTA PERMANENT STREAM (NO LOSS) - CYAN TEMPORARY STREAM - ORANGE JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.07/09/2021 GLEN AT COOL SPRINGSCOOL SPRINGS ROAD, SANFORD, LEE COUNTY460185410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE331 331 M. ZACCARDO CWI-C1.7ENVIRONMENTAL IMPACT TABLE AND DETAILSN/A TEMPORARY PUMP AROUND