Loading...
HomeMy WebLinkAbout20211447 Ver 1_Sketch_20211001tijo"y I a tt �1t ;.: r�+IJ a i1 it t.il� i { a�.t,ti`Ji PROPERTY LEGAL DESCRIPTION: LOT NO:22 PLAN NO: STREET ADDRESS: (43e Please print: Property Owner: G-0 rcAO n 4Li rre i i Property Owner: PARCEL ID: The undersigned, registered property owners of the above noted property, do hereby authorize Randall Clawson of Clawsons Pile Driving and Construction (Contractor/Agent) (Name of consulting firm) to act on my behalf and take all actions necessary for the processing, issuance and acceptance of this permit or certification and any and all standard and special conditions attached. Property Owners Address (if different than property above): gcer4 9A-br4�, V 49- -3io Ch a-r (o 4= e AJ C- Aga i(p Telephone: 3 1 `i - � Q q - y ©17% We hereby certify the above information submitted in this application is true and accurate tothe best of our knowledge. Authorized-'SWnature uthorized Signature oe5j r7l-7-1 Date ' Date CATAWBA RIPARIAN BUFFER NOTIFICATION FORM Project Name/address: L 3 6 CJ q C nty: Cp q C Owner: Cr,5rAon Uur!e%1 Print Contractor/agent: nt L/ Signatu The approval is for the purpose and design described in your application. Impacts not indicated in the application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC 02H .0506 and 15A NCAC 02B .0243(8)] Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed. Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)] Benching and grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)] Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)] Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)] Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)] Acknowledgement of Notification HURk9'J. , hereby state that I have been informed of the Catawba Riparian Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be taken such that the construction will be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plan(s) and specification(s), and other supporting materials. LJSignature (owner): Date: 09 k