Loading...
HomeMy WebLinkAboutNCC215459_ESC Approval Submitted_20211001ROY COOLER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director July 26, 2021 LETTER OF APPROVAL Vannoy Construction Attention: Rob Cook 1608 US Hwy 221, North Jefferson, North Carolina 28640 RE: Project Name: Cabarrus County EMS Headquarters Acres Approved: 7.48 Project ID: CABAR-2021-073 County: Cabarrus City: Concord Address: 793 Cabarrus Avenue River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Vannoy Construction Date Received by LQS: July 12, 2021 Plan Type: Revised Dear Mr. Cook: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129, As of March 1, 2019, all new construction activities are required to complete arldt ubmit an electronic Notice of Intent (NOT) form requesting a Certificate of Coverage (COC) under the NCG010000 'nstruction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOT form may be accessed at deq.nc.gov/N000I. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul,clark@ncdenr.gov. After you submit a complete and correct NOT Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. North Carolina Department of Environmental Quality I Division Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 -0-000 704-663-1699 Letter of Approval Vannoy Construction July 26, 2021 Page 2 of 2 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, 61 Af_� Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NCGOI Fact Sheet Benesch Attention: Wesley E. Sherrill, PE 2359 Perimeter Point Parkway, Suite 350 Charlotte, North Carolina 28208 Inspection Department