Loading...
HomeMy WebLinkAboutNC0024970_Authorization to Construct_19870615State of North Carolina Depai ti iient of Natural Resources and Community Development Division of Environmental Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor R. Paul Wilms S. Thomas Rhodes, Secretary June 15, 1987 Director Mr. 0. Wendell White, City Manager City of Charlotte 600 E. Trade Street Charlotte, NC 28202 SUBJECT: Permit No. NC0024970 Authorization To Construct City of Charlotte Wastewater Treatment Facility EPA Project No. C370377-07 Dear Mr. White: The final plans and specifications for the subject project have been reviewed and found to be satisfactory. Authorization is hereby granted for the construction of modifications and improvements to the existing 30.0 mgd activatedsludge plant to consist of additions, modifications and improvements to the existing 30.0 mgd activated sludge wastewater treatment plant to consist of a new adminis- tration building; a new maintenance facility; two (2) new gravity. sludge thickners; mechanical sludge screening and pumping facility; two aeration basin splitter boxes; one (1) clarifier splitter box; one (1) gravity filtration complex consisting of eight (8) filters with central backwash system; a non -potable water pump station and piping; a sludge thickening/dewatering complex with one (1) new dewatering centrifuge, three (3) new thickening centrifuges and relocation/ modifications of one (1) existing dewatering centrifuge; an effluent weir box; modification to the existing influent structure; a new mechanical bar screen and conveyor system; modifications to the existing mechanical bar screen; one (1) grit separator and classifier; influent pump station modifications; modifications to the primary clarifier to improve sludge removal; trickling filter ventilation; improvements to existing final clarifiers; conversion of polishing ponds to mechanically aerated post aeration basins; modifications to the intermediate pump station and RAS pump station; modification to the existing chlorine contact basins, chlorine storage building, and chlorine feed system; aeration blower facility modifications; anaerobic digester modifications, including changes to the digester, sludge holding tank, sludge holding tank, digester control building, boiler building; gas storage sphere and the sludge holding tank controlbuilding; and associated instrumentation, yard piping, site work and electrical work. Pollution Prevention Pays P.O. Box 27687, Raleigh, North Carolina 27611-7687 Telephone 919-733-7015 An Equal Opportunity Affirmative Action Employer Do not proceed with construction until the Authorization -to -Award package, EEO, and MBE documentation/certification have been reviewed, and you are in receipt of our approval if Federal Funding is desired for project construction. The permittee shall employ an actively State certified wastewater treatment plant operator to be in responsible charge of the wastewater treatment facilities. Such operator must hold a valid State certificate of the grade at least equivalent to the classification assigned to the wastewater treatment facilities by the Certification Commission. When a new chief operator must be obtained to be in responsible charge of the new facilities, it is required that this be done by the time the construction of the facili- ties is 50% completed. This Authorization -to -Construct is issued in accordance with Part III, Paragraph C of NPDES Permit No. NC0024970 issued June 1, 1984, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the approved plans, specifications, and supporting documents; and are in compliance with the conditions and limitations specified in Permit No. NC0024970. The permittee shall obtain a sludge analysis and a sludge E.P. toxicity analysis; and obtain approval of these analyses from the Division of Health Services, Solid Waste Management Branch prior to the disposal of any sludge from the new wastewater treatment plant. Copies of the analyses, supporting documents, and approvals shall be submitted to the Division of Environmental Management's Water Quality Section and the Mooresville Regional Office. During the construction of the proposed additions/modifications, the permittee shall continue to properly maintain and operate the existing wastewater treatment facilities at all times, and in such manner, as necessary to comply with the effluent limits specified in the NPDES Permit. You are reminded that it is mandatory for the project to be constructed in accordance with the North Carolina Sedimentation Pollution Control Act and, when applicable, the North Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractors responsibilities shall be in complying with these acts. The selling or free distribution of wet, dried, composted sludge or sludge -like materials from wastewater facilities without prior review and approval by this Division is illegal. One (1) set of final approved plans and specifications is to be forwarded to you, one (1) set to the Environmental Protection Agency (EPA), and one (1) set to the Corps of Engineers. If you have any questions or need additional information, please contact Mr. Bill Hoffman, telephone number 919/733-6900. Sincerely, R. Paul cc: Mecklenburg County Health Department CH2M Hill - Charlotte CH2M Hill - Atlanta Arthur Mouberry Walter D. Taft Ron McMillan Bobby Blowe W. S. Hoffman Charlotte - CE EPA EMU GPF Wilms