HomeMy WebLinkAbout20070768 Ver 1_More Info Letter_20070525Re: R-4071 Follow-up Notes
Subject: Re: R-4071 Follow-up Notes
From: "Amy E. James" <aejames@dot.state.nc.us>
Date: Fri, 25 May 2007 14:12:33 -0400
To: Rob Ridings <rob.ridings@ncmail.net>
Hi Rob,
I'd say you covered everything--unfortunately, Randy Henegar has been on
vacation since last Friday, so I haven't been able to speak to him about
these issues yet. He is supposed to be in the office next week, so
hopefully I can get up with him Wednesday (I will be out all day Tuesday).
Have a good holiday weekend!
Amy
Rob Ridings wrote:
Amy,
Just checking in to follow-up our meeting from Friday...mostly to
document our file thoroughly.
I think you said you'd check with the hydro guys to make sure that we
were reading the stormwater plans correctly on these three main points:
~1} To cover the requirements of treatment for the additional impervious
surface of the entire project, all the stormwater from the southern
portion of the road (in sheet 5) is being put into the new basin at the
intersection (in sheet 4).
Stormwater from the northern portion of the road will be partially
taken care of thru on the east side, wherefthey eventually join
the overflow from the basin. gCl~SS ~'G'c~'
All this water will then go west down the side street where the
outflow pipes at site 1 will be enlarged to handle the additional flow.
Did I cover everything?
Thanks,
Rob
Amy E. James
Environmental Specialist
Project Management Group; Eastern Region
PDEA Natural Environment Unit
NC Department of Transportation
(919) 715-7216
ae~ames~dot.state.nc.us
1 of 1 6/1/2007 11:22 AM