Loading...
HomeMy WebLinkAbout20070768 Ver 1_More Info Letter_20070525Re: R-4071 Follow-up Notes Subject: Re: R-4071 Follow-up Notes From: "Amy E. James" <aejames@dot.state.nc.us> Date: Fri, 25 May 2007 14:12:33 -0400 To: Rob Ridings <rob.ridings@ncmail.net> Hi Rob, I'd say you covered everything--unfortunately, Randy Henegar has been on vacation since last Friday, so I haven't been able to speak to him about these issues yet. He is supposed to be in the office next week, so hopefully I can get up with him Wednesday (I will be out all day Tuesday). Have a good holiday weekend! Amy Rob Ridings wrote: Amy, Just checking in to follow-up our meeting from Friday...mostly to document our file thoroughly. I think you said you'd check with the hydro guys to make sure that we were reading the stormwater plans correctly on these three main points: ~1} To cover the requirements of treatment for the additional impervious surface of the entire project, all the stormwater from the southern portion of the road (in sheet 5) is being put into the new basin at the intersection (in sheet 4). Stormwater from the northern portion of the road will be partially taken care of thru on the east side, wherefthey eventually join the overflow from the basin. gCl~SS ~'G'c~' All this water will then go west down the side street where the outflow pipes at site 1 will be enlarged to handle the additional flow. Did I cover everything? Thanks, Rob Amy E. James Environmental Specialist Project Management Group; Eastern Region PDEA Natural Environment Unit NC Department of Transportation (919) 715-7216 ae~ames~dot.state.nc.us 1 of 1 6/1/2007 11:22 AM