HomeMy WebLinkAbout20211435 Ver 1_Bridge 203 Bunc photos_20210930 Figure 1 Upstream wingwall showing void Figure 2 Tying steel and building form for new end bent face Figure 3 Tying steel, forming new end bent face showing downstream wingwall void Figure 4 Pool by end bent during dewatering activities Figure 5 Upstream diversion Figure 6 Portion of newly installed diversion channel Figure 7 Upstream wingwall after new face was poured and scour hole filled Figure 8 End bent after new face poured and scour hole filled Figure 9 Downstream wingwall after new face poured and scour hole filled