Figure 1 Upstream wingwall showing void
Figure 2 Tying steel and building form for new end bent face
Figure 3 Tying steel, forming new end bent face showing downstream wingwall void
Figure 4 Pool by end bent during dewatering activities
Figure 5 Upstream diversion
Figure 6 Portion of newly installed diversion channel
Figure 7 Upstream wingwall after new face was poured and scour hole filled
Figure 8 End bent after new face poured and scour hole filled
Figure 9 Downstream wingwall after new face poured and scour hole filled