Loading...
HomeMy WebLinkAbout20211435 Ver 1_ePCN Application_20210930 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) June 1,2021 Ver4.1 Initial Review Has this project met the requirements for acceptance in to the review process?* 6' Yes ✓ No Is this project a public transportation project?* R Yes r No Change only if needed. BIMS#Assigned* Version#* 20211435 1 Is a payment required for this project?* ✓ No payment required 6' Fee received Reviewing Office* ✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500 Select Project Reviewer* Kevin Mitchell:eads\rkmitchell Information for Initial Review la.Name of project: Bridge 203 on SR 2416 over Beetree Creek 1a.Who is the Primary Contact?* Yates Allen 1b.Primary Contact Email:* 1c.Primary Contact Phone:* ryallen@ncdot.gov (828)250-3002 Date Submitted 9/30/2021 Nearest Body of Water Beetree Creek Basin French Broad Water Classification Class C Site Coordinates Latitude: Longitude: 35.612629 -82.427009 A. Processing Information L) County(or Counties)where the project is located: Buncombe Is this a NCDMS Project ✓ Yes ( No Is this project a public transportation project?* ( Yes r No Is this a NCDOT Project?* ( Yes r No (NCDOT only)T.I.P.or state project number: WBS#(?) 13BPR.20111 Pre-Filing Meeting Information Is this a courtesy copy notification?* ✓ Yes G No ID# Version Pre-fling Meeting or Request Date 7/26/2021 Attach documentation of Pre-Filing Meeting Request here: Click the upload button or drag and drop files here to attach document July 26,2021 site meeting minutes.pdf 48.15KB Re type mast be FCF 1a.Type(s)of approval sought from the Corps: I7 Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* ✓ Yes ✓ No lb.What type(s)of permit(s)do you wish to seek authorization? rJ Nationwide Permit(NWP) ✓Regional General Permit(RGP) ✓Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? G Yes r No Nationwide Permit(NWP)Number: 03-Maintenance NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express ✓Non-404 Jurisdictional General Permit r Riparian Buffer Authorization ✓ Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: r Yes 6' No For the record only for Corps Permit: r Yes 6 No If.Is this an after-the-fact permit application?* 6 Yes rNo 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes ( No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? ✓ Yes rNo lh.Is the project located in any of NC's twenty coastal counties? ✓ Yes 6 No 1j.Is the project located in a designated trout watershed? G Yes r No B. Applicant Information 1d.Who is applying for the permit? 17 Owner r Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes !' No 2.Owner Information 2a.Name(s)on recorded deed: NC Department of Transportaion 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 55 Orange Street Address Line 2 atY State/Povince/Region Asheville NC Fbstal/Zip Cork Country 28801 USA 2e.Telephone Number: 2f.Fax Number: (828)250-3002 2g.Email Address:* ryallen@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Swannanoa 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 Oty State/Province/Region Fbstal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Beetree Creek 3b.Water Resources Classification of nearest receiving water:* Class C 3c. What river basin(s)is your project located in?* French Broad 3d.Please provide the 12-digit HUC in which the project is located. 06010105-0603 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Lightly developed rural area.Site is situated between a manufacturing facility and a church and its grounds and other facilities.Residences are nearby.Warren Wilson College within a mile.Charles Owen District Park is downsteam. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* C Yes 6 No r- Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 90 4h.Explain the purpose of the proposed project:* The project was conducted as the first phase to repair an undercut and void beneath and behind end bent 2 of the bridge.A 6-8'deep scour hole in front of the end bent was filled. Phase 2 will consist of boring through the roadway or shoulders to pump in grout to completely fill the void behind the end bent. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* Water was diverted through a diversion channel.Water that got around the diversion was pumped from the scour hole.Steel rebar was doweled into the existing end bent face.Forms were constructed to contain the concrete until it cured.Concrete was poured between the forms and existing end bent.Some concrete flowed under the end bent cap to seal off and partially fill the void. Equipment included track hoe,pump,concrete pump. 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* c Yes r No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown C' N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Yates Allen Agency/Consultant Company: NC DOT Other: 6. Future Project Plans 6a.Is this a phased project?* P Yes r No 6b.If yes,explain. Phase 1 was constructing the new end bent face and filling the adjacent scour hole. Phase 2 is to bore from the above roadway and pump in grout to completely fill the void behind the end bent. Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? No D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands fJ Streams-tributaries r Buffers r Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 dewater Temporary Dewatering Beetree Creek Perennial Both 20 90 Average(feet) (linear feet) S2 construct new end bent face Permanent Fill Beetree Creek Perennial Both 20 50 Average(feet) (linear feet) S3 fill scour hole Permanent Fill Beetree Creek Perennial Both 20 60 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 110 90 3i.Total stream and ditch impacts: 200 3j.Comments: Fill of scour hole overlapped new end bent face E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Project was necessary to repair unsafe conditions of the bridge lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Site was dewatered during construction 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ✓ Yes (7 No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: F. Stormwater Management and Diffuse Flow Plan (required by DWR) U 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes r No If no,explain why: 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* (c Yes r No Comments: G. Supplementary Information 1. Environmental Documentation la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* (r Yes r No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ✓ Yes ( No Comments:* Falls within State Minimum Criteria Checklist(MCCL) 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 2b Provide an explanation of the violation(s): 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* ✓ Yes ( No 3b.If you answered"no,"provide a short narrative description. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes 6 No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* ✓ Yes ( No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* ✓ Yes ( No 5d.Is another Federal agency involved?* ✓ Yes ( No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes ( No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? ( Yes r No 5g.Does this project involve bridge maintenance or removal? ( Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? ( Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes ( No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes ( No 5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? ✓ Yes ( No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS website 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ Yes ( No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* current maps/data bases 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes ( No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Coordinated with the Cultural Resources branch of the Environmental Analysis Unit(Mary Pope Furr and Matt Wilkerson) 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* ( Yes rNo 8b.If yes,explain how project meets FEMArequirements: The project did not impact water passage or flood zone beyond existing conditions 8c.What source(s)did you use to make the floodplain determination?* https://fris.nc.gov/fris/Index.aspx?FIPS=021&ST=NC&user=General Public Miscellaneous Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach docurrent Bridge 203 Bunc plan sheet with impacts.pdf 430.34KB Bridge 203 Bunc photos.pdf 5.54MB Bridge_203_Bunc_cover_letter signed.pdf 270.05KB Bridge_203_Bunc_PA_Checklist signed.pdf 283.17KB Buncombe Bridge#203 Enviro Map.pdf 276.74KB Buncombe Bridge#203 Vicintity Map.pdf 106.32KB RE_pre-file PCN.pdf 303.99KB RE_bridge 203 Buncombe cultural resources.pdf 285.49KB Fle rust be FIT or KW Comments Signature R By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Yates Allen Signature Y TFS Aurr-J Date 9/30/2021