HomeMy WebLinkAbout20072214 Ver 2_Approval Letter_20210830ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
S. DANIEL SMITH
Director
Girl Scout Council of Coastal Carolina
ATTN: Lon Everett
752 Camp Hardee Road
Blounts Creek, North Carolina 27814
NORTH CAROLINA
Environmental Quality
August 30, 2021
DWR # 2007-2214 v2
Beaufort County
Subject: AUTHORIZATION CERTIFICATE PER THE TAR-PAMLICO RIPARIAN BUFFER
PROTECTION RULES (15A NCAC 02B .0734) WITH ADDITIONAL CONDITIONS
Camp Hardee shoreline stabilization - 752 Camp Hardee Road, Blounts Creek
Dear Mr. Everett:
You have our approval for the impacts listed below for the purpose described in your
application dated August 20, 2021 and received by the Division of Water Resources
(Division) on August 20, 2021. Please note that you should get any other federal, state or
local permits before proceeding with your project, including those required by (but not
limited to) Sediment and Erosion Control, Non -Discharge, and Water Supply Watershed
regulations. This Authorization Certificate shall expire five (5) years from the date of
this letter.
This approval requires you to comply with the following additional conditions:
1. The following impacts are hereby approved provided that all of the other specific and
general conditions of the Buffer Rules are met. No other impacts are approved,
including incidental impacts [15A NCAC 02B. 0233(8)].
Type of Impact
Amount Approved
(units)
Permanent
Amount Approved
(units)
Temporary
Plan location/
Reference
Attached
Buffers - Zone 2
B1 (rip -rap for
stabilization)
B1 - 4000 ft2 (square
feet)
Plan Sheet 1
£ D_E
NORTH CAROLINA
Department at Environmental pualit
North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481
2. No Waste, Spoil, Solids. or Fill of Any Kind
No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian
areas beyond the footprint of the impacts depicted in the Buffer Authorization
Application. All forestry operations activities shall be performed so that no violations
of state water quality standards, statutes, or rules occur [15A NCAC 02H .0502
and .0502].
3. The Permittee shall replant the vegetation within temporarily disturbed areas
associated with this project in an "in kind" manner immediately following construction.
(Example: Disturbed areas with pre-existing grassed lawns must be replanted with
grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted
with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation
must be replanted with forest vegetation including at least two different native
hardwood tree species at a density sufficient to provide 260 trees per acre at maturity.
This density can usually be achieved by planting approximately 360 (11 x 11 spacing)
to 538 (9 x 9 spacing) trees per acre.) Restoration of trees/shrubs/forest must be
completed by the first subsequent planting season (November 1 through March 30).
Note, if the tree plantings do not survive, they will need to be replaced such that the
density is sufficient to provide 320 trees per acre at maturity. [15A NCAC 02H .0507
(c), 15A NCAC 02H .0506 (b)(3), and 15A NCAC 02B .0233 (6)]
4. This approval is for the purpose and design described in your application. The plans
and specifications for this project are incorporated by reference as part of the
Authorization. If you change your project, you must notify the Division and you may be
required to submit a new application package with the appropriate fee. If the property
is sold, the new owner must be given a copy of this approval letter and Authorization
and is responsible for complying with all conditions. [15A NCAC 02B .0507(d)(2)]
5. This approval and its conditions are final and binding unless contested. {G.S. 143-
215.5}
This Buffer Authorization can be contested as provided in Articles 3 and 4 of General
Statute 150B by filing a written petition for an administrative hearing to the Office of
Administrative Hearings (hereby known as OAH). A petition form may be obtained from
the OAH at http://www.ncoah.com/ or by calling the OAH Clerk's Office at (919) 431-3000
for information.
Within sixty (60) calendar days of receipt of this notice, a petition must be filed with the
OAH. A petition is considered filed when the original and one (1) copy along with any
applicable OAH filing fee is received in the OAH during normal office hours (Monday
through Friday between 8:00am and 5:00pm, excluding official state holidays).
The petition may be faxed to the OAH at (919) 431-3100, provided the original and one
copy of the petition along with any applicable OAH filing fee is received by the OAH within
five (5) business days following the faxed transmission.
D_E
NORTH CAROLINA
Departmental Environmental pualiit
North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481
Mailing address for the OAH:
If sending via US Postal Service:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
If sending via delivery service (UPS,
FedEx, etc):
Office of Administrative Hearings
1711 New Hope Church Road
Raleigh, NC 27609-6285
One (1) copy of the petition must also be served to DENR:
William F. Lane, General Counsel
Department of Environmental Quality
1601 Mail Service Center
Raleigh, NC 27699-1601
This letter completes the review of the Division under the Tar -Pamlico Riparian Buffer
Rules as described in 15A NCAC 02B .0734. Please contact Chris Pullinger at 252-948-3918
or chris.pullinger@ncdenr.gov if you have any questions or concerns.
Sincerely,
Robert Tankard, Assistant Regional Supervisor
Water Quality Regional Operations Section
Division of Water Resources, NCDEQ
cc: Lisa Beacham (via e-mail: lisasladelandscaping@gmail.com)
Ashley Grandy, DCM WaRO (via e-mail)
Raleigh Bland, USACE Washington field office (via e-mail)
DWR Laserfiche
D_E
NORTH CAROLINA
Departmental Environmental Itualiit
North Carolina Department of Environmental Quality I Division of Water Resources
Washington Regional Office 1943 Washington Square Mall I Washington, North Carolina 27889
252.946.6481
* ITO neLO ahicLnnck
Ire) be, cia-, Ct
11 rr06 rficLint8
Olcu)n -14-)e., Slope_
oe /11/'-/-.4"
7
0
North Carolina Environmental
Management Commission
Division al Water Resources
For, Tar -Pamlico Amin Buffer
Date Au - ,
Reviewed by 1/41---4—°-"--S1-k Q-1117-
DWR Project #2007-221,4 v2
• • ' .
••••••
IL/
- , ,
,
' fi'...4...-7.
t
V 4''
0
ROY COOPER
tjovernor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
interim Director
DWQ Project No.:
Applicant:
Project Name:
Date of Issuance of Wetland Permit:
NORTH CAROLINA
Environmental Quality
County:
Upon completion of all work approved within the 401 Water Quality Certification and/or Buffer Rules, and any subsequent
modifications, the applicant is required to return this certificate to the 401 & Buffer Permitting Unit, North Carolina Division of
Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to DWR by the applicant, the
applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
, hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence was used in
the observation of the construction such that the construction was observed to be built within substantial compliance and intent
of the 401 Water Quality Certification and /or Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
If this project was designed by a Certified Professional
Date:
, as a duly registered Professional (i.e., Engineer, Landscape
Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the
construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the
observation of the construction such that the construction was observed to be built within substantial compliance and intent of
the 401 Water Quality Certification and/or Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Registration No. Date
�prY'r+l d Im4.s�.mtr GWl,�
North Carolina Department of Environmental Quality 'Division of Water Resources - Washington Regional Office
943 Washington Square Mall, Washington, North Carolina 27889
252-946-6481