Loading...
HomeMy WebLinkAbout20070410 Ver 1_More Info Received_200707055410 Trinity Road Palisades II, Suite 320 Raleigh, NC 27607 Tel: (919) 233-9178 Fax: (919) 233-0144 July 2, 2007 1 t't', 'r air, ~ ~11;1f ,, <l ~,~'d. ... ,~ r r, r .,~ ~ ~ 1 ... Mr. Ian McMillan Division of Water Quality Mail Service Center 1650 Raleigh, North Carolina 27699-1650 130603/005 Subject: City of Greensboro Lake Townsend Dam Spillway Replacement Major 401 Water Quality Certification Extension of Mitigation Payment Dear Mr. McMillan: As we discussed this afternoon, the 401 Water Quality Certification for the Lake Townsend Dam Replacement Project requires mitigation payment to the Ecosystem Enhancement Program (EEP) by July 13, 2007 (within one month of permit issuance). The applicant has not received the U.S. Army Corps of Engineers Individual 404 Permit and therefore, respectfully requests an extension for mitigation payment until the Corps' 404 Permit is issued, prior to construction within impact areas, and no later than November 9, 2007 as specified in the EEP mitigation acceptance letter. Feel free to contact me should you have any questions or require additional information. Very truly yours, BROWN AND CALDWELL J Shearin Dramby Regulatory Specialist JSO:vb Enclosure cc: Andy Williams, Corps; Melinda King, City of Greensboro; Robert Cannon, Schnabel Engineering P:\Greensboro\Townsend Dam-130603\Pemiltting\Individual Pemtit\Permit\Mitigation Extension.doc E n v i r o n m e n t a l E n g i n e e r s eT C o n s u l t a n t s