HomeMy WebLinkAbout20191760 Ver 2_Pre-Filing Meeting Information_20210927DWR Pre-Fil ing Meeting Req u est Form
ID#*Ve rsion *
Re gional Office *
Re v ie we r List *
Contact Name *
Contact Email Addre ss *
Proje ct Name *
Proje ct Owne r *
Proje ct County *
Owne r Addre ss:
Is this a transportation proje ct?*
Type (s) of approv al sought from the DWR:
Doe s this proje ct hav e an e xisting proje ct ID#?*
Ple ase list all e xisting proje ct ID's associate d with this proje cts.*
Do you know the name of the staff me mbe r you would like to re que st a me e ting with?
Ple ase giv e a brie f proje ct de scription be low.*
20191760 2
Mooresville Regional Office - (704) 663-1699
Donna Hood
Pre-Filing Me eting Reque st submitte d 12/21/2020
Joel Howard
jmhoward@ncdot.gov
C-5621
NCDOT
Mecklenburg
City
Albemarle
State / Province / Region
NC
Postal / Zip Code
28338
Country
USA
Street Address
716 West Main Street
Address Line 2
Yes No
401 Water Quality Certification -
Regular
401 Water Quality Certification -
Express
Individual Permit Modification
Shoreline Stabilization
Yes No
SAW No. 2018-01958
Ms Donna Hood
Please give a couple of dates you are available for a meeting.
Ple ase attach the docume ntation you would like to hav e the me e ting about.
Signature
Submittal Date
This is a roadway widening project with dual roundabouts North and
South of SR 5544 (Catawba Ave) and US 21 intersection in
Cornelius. There are three impact sites along the project where
permanent and temporary surface water impacts will occur. Site 1
impacts occur at a 42" RCP and headwall. Site 2 impacts occur at a
channel relocation and a rip rap outlet. Site 3 impacts occur at a
channel relocation. This project will have 1 site that impacts a linear
wetland.
1/6/2021
1/21/2021
C5621_RDY_PSH_RABS_01_100SCALE.pdf 2.17MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
· This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
· I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
· I also understand that DWR is not required to respond or grant the meeting request.
Your project’s thirty-day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you can submit an
application.
12/21/2020