Loading...
HomeMy WebLinkAboutWQ0042789_Application (FTSE)_20210927Permit Number WQ0042789 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer dean.hunkele Coastal SWRule Permitted Flow Facility Central Files: APS _ SWP _ 9/9/2021 Permit Tracking Slip Status Project Type In review New Project Version Permit Classification A Individual Permit Contact Affiliation Facility Name Major/Minor Region 208 Goldsboro Drive Private Residential Pump Station Minor Wilmington Location Address County 208 Goldsboro Dr Onslow N Topsail Beach NC 28460 Owner Owner Name Prestige Building Group LLC Facility Contact Affiliation Owner Type Non -Government Owner Affiliation Olivia Layne Howington 4730 23rd Ave Dates/Events N Topsail Beach NC 28460 Scheduled Ong Issue App Received Draft Initiated Issuance 8/24/2021 Regulated Activities STROUD ENGINEERING, P.A. ILCE44IG� O[P 4 N A M@Wn44La1 102-D Cinema Drive 77WE Wilmington, NC 28403 A.u✓� 2 4 2021 (910) 815.0775 w TO WE ARE SENDING YOU 1�Attached ❑ Under separate cover via ❑ Shop drawings ❑ Copy of letter ❑ Prints ❑ Change order 71 ❑ Plans DATE JOB NO. ATTENTION RE: G - 2` J G— e 1 \ ' 11 , C 1'._�.�' .1 . &,�— ❑ Samples the following items: ❑ Specifications COPIES DATE NO. DESCRIPTION C 1� # W CL #2Lo s 4 60 cc 10 4�- p'14 ^IoV THESE ARE TRANSMITTED as checked below: For approval ❑ For your use `❑ As requested ❑ For review and comment ❑ FORBIDS DUE REMARKS ❑ Approved as submitted ❑ Approved as noted ❑ Returned for corrections ❑ Resubmit copies for approval ❑ Submit copies for distribution ❑ Return corrected prints ❑ PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: If enclosures are not as noted, kindly notify us at once. State of North Carolina nW Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W"6qr ;Lr Ip 1 (to be completed byDWR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: I. Applicant's name: PRESTIGE BUILDING GROUP LLC 2. Applicant type: ❑ Individual ® Corporation ❑ General Partnership ❑ Federal ❑ ❑ Municipal 3. Signature authority's name: Title: OLIVIA LAYNE HOWINGTON, MANAGER 4• Applicant's mailing address: 4730 23RD AVE. City: NORTH TOPSAIL BEACH State: NC Zip 28460 5. Applicant's contact information: Phone number: (919) 996A425 Email Address: howingtonmwh@aol.com ❑ Privately -Owned Public Utility ❑ Other IL PROJECT INFORMATION: 1. Project name: 208 GOLDSBORO DRIVE 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000_ and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: ONSLOW 4. Approximate Coordinates (Decimal Degrees): Latitude: 34.5039 ° Longitude: - 77.3958 ° 5. Parcel ID (if applicable): 4287-0638-2278 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: James H. Fentress, Jr., PE Licenge Number: 20643 Firm: STROUD ENGINEERING, PA Mailing address: 102-D CINEMA DR. City: WILMINGTON State: NC Zip: 28403 Phone number: (910) 815 7775 Email Address: jfenness0nstroudengincer.com IV. WASTEWATER TREATMENT FACILITY (W WTF) INFORMATION: 1. Facility Name: NORTH TOPSAIL WWTP Permit Number: W00005849 Owner Name: PLURIS,LLC V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ17535 Downstream (Receiving) Sewer Size: 2 inch System Wide Collection System Permit Number(s) (if applicable): WQCS_ Owner Name(s): PLURIS, LLC FORM: FTA 04-16 Page I of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No X❑N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEVI been attached? [-]Yes [:]No ®N/A 3. If the Applicant is a Home/Property Owners' Association. has an Operational Agreement (FORM: HOA) been attached? [—]Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): x❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ® Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial _% Industrial (See 15A NCAC 02T .0103(20) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(f)? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(fl) Daily Design Flow',b No. of Units Flow 8 BEDROOM BEACH HOUSE 120 gal/ DAY 8 960 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Tolol 960 GPD a See 15A NCAC 02T .0114(b). (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0I 14(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patters, and other measured data. S. Wastewater generated by project: 960 GPD (per I5A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) j Length (feet) Material NA ➢ Section 11 & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC V III. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Puma Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: PUMP STATION 2. Approximate Coordinates (Decimal Degrees): Latitude: 34.5039 ° Longitude:-77.3958 ° 3. Design flow of the pump station:0.00096 millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): 13 gallons per minute at 110 feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 2 40 PVC 6. Power reliability in accordance with I SA NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: 0 Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(l)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (g) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below (vertical) 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet "Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from annual high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top sloe of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305(g) contains alternatives where separations in 02T.0305(f) cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Sm face Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) [Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? [Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project require coverage/authorization under a 404 Nationwide or []Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ❑ Yes [—]No Per 15A NCAC 02T.0105fc)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes gNo ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version l as applicable? ® Yes ❑ No If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review. Anproval of the request is reguired prior to submittal of the Fast Track Application and supporting documents 2. Professional Engineer's Certification: name from Application Item I11.1.) that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seat, signature, and date: ,.�"" C.111"",�� `OQKH c: QOFESS/p •, 29, SppEAL y9ri 3. Applicant's Certification per 15A NCAC 02T .0106(b): OLIVIA LAYNE HOWINGTON, ME name & that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine nott o exceed $10,000 as well as civil penalties up to $25,000 per violation. / Signature: Date: 1/J " K—, z FORM: FTA 04-16 Page 5 of 5 SI I 0 A, N 1000 ft Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: PRESTIGE BUILDING GROUP LLC Project Name for which flow is being requested: 208 Goldsboro Lane More than one FTSE may be required for a single project if the owner of the WWTP Is not responsible for all prnnp stations along (lie route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: Pluris North Topsail WWTP b. WWTP Facility Permit #: _ WQ0005849 All flows are in MGD c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used 1.542 0.12500 0.72600 0.00960 0.133560 55 % II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Average Approx. Obligated, Pump Pump Daily Current Not Yet Total Current Station Station Firm Flow** Avg. Daily Tributary Flow Plus (Name or Permit Capacity, * (Finn / pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** PS 49 WQ0034483 2.14 0.856 0.350 0.120 0.470 0.386 * The Firm Capacity (design Bow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): North Topsail Beach Consolidation Downstream Permit Number: WQ000275 Page I of 6 FTSE 10-18 III. Certification Statement: I Randy Hoffer certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Title of Signing Offtcicrl Page 2 of 6 FTSE 10-18 LIMITED LIABILITY COMPANY ANNUAL REPORT 102017 NAME OF LIMITED LIABILITY COMPANY: Prestige Building Group LLC SECRETARY OF STATE ID NUMBER: 2045810 STATE OF FORMATION: NC REPORT FOR THE CALENDAR YEAR: 2021 SECTION A: 1. NAME OF REGISTERED AGENT: Howington, Michael John, Sr 2. SIGNATURE OF THE NEW REGISTERED AGENT: E - Filed Annual Report 2045810 CA202107804599 3/19/2021 1215 SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT 3. REGISTERED AGENT OFFICE STREET ADDRESS & COUNTY 4. REGISTERED AGENT OFFICE MAILING ADDRESS 4730 23rd Ave 4730 23rd Ave North Topsail Beach, NC 28460 Onslow County North Topsail Beach, NC 28460 SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: General 2. PRINCIPAL OFFICE PHONE NUMBER: (919) 4674425 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS 4730 23rd Ave 5. PRINCIPAL OFFICE MAILING ADDRESS 4730 23rd Ave N Topsail Beach, NC 28460 N Topsail Beach, NC 28460 6. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business ❑ The company is a service -disabled veteran -owned small business SECTION C: COMPANY OFFICIALS (Enter additional company officials in Section E.) NAME: Olivia Layne Howington TITLE: Manager ADDRESS: NAME: Olivia Layne Howington NAME: TITLE: Member TITLE: ADDRESS: ADDRESS: 4730 23rd Ave 4730 23rd Ave North Topsail Beach, NC 28460 North Topsail Beach, NC 28460 SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business entity. Olivia Layne Howington SIGNATURE Form must be signed by a Company Official listed under Section C of This form. 3/ 19/2021 DATE Olivia Layne Howington Manager Print or Type Name or Company Official Print or Type Title of Company Official This Annual Report has been filed electronically. MAIL TO: Secretary of State. Business Registration Division. Post Office Box 29525, Raleigh. NC 27626-0525 ■ STROUD ENGINEERING, R A. CONSULTING ENGINEERS 102D CINEMA DRIVE WLMINGTON. NORTH CAROLINA 28403 LICENSE NO. C-0647 August 23, 2021 NCDEQ Division of Water Resources 102 Cardinal Drive Wilmington, NC 28403 attn. Mr. Dean Hunkele Re: 208 Goldsboro Drive Pressure Sewer Connection Pluris North Topsail Pressure Sewer Collection System Mr. Hunkele: Please find the attached FTA 04-16, FTSE 10-18, supplementary maps and documents in support of the applicant Persis-Nova Construction, Inc. Thank you for your assistance with this matter. If you have any questions or concerns pertaining to this project, feel free to contact me. Respectfully, yi��urrt�¢a2911, James H Fentress Jr., P.E. Stroud Engineering, PA Attachments JHF/if File WAMaster\PW-1547\Sewer\208 Goldsboro Drive Sewer Permit App Cover.doe 1078 COMMERCE STREET 102D CINEMA DRIVE 3302C BRIDGES STREET GREENVILLE, NORTH CAROLINA 27858 WILMINGTON, NORTH CAROLINA 28403 MOREHEAD CITY. NORTH CAROLINA 28557 252.766.9352 910.815.0775 252.247.7479