Loading...
HomeMy WebLinkAboutNCC204924_NOT Closeout Documents_20210929North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Lenoir Project: Tull Wooten III Project River basin: Neuse Person financially responsible: Resource Environmental Solutions, LLC - Daniel Project #: LENOI-2021-008 Ramsey, General Manager Address: 3600 Glenwood Ave, Suite 100, Raleigh, NC 27612 1. Project Location: Tower Hill Rd, Kinston Pictures: No 2. Weather and soil conditions: sunny, warm, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one onsite Title: Inspection report: Sent Report Date given/sent: September 30, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General 10. Comments: Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.goy/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process Reported by: Bradley West Others present: Date of inspection: September 28, 2021 Time arriving on site: 10:15 AM Time leaving site: 10:45 AM cc: send inspection reports to kwebber2res.us Katie Webber project manager