Loading...
HomeMy WebLinkAbout20130548 Ver 1_Staff Comments_20130816Strickland, Bev From: Lucas, Annette Sent: Fhday, August 10.201311:43AM To: Smith, ChorriL Cc: Dovano.Boyd- Gtriokland.Bov Subject: 13'0548 New Hope Development — Lot 2 CONDITION Attachments: 13-0548 New Hope Development — Lot 2 - CONDITION.clocx Cherri, |t looks like they still have a way togo with the City of Raleigh, so| suggest vxe issue it with the attached condition ifyou are OK with the impacts. Thanks, Annette Annette M. Lucas, PE Environmental Engineer lVCI}ElVR I I}EINLR I BtormwaterPrngracu I85O Mail Service Center, Raleigh, lVC 27699 -1650 (D�ail) 512 N. Salisbury St, Raleigh, NC 27804 1 Q'u Floor (.Looatiora8n Parcels) Phone: (9I9) 807-838I 1 Fax: (919) 807-6494 1 Email: Weboite: A Before printing this email, please consider your budget and the environment. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 13 -0548 New Hope Development— Lot 2 -CONDITION AML comments August 16, 2013 Stormwater Management Plan (SMP) Approval from Local Community Required Because the locally approved SMP is being used to satisfy the diffuse flow provisions of the Neuse Buffer Rule, you are required to provide one copy of the approved SMP, including plan details on full -sized plan sheets, with proof of the City of Raleigh's approval. The approved SMP shall be submitted to the DWR Webscape Unit (1650 Mail Service Center, Raleigh, NC 27699 -1650) before any impacts authorized in this certification occur. After it is approved and submitted to the Division, the SMP may not be modified without prior written authorization from the City of Raleigh If the SMP is modified in the future, then you shall provide one modified SMP with proof of approval to the DWR Webscape Unit prior to the commencement of the modifications.