Loading...
HomeMy WebLinkAboutSW8941015_Historical File_19950328 (2)State of North Carolina Department of Environment, Health, and Nat",ural Resources Wilmington Regional Office James B. Hunt, Jr., Governor DIVISION OF ENVIRONMENTAL MANAGEMENT Bob Jamieson Jonathan B. Howes, Secretary WATER QUALITY SECTION Regional Manager March 28, 1995 Mr. Mark B. Pearsall PVC, Incorporated Post Office Box 7246 Rocky Mount, North Carolina 27804 Subject: CERTIFICATION OF COMPLIANCE with Stormwater Regulations Stormwater Project No. SW8 941015 Holiday Inn Wrightsville Beach New Hanover County Dear Mr. Pearsall: This Certification is pursuant to the revised application for the Holiday Inn Wrightsville Beach received on March 24, 1995. Staff review of the revised project plans and specifications has determined that the stormwater control system as proposed will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1003(h). Stormwater runoff will be treated by underground infiltration trenches sized to contain the first inch of runoff from 142,739 square feet of buildings, parking and sidewalks located on the site. This revised Certification is issued for a change in the trench detail design. Any modification of the plans submitted to and approved by this Office or further development of this site regardless of the fact that such modification may be less than 1 acre, will require an additional Stormwater Submittal/Modification and approval prior to initiation of construction. Modifications include but are not limited to; project name changes, transfer of ownership, redesign of built -upon surfaces, addition of built -upon surfaces, redesign or further subdivision of the project area as shown on the plans submitted to -and approved by this- Office.--- ------ -- - ---- - —-.----- - - - --- - - - This Certification shall be effective from the date of issuance until rescinded. The project shall be constructed and maintained in accordance with the plans and specifications approved by the Wilmington Regional Office. This Certification supersedes the one issued to you on November 18, 1994. The developer is responsible for obtaining any and all permits and approvals necessary for the development of this project. This could include the Division of Coastal Management under CAMA requirements, The Division of Environmental Management under Wetland 401 Water Quality Certification, and/or a Dredge and Fill Permit, and/or a Sewer Extension/Collectiori Permit, U.S. Army Corps of Engineers 404 Wetland Permit, NPDES Stormwater Permit if disturbing five acres or more, local County or Town Agency permits under their local ordinances, or others that may be required. 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845 a Telephone 910-395-3900 • Fax 910-350-2004 An Equal Opporlunity Affirmative Action Employer Mr. Pearsall March 28, 1995 Stormwater Project No. SW8 941015 ------------------------------------------- A professional engineer must certify that the stormwater system has been installed in accordance with the approved plans and specifications upon completion of construction. The attached certification should be received by this Office within 30 days of construction completion. The infiltration trenches shall be constructed in their entirety, and operational prior to the construction of any impervious surfaces proposed for the project, except roads. If you have any questions concerning this matter, please call Ms. Linda Lewis or me at (910)- 395-3900. Sincerely, a Adkins Water Quality Supervisor DA/arl: S:\WQS\STORMWAT\CERTIFIC\941015.NOV cc: Jim Honeycutt, P.E. Sky Conklin New Hanover County Building Inspections -- --Beth-Easley;-New-Hanover County -------.---_--- John Parker, CAMA Bradley Bennett Linda Lewis ....,, Central Files DIVISION OF ENVIRONMENTAL MANAGEMENT INFILTRATION SYSTEM PROJECT DATA Project Name: Project No.: Location: Applicant Name: Mailing Address: Submittal Date: Water Body Receiving Stormwater Runoff: Classification of Water Body: Basin size: Basin Depth: Bottom Elevation: Design Storage Elevation: Total Impervious Surfaces Allowed: Green Areas Draining to Basin: Storage volume required: Storage volume provided: Infiltration Rate and Type of Soil: Holiday Inn Wrightsville Beach SW8 941015 New Hanover Mr. Mark B. Pearsall PVC, Incorporated Post Office Box 7246 Rocky Mount, North Carolina 27804 October 26, 1993 March 24, 1995 Revised ICWW "SA" 901 linear feet of 8'W x 3.0'H trench 3.0' 3.0 MSL 6.55 MSL 142,739 square feet 36,342 square feet 11,995 cubic feet 12,321 cubic feet .52 in/hr, Newhan Sand Couunents: Site infiltration rate will be much higher that .52 in/hr. Like systems on the island function very well. The trench drains at the entrances to the site act as the overflow weirs. INFILTRATION SYSTEM EVALUATION L Yes No System is capable of treating and disposing of runoff from all impervious surfaces resulting from 1-1/2 inches of rain. 2. Yes No The system is located at least 30 feet from surface waters. 3. Yes No The system is a minimum of 100 feet from water supply wells. 4. Yes No The bottom of the system is a minimum of 2 feet above the seasonal high water table. 5. Yes No Runoff in excess of the design volume by-passes the system and does not flush pollutants through the system. 6. Yes No The vegetative filter provides non -erosive flow for the 10 year storm, even distribution of the runoff over the length of the filter, a slope of 5 % or less, and is planted with natural, grassed, or artificially planted wetland vegetation. 7. Yes No The system has been shown to completely draw down in 5 days. 8. Yes No Soil has a minimum hydraulic conductivity of 0.52 in/hr. 9. Yes No The system is not sited on or in fill material. 10. Yes No The system has an observation well. 11. Yes No An Operation and maintenance plan has been provided for the system. 12. Yes No THIS PROJECT MEETS THE STORMWATER CONTROL REQUIREMENTS OF 15 NCAC 2H. (g), (h), 0), (k) and (1). For YES, items 1-14 must all be highlighted YES. DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Wilmington Regional Office ZS HAZ 95 Date Date 28r/mcb )99 Date cc:Applicant/Bradley Bennett/arl/WiRO/CF Individual Evaluating Form/Plans 0 06�IAA-c.. S 16 uUO) 13 y v i ,ic.6lqG csw) s Regional Soil Scientist egional Water Quality Supervisor Holiday Inn Wrightsville Beach New Hanover County Stormwater Project No. SW8 941015 Engineer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for [Project Owner] hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Recorded deed restrictions are attached to provide further evidence that the project has been built within substantial intent of the approved stormwater plans and spectifications. Signature Registration Number Date INFILTRATION SYSTEM OPERATION & MAINTENANCE PLAN Project Name: Holiday Inn - SunSpree Resort at Wrightsville Beach, N. C Project No. Responsible Party: PVC Inc. Phone No. Address: P. O. Box 7246 Rocky Mount N. C. 27804 I,,. Monthly, or after every runoff. producing rainfall event, whichever comes first: A. Inspect the catch basin grates and volume below and remove accumulated debris. B. Inspect swales and vegetated filter, if any, and remove accumulated debris. II. Quarterly: A. Inspect the infiltration system catch basins and infiltration piping for proper functioning. Accumulated trash will be cleared from basin grates, basin bottoms and piping will be checked for obstructions and cleared as required. III. Semi-annually: A. Accumulated sediment from the bottom of the catch basins will be removed. B. The infiltration piping will be checked. If volume is reduced to 75 % of original design volume, the sediment will be removed. C. Grassed swales and vegetated filter, if any, will be reseeded twice a year as necessary. IV. General: A. Mowing of the side slopes of the swale, if any, will be accomplished according to the season. Maximum grass height will be 6". B. All components of the infiltration system will be kept in good working order. Repair or replacement components will meet the original design specifications in accordance with the approved stormwater plan. riPPIFIE Page 1 of 2 NORR , 3 ,1PO4 "I 0i, ti Stormwater Cettification Mo.2 .�AQI Holiday Inn - SunSpree Resort at Wrightsville Beach, North Carolina V. Special Requirements: I, 1. Annual testing/cleaning of the system shall be accomplished by introducing high pressure water in the system or other acceptable method. 2. Any failure of the system shall necessitate the repair/replacement of the failed component(s) and the immediate restoration of the system to the original design specifications. Allci, ZAA. hereby acknowledge that I am the financially responsible party for m lntenanc of the infil ration system. I will perform the maintenance as outlined above, as part of the Certification of Compliance with Stormwater Regulations received for this project. JJ� Signature: Title: //ih �� �" Date: A h a Notary Public for the State of� County of i�+ `-�,-- s , do hereby certify thatZ?2, ;���t/ personally appeared before me this day of �, 199_ and acknowledge the due execution of the foregoing instrument. Witness my hand and official seal, SEAL My commission expires Page 2 of 2 DIVISION OF ENVIRONMENTAL MANAGEMENT DENSITY ENGINEERED )C PROJECT DATA Project Name H-C;P L. l Location (County, Township/Municipality, Address, State Road) I ° i 014, L V V r� -T `— l L l X brA-C.1� Z Owner's Name Q V c r N C, MailIingAddress R d , Phone Number Submittal Date_ �G \ 4 Brief Description (include map and appropriate drawings)97j� L Ar jZ C-A 1 ce S, of ►a rv� s c�A 11 fl sza�z w MrNf rt: ►7T-J ' Name of Water Body Receiving Stormwater Runoff 1 CWVJ-- Classification of Water Body_ SA If SA waters, engineered system, and distance is <0.5 miles, attach report of chloride sampling results mg/1 State/Federal Permits/Approvals Required (Check appropriate blanks) CAMA Major >e Sedimentation/Erosion Control X 404 Permit DEM/DHS Sewage Disposal Other (Specify) CALCULATION OF BUILT UPON AREA Built upon area means that portion of a development that is covered by impervious or partially pervious cover including buildings, pavement, recreation facilities, gravel, etc., but not including wood decking. If the project includes areas draining to different water classifications, please note them separately below. Classification Built upon area Total Project Area % Built upon Area Allowable B/U Area Subwatershed s$ � 47- -t S9 PT z 1 O' I T z. 5-,51124'r-Tz Subwatershed Is the Project B/U Area 5 the Allowable B/U Area? 0 is I (If no, an engineered system is required.) Built upon area = (built upon area / total project area) * 100 Built upon area limits for projects to meet density: SA waters — 25%, Other ---30% STORMWATER COLLECTION SYSTEM Describe how the runoff will be treated 5l-fie V zP }Jukes, T Office use only p E C E 0 V E D OCT 2 6 M D E M PRO] # sw 8 C(4 lot 5 Is the built upon area at least 30 feet from mean high water of all surface waters? `? t'c S If no,'please provide a description (Note: Only boat ramps, public roads, public bridges, and walkways to water related facilities are allowed within 30 feet of the mean high water line if the project is intended to meet stormwater control requirements through density limits.) DEED RESTRICTIONS AND PROTECTIVE COVENANTS By my signature below, I certify that xhe recorded deed restrictions and protective covenants for this project shall limit the allowable built -upon area per lot to . N to , square feet inclusive of right-of-way, structures, pavement, walkways or patios of brick, stone, or slate, not including wood decking, state that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, and that benefits may be enforced by the State of North Carolina, therefore, the covenant cannot be changed or deleted without consent of the State. CERTIFICATION I, P°t af4SArLL certify that the information included on this submittal form is correct, that the project will be constructed in conformance with this information, and that to the best of my knowledge, the proposed project complies with the requirements of 15 NCAC 2H.1003 (b). I authorize the. below named person or firm to submit stormwater plans on my behalf,.and agree to abide by the deed restriction statement above. Owner's Signature Mack B. Pearsall, Pres. Date Provide authorized person or firm name and address below: m 46 OIL W 4-T S V I LtLv pt -v C � u M (-r ri ,allotaryPublicfortheStateof County of - , do hereby certify that - -� personally appeared befor ' me this, day of , 19, and acknowledges the due execution of the foregoing instrument. Witness my hand and official seal, My commission expires _ ,r —,3. " DIVISION OF ENVIRONMENTAL MANAGEMENT SIGN -OFF Regional Office l5 pov C/4- Date Date Evaluating Forms/Plans cc: Applicant/WiROBradley Bennett/Central Files Quality Supervisor Project # 941015 Date 28—Mar-95 Project Name HOLIDAY INN Reviewer ARL Drainage Basin ICWW Classification SC Site Area 179081 Square Feet 4.11 Acres Drainage Area 179081 Square Feet 4.11 Acres Impervious Area Calculation Buildings 36454 X 1.00 = 36454 square feet Parking/Asphalt 91290 X 0.95 = 86726 square feet Concrete 14995 X 0.90 = 13496 square feet Other (green) 36342 X 0.20 = 7268 square feet Total Impervious 142739 Total 143943 square feet Volume/Storage Calculation Required Required Volume To Store Pipe Diameter Length Of Pipe Length Of Trench Width Of Trench Height Of Trench Triangular Area Cross —Sectional Area Of Trench Storage In Piping Provided Available Volume To Store (Assuming 40% Voids) Elevation Of Bottom Of Trench (LOWEST) Elevation Of Seasonal High Water Table Exfiltration Rate / Drawdown Miminum Required Exfiltration rate Reported Hydraulic Conductivity (In/Hr) Bottom Surface Area Provided Exfiltration Rate Comments: 11995 Cubic Feet 1.00 Feet 901.00 Feet 901.00 Feet 8.00 Feet 3.00 Feet 9 Square feet 33.00 Square Feet 3 Cubic Feet (1604 gallons) 12321 Cubic Feet (1647 gallons) 2.50 Mean Sea Level 1.00 Mean Sea Level 768.0 GPH 0.52 Inches per Hour 7208.00 Square Feet 2336.4 GPH/SF Separation is less than 2', but water table cannot be determined at this location. Soil scientist recommends approval due to the ability of similar systems in the immediate area to function well. Drainage calculations for Holiday Inn, Wrightsville Beach, NC Project IE-4100 9124/94 Revised 3/17/96 A := 179081 •ft2 A = 4.111 -acre ...total area of site runoff:- 1 - in ...volume of runoff to be stoned VsR := runoff•A VsR = 14923 , ft3 ...volume of storage required based on 9" of runoff W : - G • ft ft ...trench width H 3.5 •f f4 ...trench depth d := 1-ft ft ...pipe diameter v : 0.4 ...assumed void ratio of stone pipe (d)' 2...cross-secional area of pipe Vs := Apia * �W II Apipe)•v+ 2•.5 II II v V s = 16.571 -ft? ...volume of storage available per foot of trench incl. side slopes .= VsR (V s) L = 901-ft ...length of trench required Analysis of drawdown time: K := 0.5h2f-in K = 1.204.10-5 - ...Assume minimun required time := VsR time = 47.8 -hr K•L•W ?E. . RE cElw MAR 1 3 1"S DEM PF'oj A