Loading...
HomeMy WebLinkAboutNCC215362_NOI Application_20210929Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 9/27/2021 11:47:04 AM (NCG01 NOI Submission) Approve by Broussard, Brooklyn C 9/28/2021 6:58:37 AM (Review- Construction NOI 66572) • The task was assigned to Broussard, Brooklyn C by round robin distribution 9/27/2021 11:47 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 29, 2021 5:00 PM 9/27/2021 11:47 AM Submit by Evans, Shaundra M 9/29/2021 7:58:38 AM (Payment Verification for NCC215362) * Peter McClintock • Evans, Shaundra M assigned the task to Evans, Shaundra M 9/29/2021 7:57 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: November 9, 2021 5:00 PM 9/28/2021 6:58 AM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting r No an NOI that was r Yes rejected before? Previous Rejected 66549 NOI No. Prior Reviewer Brooklyn Broussard Name 1a. Project Name * The Preserve Lot 452-K 1 b. Specific Lot This field rray be used to list specifc lot numbers. Numbers 1 c. Parcel ID List all R% associated w ith this project. Number(s) (PIN) 9784-00-30-2931 2. County* Chatham 3. Highway or Street 14 New Rhododendron Address* Street name only is acceptable if no address number assigned yet 4. CityorTownship* Chapel Hill 5. State * NC 6. Zip Code* 27517 7. Latitude* Enter the latitude in decimal degrees 35.7858 8. Longitude * Enter the longitude in decimal degrees (MJSTbe negative) -79.0565 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/11/2021 Estimated Construction Project Start late 10. Date to End * 06/30/2022 Estimated Construction Project End late 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Development 12. Acres to be 0.37 disturbed* (including off -site borrow and waste areas) 13. Total site area 0.45 (acres) * 14. Post- 0.15 construction (Estimated) impervious area (acres) * Project Tracking ID NCC-CHATH-2021-The Preserve Lot 452-K Assigned automatically (not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Beartree Creek Waterbody* %rreof waterbody into which stormwater runoff will discharge 15b. Waterbody 16-41-5-(1) Index No. * NCWaterbody Index Number Stormwater V No discharges will flow r Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Fbrnittee Inforrration - Legally Fbsponsible Entity and Individual ......................................................................................................................................................... Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Permittee * Legally Pesponsible Entity Peter McClintock It pernittee is an individual, enter first and last narre in this field. Otherwise, enter organization/business narre. Note: If the permittee is a business, the business must be registered with the NC Secretary of State. You can verify the registration here. 2. First Name * Peter IF Corporation, enter Faegistered Agent First %rre 3. Last Name* McClintock It Corporation, enter F;bgistered Agent Last %rre 3b. Title Owner 4. Permitee E-mail pjmcclin@gmail.com Address* 5. Permittee 9196026193 Telephone No.* 6. Permittee Mailing Street Address Address* 182 Sanctuary Way Apt 300 Address Line 2 City State / Frovince / Fbgion Pittsboro NC Fbstal / Zip Code Country 27312 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 182 Sanctuary Way Apt 300 Address Line 2 City State / Frovince / Faegion Pittsboro NC Fbstal / Zip Code Country 27312 us 8. Type of C wnership is only individual if an individual is named in B.1. above. Ownership* Individual C. Site Contact Information Part C. Roject Site Contact Inforrration .................................................................................................................................................................................................... 1. Primary Site Peter Contact - First Name * 2. Primary Site McClintock Contact - Last Name * 3. Title Onwer 4. Site Contact E- pjmcclin@gmail.com mail Address* 5. Site Contact 9196026193 Telephone No. 6. Organization Benchmark Construction Services, LLC Name 7. Site Contact Street Address Mailing Address* 182 Sanctuary Way Apt 300 Address Line 2 city Pittsboro Fbstal / Zip Code 27312 8. Consultant Name (Optional) First and Last nacre 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. 11. Billing E-mail (For Annual Fee correspondence) pjmcclin@gmail.com Default is legally responsible person e-rrail 12. Billing (For Annual Fee correspondence) Telephone 9196026193 Defauft is legally responsible person telephone State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/27/2021 Approved * 2. E&SC Plan Project WP-21-382 Number/ID * Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by* r Local Program 4. Local Program* Chatham County Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project (for linear projects, can include the beginning point and end point coordinates in the "Notes" box below). 5. E&SC Plan S&EC Letter of Approval 092721.pdf 128.74KB Approval letter or Mast beRDFformat Grading Permit 6. Signed FRO Financial Pesponsibility/Ojvnership Form FRO 090921.pdf 92.35KB Mast be FDFfornat 7. Site Location Map Mast be RDFforrrat (lirrit 20IVB) Site Plan 14_NewRhododendron.pdf 733.68KB Rease do not upload entire set of E&SC plans. 8. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded documents support the application. Include additional w aterbodies if necessary. 9. NOI Certification NOI Form 092721.pdf 72.13KB Form Mast be FDFfon-rat This is an Express F No Review Project* r Yes E. Certification North Carolina General Statute 143-215.66 (1) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Atide; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Atcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Amide or rules of the Commission implementing this Atcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit. I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * 17 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Legally Responsible Person named on this Notice of Intent f Authorized Responsible Person' (signing on behalf of Legally Responsible Person named in Part B) Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Peter McClintock Title Owner Organization Legally Ibsponsible Entity Peter McClintock Date * 09/27/2021 F. Tracking and COC Info NOI Tracking No. 66572 NC Reference No. NCG01-2021-5362 Uses 'count_nurrber' variable (increrrented by SP) Certificate of NCC215362 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 5362 Sequential nurrber for subrrittal that is incremented by Stored Frocedure COC Year 2021 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC215362-2021 Invoice Due Date 10/28/2021 Initial Fee $ 100.00 Invoice Status OPEN