Loading...
HomeMy WebLinkAbout20211335 Ver 1_Pre-Filing Acknowledgement Email_20210920Strickland, Bev From: laserfiche@ncdenr.gov Sent: Monday, September 20, 2021 10:45 AM To: Hining, Kevin J Cc: Wanucha, Dave Subject: Pre -Filing Meeting Request Acknowledgement - Ashe bridge 15 replacement - 20211335 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Ashe bridge 15 replacement that you submitted on (date). The ID number for that project is 20211335, Version 1. Reviewer Contact Information: Reviewer: David Wanucha Reviewer Email: dave.wanucha@ncdenr.gov Reviewing Office: Winston-Salem Regional Office - (336) 776-9800 When you submit your application please upload a copy of the attached document in this email. For internal use only: Transportation Project This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. i DWR Pre -Filing Meeting Request Form ID#* Regional Office* Reviewer List* 20211335 Version * 1 Winston-Salem Regional Office - (336) 776-9800 Dave Wanucha Pre -Filing Meeting Request submitted 9/8/2021 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: NCDOT Div 11 Kevin Hining kjhining@ncdot.gov Ashe bridge 15 replacement NCDOT Ashe Street Address 801 Statesville I-M/Y Address Line 2 City State / Rovince / Region North Wilkesboro NC Fbstal / Zip Code Country 28659 USA Is this a transportation project?* (' Yes r No Type(s) of approval sought from the DWR: fJ 401 Water Quality Certification - I— 401 Water Quality Certification - Regular Express I— Individual Permit I— Modification r Shoreline Stabilization Does this project have an existing project ID#?* r Yes (' No Do you know the name of the staff member you would like to request a meeting with? Dave Wanucha Please give a brief project description below and include location information. * Bridge replacement on existing alignment. Permit drawings are not complete yet. No prefiling meeting requested/needed, unless you would like to meet. Thanks! Kevin Please attach the documentation you would like to have the meeting about. Ashe 15 bridge replacement aerial map and study area.pdf Ashe 15 bridge replacement vicinity map.pdf 134.48KB pdf only 167.37KB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature `SY4:ify Submittal Date 9/8/2021