HomeMy WebLinkAboutSW8020223_Compliance Evaluation Inspection_20181113November 13, 2018
MEMORANDUM;
ROY COOPER
MICHAEL S. R.EGAN
BRAX.TON DAVIS
i3\� Gao z��
FROM: Courtney Spears, Assistant Major Permits Coordinator
NCDEQ - Division of Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405
Fax: 910-395-3964 (Courier 04-16-33) -
courtney.spearsP-ncdenr.gov
SUBJECT: CAMA Application Review
Applicant: JHP Holdings Co, (Hewett Marina)
Project Location: 1073 B-Var Road, SW, adjacent to the AIWW, in Supply, Brunswick County
Proposed Project: Maintenance dredging of an existing marina
Please indicate below your agency's position or viewpoint on the proposed project and
return this form to Courtney Spears at the address above by December 5, 2018. If you
have any questions regarding the proposed project, contact Tyler McGuire at (910) 796-7423
when appropriate, in-depth comments with supporting data is requested.
REPLY: This agency has no objection to the project as proposed.
"Additional comments may be attached"*
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes , PP
are incorporated. See attached. -De44- :S+&r-%6-JVAq-X �•-� rvs�e,,4--
� {�� la+' a�p ►�CtiT�w� CL,4 lrk "Cb v �4 alp �c� r r��cess�r a v C �
1 This agency objects to fhO project for reasorps described�.:s in Vetached comments.
PRINT NAME �R--� ,JeL_
AGENCY )m L k-?--
y
SIGNATURE
DATE I 1 1 (51 210IFj
State of North Carolina I Environmental Quality I Coastal Management
127 Cardinal Drive Ext., Wilmington, NC 28405 919 796 7215
I%A P— PiTrm A N
A!C�-T
&W1W6Trs t s
Mir. James H. Price
601 Aldeborough Lane
Charlotte, NC 28270
Dear Mr. Price:
t'-rIiC„aei P. Easim-y, Governor -
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
oaWilmington Regional Office
f rc - —
s>Iarz.l�t1�A :rE,o�✓l.
BuL"eAl RND �joUlfz.lnh
t415 r3u+c.DtN6�=
"-I s -r-k i q "rKc- = 51 o • f's4-Z • 33$1 -`ter (H) . .S y Z-7_3c! o_..
A L.LL.-D,a s^ y
E1102tkls
WD t)ATUM A N b kN bUr .
Subject: E
tormwaterProjectNo. SW8 020223�
Hewett Marine, LLC
runswick Coun
The VA%ilmington Regional Office received a copy of the CAMA Major Permit Application to replace
bulkhead, construct slips and dredge boat basin on February 27, 2002. Staff review of the plans and specifications
has determined that the development activities proposed at this time will not pose a threat to surface water quality
from stormwater runoff. The Director has determined that projects that are reviewed and approved by the Division
as not posing a water quality threat from stormwater runoff should not be subject to the stormwater management
permitting requirements of 15A NCAC 2H.1000. By copy of this letter, we are informing you that your project will
not require a stormwater management permit.
If the subject project disturbs eve acres or more and has a point source discharge of stormwater runoff, then it is also subject to the National Pollutant Discharge Elimination System (NPDES) stormwater discharge
requirements. you are required to have an NPDES p„�mit for stormwater discharge from projects meeting these
criteria. The stormwater rules require the Division to permit the common plan of development, therefore, any future
development on the property, regardless of whether a CAMA Major permit is also required, will require a
Stormwater Management permit application and permit issuance from the Division of Water Quality prior to any
construction.
If you have any questions or need additional information concerning, this matter, please contact Ms. Linda
Lewis at (910) 395-3900.
Sincerely,
Rick Shiver
Water Quality Re--ional Supervisor
RSSiarl: S:IWQSISTORMVVAnCANiA1020223.Feb
cc: �ai3ef�uss�I;DCM
Delaney Aycock Brunswick County Inspections
Dou; Huggett, DCM
Wilmington Regional Office
Central Files
N.C. Division of Water Quality 127 Cardinal Drive extension Wiim91 ON ington, N.C. 28405 30 � � MC�L�
+ ( � ' 39D0 Fax (9 , , D) ..SC-2DOC Customer Service
300-623-7748
OROF WA Michael F. Easley, Governor
y William G. Ross Jr., Secretary
r North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
April 10, 2003
Mr. James H. Price
601 Aldeborough Lane
Charlotte, NC 28270
Subject: Hewett Marina Exemption
Stormwater Project No. SW8 020223
Brunswick County
Dear Mr. Price:
The Division received a copy of the March 5, 2003, Notice of Violations of the
Sedimentation Pollution Control Act for failing to obtain an SEC permit for the construction
activities proposed at this site. No new construction activities other than the one previously
exempted by the Division is proposed, therefore, the original exemption issued to you on March
6, 2002, and it's conditions still apply.
If you have any questions regarding this matter, please do not hesitate to call me at (910)
395-3900.
Sincerely,
t
Linda Lewis
Environmental Engineer
RSS1:ar1 S:1WQSISTORMWATILETTERS1020223.apr03
cc: Elizabeth Nelson
Janet Russell, DCM
Delaney Aycock, Brunswick County Inspections
Doug Huggett, DCM
Linda Lewis
N. C. Division of Water Quality 127 Cardinal Drive Extension (910) 395-3900
Wilmington Regional Office Wilmington, NC 28405 (910) 350-2004 Fax
Customer Service
1 800 623-7748
c% tc%r-r wjt"%-rr- un%
IIN. 10 GA.
OP WIRE
MIN. 12-1/2GA.
_U
m
m
INTERMEDIATE WIRES 3'
U_
_
Iz
LU
MIN. 10 GA. BOTTOM WIRE
N
J
6" MIN. COMPACTED
--
u-
FILL OVER SKIRT*
--STEEL OR WOOD POST
-"--------WOVEN WIRE FENCING AS REQUIRED
SILT FILTER FABRIC
ANCHOR FABRIC SKIRT w/ MIN. 4"
LONG WIRE STAPLES @) 12" O.C_
*FOR REPAIR OF SILT FENCE FAILURES,
USE #57 WASHED STONE IN LIEU OF
COMPACTED FILL.
NOTES:
1. INSTALL NEW SILT FENCES AS SHOWN ON DRAWING AND AT LOCATIONS NECESSARY TO CONTROL SILTATION OF ADJACENT AREAS.
2. WHERE WOOD POSTS ARE USED, POSTS SHALL BE A MINIMUM OF 3" IN DIAMETER AND U IN LENGTH. POSTS SHALL BE CREOSOTE OR
PENTACHLOROPENOL TREATED SOUTHERN PINE.
3. WHERE STEEL POSTS ARE USED, POSTS SHALL BE 5' IN LENGTH AND BE OF THE SELF FASTENER ANGLE TYPE.
4. WOVEN WIRE FENCING, WHERE REQUIRED (SEE NOTE #6), SHALL CONFORM TO ASTM A116 FOR CLASS 3 GALVANIZING. FABRIC SHALL
BE A MINIMUM OF 32" WIDE AND HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. THE TOP AND BOTTOM WIRES SHALL BE
10 GAUGE AND INTERMEDIATE WIRES SHALL BE 12-1/2 GAUGE. WIRE FABRIC SHALL BE FASTENED TO WOOD POSTS WITH NOT LESS
THAN #9 STAPLES 1 1 /2" LONG.
5. FILTER FABRIC SHALL BE OF NYLON, POLYESTER, PROPYLENE OR ETHYLENE YARN WITH A MINIMUM STRENGTH OF 30 LB./LIN. IN. AND
A MINIMUM OF 85% FILTERING EFFICIENCY. FABRIC SHALL CONTAIN ULTRAVIOLET INHIBITORS AND STABILIZERS.
6. IF FABRIC FILTER IS USED WITH A STRENGTH OF 50 LB./LIN. IN. OR GREATER, AND THE POST SPACING (S) DOES NOT EXCEED 6, WOVEN
WIRE FENCING IS NOT REQUIRED. OTHERWISE, WOVEN WIRE FENCING IS REQUIRED, AND POST SPACING SHALL NOT EXCEED 8'.
TEMPORARY SILT FENCE
NOT TO SCALE
CONSTRUCTION SEQUENCE:
1. CONTRACTOR TO NOTIFY N.C. LAND QUALITY SECTION, REGIONAL OFFICE IN WILMINGTON, (910) 395-3900, PRIOR TO BEGINNING CONSTRUCTION.
2. INSTALL ANY SEDIMENT AND EROSION CONTROL MEASURES.
3. CONSTRUCT NEW CONCRETE SEAWALL-
4. STABILIZE ANY DISTURBED AREAS WITH PERMANENT GROUNDCOVER.
EROSION CONTROL NOTES:
1. ALL CONSTRUCTION ACTIVITIES SHALL BE PERFORMED IN COMPLIANCE WITH THE SEDIMENTATION POLLUTION CONTROL ACT OF 1973.
2. ALL LAND DISTURBING ACTIVITIES ARE TO BE PLANNED AND CONDUCTED SO AS TO LIMIT EXPOSURE OF BARE EARTH FOR THE SHORTEST POSSIBLE TIME.
3. ALL DISTURBED AREAS SHALL BE STABILIZED BY THE PLANTING AND ESTABLISHMENT OF PERMANENT AND UNIFORM GROUND COVER.
4. TEMPORARY CONSTRUCTION STAGING AREAS SHALL HAVE ADEQUATE SEDIMENT AND EROSION CONTROL MEASURES INSTALLED TO PREVENT OFF SITE
SEDIMENTATION, AND SHALL BE SEEDED AS NECESSARY TO BRING THE SITE BACK TO ITS NATURAL STATE UPON COMPLETION OF THE PROJECT.
5. SEDIMENT AND EROSION / TURBIDITY CONTROL MEASURES SHALL BE INSPECTED AFTER EACH HEAVY RAINFALL TO INSURE THEY ARE FUNCTIONAL
AND IN GOOD WORKING CONDITION. SEDIMENT DEPOSITION ACCUMULATION TO BE PERIODICALLY REMOVED TO MAIR'TAIN UNIT EFFECTIVENESS.
6. OVER THE DURATION OF THE PROJECT, THE OWNER SHALL MAKE PERIODIC AND UNSCHEDULED INSPECTIONS TO EVALUATE THE EFFECTIVENESS
OF ALL EROSION CONTROL MEASURES. IF EROSION OCCURS, THE OWNER SHALL NOTIFY THE CONTRACTOR TO TAKE ADEQUATE STEPS TO REMEDY
THE SITUATION.
7. CULVERTS, DITCH -LINES, OR RIP -RAP DISTURBED BY THIS CONSTRUCTION WILL BE REPLACED OR REPAIRED BY THE CONTRACTOR TO AN EQUAL
OR BETTER CONDITION TO THAT PRIOR TO DISTURBANCE.
soI4f
2" - 3" COARSE AGGREGATE
PLAN VIEW
50' MIN.
DIVERSION TO DIRECT RUNOFF FROM R/W
SECTION VIEW
TEMPORARY GRAVELED
CONSTRUCTION ENTRANCE
NOT TO SCALE
N8970
SEEDING SCHEDULE
ALL DISTURBED AREAS SHALL BE STABILIZED WITH A PERMANENT VEGETATIVE COVER. THE CONTRACTOR
MAY USE METHODS AND SCHEDULES SHOWN BELOW; HOWEVER, IT IS RECOMMENDED THAT THE
CONTRACTOR CONSULT A SPECIALIST WITH ATTENTION GIVEN TO SITE SPECIFIC CONDITIONS.
A. CULTIVATE AREA TO A DEPTH OF 5".
B. APPLY AGRICULTURAL LIME AT THE RATE OF 4000 LBS. PER ACRE.
C. APPLY 10-20-20 COMMERCIAL FERTILIZER AT THE RATE OF 500 LBS PER ACRE.
D. SOW GRASS SEEDS AT THE FOLLOWING RATES:
KIND RATE PER ACRE
COMMON BERMUDA GRASS (UNHULLED) 20 LBS.
COMMON BERMUDA GRASS (HULLED) 12 LBS.
PENSACOLA BAHIGRASS 50 LBS.
KOREAN LESPEDEZA 25 LBS
TALL FASCU E 30 LBS.
E. MULCH WITH STRAW AT THE RATE OF 3250 TO 4350 LBS PER ACRE.
F. ANCHOR STRAW WITH ASPHALT EMULSION TACK COAT APPLIED AT THE RATE
OF 300 GALLONS PER ACRE IN LOCATIONS AS AUTHORIZED BY THE ENGINEER.
i N897p6 0WE
SILT FENCE
STONE OUTLET
AREA OF DISTURBANCE = 0.51 AC
B-VAR ROAD SW (SR 1211)
1
\ ' SILT FENCE
STONE OUTLET
i
_—
NO GRADING TO OCCUR ON SITE ATLANTIC INTRACOAS
TAL, WATERWAY
` SILT FENCE
STONE OUTLET
i
SCALE: 1" = 50'
0 25 50 100 150
I n,
SILT FENCE STONE OUTLET
NOT TO SCALE
TEMPORARY SILT FENCE
SILT FENCE STONE OUTLET
Revisions
H--I
a
�
�
a
z
Q
�
o
�
x
C)
z
z
0
W
H
z
�
w
Q
H
Q
�
w
O
x
w
Date: 02 APR 03
Scale: As Shown
Drawn By: DBB
Checked By: ACL/DBB
THIS PLAN IS NOT ISSUED FOR
CONSTRUCTION WITHOUT
AFFIXED CORPORATE SEAL.
���,SEAL ` )
16 9
Gg+_,
This drawing shall not be reproduced in
whole or in part without written permission
of mast Coast P-ngineering Company, P.A.
Sheet I of I
ECEC PROJECT NO. 0538
Fax: 910.754.8049
Office: 910.754.8029
April2, 2003
East Coast
Engineering Company, P.A.
Consulting Engineers
N& Linda Lewis
Water Quality Section
NC Department of Environment and Natural Resources
127 Cardinal Drive Extension
Wilmington, North Carolina 28405-3845
Subject: Hewett Marina Dredging
SW Exemption 02-0223
Dear Ms. Lewis:
4918 Main Street
Post Office Box 2469
Shallotte, NC 28459
In May 2002, Hewett Marina received a CAMA Major Permit to replace the existing bulk head and to
dredge an area of the Atlantic Intracoastal Waterway (AIWW). In concurrence with obtaining this permit,
an exception was obtained from your office for the proposed work (SW 02-0223).
However, during the process of completing the dredging work, greater than one acre of the property has
been disturbed, and a Notice of Violation of the Sedimentation pollution Control Act was issued for the
project. In response, the owner retained our office to prepare a Sedimentation and Erosion Control Plan for
review and approval. Given that the scope of work has not been modified for this project, I presume that
the previously issued SW Exemption is still valid. A copy of the Sedimentation and Erosion Control Plan
has been enclosed for your reference.
If you have any question or require any additional information, please do not hesitate to contact our office.
Sincerely,
Elizabeth M. Nelson
Enclosures: Two sets of plans, Sheet 1 of 1
Copy: File: 0538 (Hewett Marina Dredging)
State of North Carolina
Department of Environment
and Natural Resources i1�
Wilmington Regional Office i�
Division of Land Resources/
Land Quality Section NCDENR
NORTH CARQI. INA DEPAF;rrMENT OF
William G. Ross Jr., Secrett Michael F. Easley, GOveir ENVIRONMENT AND NATURAL RESOURCES
ary
March 5, 2003 6
NOTICE OF VIOLATIONS OF THE
SEDIMENTATION POLLUTION CONTROL ACT
CERTIFIED MAIL 7002 2410 0006 9368 1054
RETURN RECEIPT REQUESTED
Mr. James Price
601 Aldeborough Lane
Charlotte NC 28270
Project Name: Hewett Marina Dredging
Project No: BR-03200
Brunswick County
Dear Mr. Price:
On February 27, 2003, personnel of this office inspected a project located on B-Var Road in Brunswick
County, North Carolina. This inspection was performed to determine compliance with the North Carolina
Sedimentation Pollution Control Act of 1973. The inspection revealed a land -disturbing activity of
approximately 1.2 acres being conducted.
It is our understanding that you and/or your firm are responsible for this land -disturbing activity. The
purpose of this letter is to inform you that this activity was found to be in violation of the Act, NCGS 113A-50
to 66, and Title 15A, North Carolina Administrative Code, Chapter 4. If you feel that you are not responsible
for the following violations, please notify this office immediately.
The violations that were found are:
1. Failure to file an erosion and sedimentation control plan with this office at least 30 days prior to
beginning a land -disturbing activity on a tract comprising more than one acre, when more than one acre
is to be uncovered, failure to secure this office's prior approval.of the plan for any land -disturbing
activity prior to beginning the land -disturbing activity. NCGS. 1 13A-54(d) (4), G. S. 113A-57(4) and
15A NCAC 413.0O07(c).
An erosion and sedimentation control plan has not been submitted to this office for the referenced
project.
An acceptable erosion and sedimentation control plan must be filed with and approved by this office
and implemented on the site sufficient to prevent off -site sedimentation. Until the required plan has
been approved, temporary measures must be provided immediately to control erosion and prevent
sedimentation damage. Any additional land -disturbing activities conducted without an approved erosion
and sedimentation control plan will constitute additional violations of the Act. We will notify you
following our review of the plan if additional measures are required.
127 Cardinal Drive Extension, Wilmington, N.C. 28405.3845 • Telephone 910.395.3900 • Fax 910-350.2004
An Equal Opportunity Affirmative Action Employer
Mr.James Price
March 5, 2003
Page Two
2. Failure to take all reasonable measures to protect all public and private property from damage by such
land -disturbing activities. 15A NCAC 413.0005.
Adequate measures to control erosion and retain sediment on site have not been provided. .Silt fence
has been installed as per CAMA requirements; however, additional measures will be necessary.
3. Failure to retain along a lake or natural watercourse a buffer zone of sufficient width to confine visible
siltation by natural or artificial means within the 25 percent of that portion of the buffer zone nearest
the land -disturbing activity. G.S. 113A-57(1).
Adequate buffers between watercourses/wetlands and land disturbing activities have not been
provided.
To correct these violations, you must:
1. Submit an erosion and sedimentation control plan to this office for the referenced project.
2. Install the measures, structures and/or devices necessary to control erosion and retain sediment
on site.
3. Restore buffers between watercourses/wetlands and land disturbing activities.
If the violations described in this Notice are not corrected within 30 days following your receipt of this
Notice, the Division of Land Resources may take additional appropriate legal action against you pursuant to
NCGS 113A-64. That action could be the assessment of additional civil penalties and may result in the
initiation of other remedies as prescribed by the Act. If additional civil penalties are assessed for the violations,
the amount may be up to $5,000.00 per day for each day of the violation pursuant to NCGS 133A-64(a)(1).
If all violations are corrected within the time period specified for compliance, additional civil penalties or legal
remedies will not be pursued.
Any new land -disturbing activity associated with this project should not begin until the area presently
disturbed is brought into compliance with the Act. When corrective actions are complete, you should notify
this office so that the work can be inspected. You should not assume that the site is in compliance with the
Act until we have so notified you. In addition, once compliance has been achieved, all installed measures must
be satisfactorily maintained until development is complete and the site -is fully stabilized to avoid further
violations of the Act.
We solicit your cooperation, and would like to avoid taking further enforcement action. At the same
time, it is your responsibility to understand and comply with the requirements of the Act. Copies of the
relevant statute and administrative rules may be examined at this office or will be sent to you upon request.
Should you have questions concerning this Notice or the requirements of the Act, please contact either Kevin.
Rowland or me at your earliest convenience,
Mr. James Price
March 5, 2003
Page Three
Please do not hesitate to contact me regarding any questions you might have about this matter.
Sincerely,
Daniel Sams, P.E., M.E.
Regional Engineer
DES//bfr
cc: Sedimentation Specialist
WiRO-LOS
ON Supervisor-WiRO
Enclosure: Inspection Report