HomeMy WebLinkAboutWQ0041298_Application (FTSE)_20210915•••*ea
NC Department of
ied
T I M M O N S GROUP _EnvironmentalQuality
YOUR VISION ACHIEVED THROUGH OURS.
TRANSMITTAL
SEP 1 5 2021
Winston-Salem
Regional Office
TO: Water Resources — Wastewater Permitting Date:09/08/2021 Job #: 42565
NCDEQ Winston-Salem Regional Office
4501 Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
Project: Shallowford
Reference:
Copies Sent To:
ENCLOSED PLEASE FIND:
WE ARE SENDING UNDER SEPARATE COVER: See below
COPIES
DATE
NUMBER
DESCRIPTION
1
$480 Application Fee
2
Set of Plans
1
FTA 04-21 Fast Track Sewer Extension Application Instructions
2
FTA 04-21 Fast Track Sewer Extension Application
2
FTSE 10-18 Flow Tracking Form
1
Street Map Exhibit
1
USGS Map Exhibit
1
Narrative
1
Previous Permit Approval
THESE ITEMS ARE TRANSMITTED:
If enclosures are not as noted, please notify us at once.
COMMENTS:
Attached is the extension permit application which is a revised application from a previous submittal. The
application will serve the Point at Elon subdivision, formally Shallowford Subdivision. We are proposing a
public wastewater collection system to serve forty-five (45) single family lots. The public mains will
discharge to the Town of Elon's public sanitary sewer system with 2 doghouse manholes. Please let me
know if you have any questions
SIGNED:
8642 W. Market Street I Greensboro, NC 27409
E
0
l=
E
E
FAX 336.662.0420
TEL 336.662.0411
0
z
a
z
01
cn
0
Site Development I Residential I Infrastructure
Rick Ringler, Senior Project Manager
R
Division of Water Resources
State of North Carolina
Department of Environmental Quality
Division of Water Resources
FAST TRACK SEWER SYSTEM EXTENSION APPLICATION
FTA 06-21 & SUPPORTING DOCUMENTATION
Application Number: (to be completed by DWR)
All items must be completed or the application will be returned
I. APPLICANT INFORMATION:
1. Applicant's name: Town of Elon (company, municipality, HOA, utility, etc.)
2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility
❑ Federal ❑ State/County ® Municipal ❑ Other
3. Signature authority's name: Richard Roedner per 15A NCAC 02T .0106(b)
Title: Town Manager
4. Applicant's mailing address: 104 S. Williamson Ave.
City: Elon State: NC Zip: 27244-
5. Applicant's contact information:
Phone number: (336) 584-3601 Email Address: rroedner(a)elon.gov
II. PROJECT INFORMATION:
I. Project name: The Point at Elon
2. Application/Project status:
❑ Proposed (New Permit) ® Existing Permit/Project
If a modification, provide the existing permit number: WQ004139 and issued date: January 28 2020,
For modifications, also attach a detailed narrative description as described in Item G of the checklist.
If new construction, but part of a master plan, provide the existing permit number: W000
3. County where project is located: Alamance
4. Approximate Coordinates (Decimal Degrees): Latitude: 36.1155° Longitude:-79.5043°
5. Parcel ID (if applicable): (or Parcel ID to closest downstream sewer)
III. CONSULTANT INFORMATION:
1. Professional Engineer: Richard Ringler License Number: 48383
Firm: Timmons Group
Mailing address: 8642 W Market Street, Suite 136
City: Greensboro State: NC Zip: 27409-
Phone number: (336) 478-3353 Email Address: rick.ringlera,timmons.com
IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION:
I. Facility Name: Burlington East Plant Permit Number: NC0023868
Owner Name: City of Burlington
V. RECEIVING DOWNSTREAM SEWER INFORMATION:
1. PermitNumber(s): WQ_
2. Downstream (Receiving) Sewer Information: 10 inch ® Gravity ❑ Force Main
3. System Wide Collection System Permit Number(s) (if applicable): WQCS00226
Owner Name(s): Town of Elon
FORM: FTA 06-21
Page 1 of 5
VI. GENERAL REQUIREMENTS
1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached?
❑ Yes ❑ No ® N/A
2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV ) been attached?
❑ Yes ❑ No ®N/A
3. If the Applicant is a Home/Property Owners' Association, has an HOAlPOA Onerational Aureement {FORM: HOA 1 and
supplementary documentation as required by I5A NCAC 02T.01 15(c) been attached?
❑ Yes ❑ No Z N/A
4. Origin of wastewater: (check all that apply):
® Residential (Individually Owned)
❑ Residential (Leased)
❑ School / preschool / day care
❑ Food and drink facilities
❑ Businesses / offices / factories
❑ Retail (stores, centers, malls)
❑ Retail with food preparation/service
❑ Medical / dental / veterinary facilities
❑ Church
❑ Nursing Home
❑ Car Wash
❑ Hotel and/or Motels
❑ Swimming Pool/Clubhouse
❑ Swimming Pool/Filter Backwash
❑ Other (Explain in Attachment)
5. Nature of wastewater : 100 % Domestic % Commercial % Industrial (See 15t\. NCAC 02T .0103(20))
If Industrial, is there a Pretreatment Program in effect? 0 Yes ❑ No
6. Has a flow reduction been approved under ISA NCAC O2T .0114t )? ❑ Yes 0 No
➢ If yes, provide a copy of flow reduction approval letter with this application
7. Summarize wastewater generated by project:
Establishment Type (see 02T.0114(f))
Daily Design Flow a,b
No. of Units
Flow
4 - Bedroom Unit
480 gal/Unit
20
9,600 GPD
3-Bedroom Unit
360 gal/Unit
25
9,000 GPD
gal/
GPD
gal/
GPD
gal/
GPD
gal/
GPD
Total
18,600 GPD
a See 15A NCAC 02T .0114(b), (d), (e)(l) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per
dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas;
and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined
in G.S. 42A- 4J.
b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be
determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data.
8. Wastewater generated by project: 18,600 GPD (per 15A NCAC 02T .0114)
➢ Do not include future flows or previously permitted allocations
If permitted flow is zero, please indicate why:
❑ Pump Station/Force Main or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line.
Please provide supplementary information indicating the approximate timeframe for permitting upstream sewers with flow.
❑ Flow has already been allocated in Permit Number: Issuance Date:
❑ Rehabilitation or replacement of existing sewers with no new flow expected
❑ Other (Explain):
FORM: FTA 06-21
Page 2 of 5
Vll. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers t:
l Summarize gravity sewer to be permitted:
Size (inches)
Material
2288 DIP
➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information rela ed to design criteria
➢ Section III contains information related to minimum slopes for gravity sewer(s)
➢ Oversizing lines to meet minimum slope requirements is not allowed and a violation of the MDC
VQ[. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains):
PROVIDE A SEPARATE COPY OF THIS PAGE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT
I. Pump station number or name:
2. Approximate Coordinates (Decimal Degrees): Latitude: . - Longitude: - .
3. Total number of pumps at the pump station:
3. Design flow of the pump station: millions gallons per day (firm capacity)
➢ This should reflect the total GPM for the pump station with the largest pump out of service.
4. Operational point(s) per pump(s):
gallons per minute (GPM) at feet total dynamic head (TDH)
5. Summarize the force main to be permitted (for this Pump Station):
If any portion of the force main is less than 4-inches in diameter, please identify the me hod of solids reduction per
MDCPSFM Section 2.OIC. t.b. ❑ Grinder Pump ❑ Mechanical Bar Screen 0 Other (please specify)
6. Power reliability in accordance with 15A NCAC O2T _0305i 11(11:
❑ Standby power source or 0 Standby pump
➢ Must have automatic activation and telemetry - 15A NCAC 02T.0305(h)(1)(B);
➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day
➢ Must be permanent to facility and may not be portable
Or if the pump station has an average daily flow less than 15,000 gallons per day 15A NCACO2T.0305(h)(1)(C):
❑ Portable power source with manual activation, quick -connection receptacle and telemetry -
or
❑ Portable pumping unit with plugged emergency pump connection and telemetry:
• Include documentation that the portable source is owned or contracted by the applicant and is compatible with the station.
➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage
capacities and the rotation schedule of the portable power source or pump, including travel timefrarnes, shall be provided
as part of this permit application in the case of a multiple station power outage.
FORM: FTA 06-21 Page 3 of 5
IX. SETBACKS & SEPARATIONS — (02B .0200 & ISA NCAC 02T .0305(f)):
1. Does the project comply with all separations/alternatives found in 15A NCAC 02T .0305(0 & (r,)? ❑ Yes IZI No
I SA NCAC 02T 0305(Il contains minimum separations that shall be provided for sewer systems:
Setback Parameter*
Separation Required
Storm sewers and other utilities not listed below (vertical)
18 inches
'Water mains (vertical - water over sewer preferred, including in benched trenches)
18 inches
2Water mains (horizontal)
10 feet
Reclaimed water lines (vertical - reclaimed over sewer)
18 inches
Reclaimed water lines (horizontal - reclaimed over sewer)
2 feet
**Any private or public water supply source, including any wells, WS-I waters of Class I or
Class II impounded reservoirs used as a source of drinking water, and associated wetlands.
100 feet
**Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal
high water (or tide elevation) and wetlands associated with these waters (see item IX.2)
50 feet
**Any other stream, lake, impoundment, or ground water lowering and surface drainage
ditches, as well as wetlands associated with these waters or classified as WL.
10 feet
Any building foundation (horizontal)
5 feet
Any basement (horizontal)
10 feet
Top slope of embankment or cuts of 2 feet or more vertical height
10 feet
Drainage systems and interceptor drains
5 feet
Any swimming pools
10 feet
Final earth grade (vertical)
36 inches
> If noncompliance with 02T.0305(f) or (g) see Section X.1 of this application
*15A NCAC 02T 0305(g) contains altematives where separations in 02T.0305(f) cannot be achieved. Please check "yes"
above if these alternatives are used and provide narrative information to explain.
**Stream classifications can be identified using the Division's NC Surface Water Classifications webpatre
2. Does this project comply with the minimum separation requirements for water mains? ® Yes 0 No ❑ N/A
Si: If no, please refer to 15A NCAC 18C.0906(f) for documentation requirements and submit a separate document,
signed/sealed by an NC licensed PE, verifying the criteria outlined in that Rule.
3. Does the project comply with separation requirements for wetlands? 0 Yes ® No 0 N/A
> Please provide supplementary information identifying the areas of non-conformance.
> See the Division's draft separation requirements for situations where separation cannot be met.
> No variance is required if the alternative design criteria specified is utilized in design and construction.
4. Is the project located in a river basin subject to any State buffer rules? 0 Yes Basin name: /1 No
If yes, does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ❑ Yes ❑ No
> This includes Trout Buffered Streams per 15A NCAC 2B.0202
5. Does the project require coverage/authorization under a 404 Nationwide/individual permits IZI Yes ❑ No
or 401 Water Quality Certifications?
> Please provide the permit number/permitting status in the cover letter if coverage/authorization is required.
6. Does project comply with 15A NCAC 02T.0105(06) (additional permits/certifications)? ❑ Yes ® No
Per ISA NCAC 02T.0105tc )(6), directly related environmental permits or certification applications must be being prepared,
have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion
and sedimentation control plans, stormwater management plans, etc.).
7. Does this project include any sewer collection lines that are deemed "high -priority?" ® Yes 0 No
Per 15A NCAC 02T.0402, "high -priority sewer" means any aerial sewer, sewer contacting surface waters,
siphon, or sewers positioned parallel to streambanks that are subject to erosion that undermines or deteriorates the sewer.
Siphons and sewers suspended through interference/conflict boxes require a variance approval.
> If yes, include an attachment with details for each line, including type (aerial line, size, material, and location).
High priority lines shall be inspected by the permittee or its representative at least once every six -months and
inspections documented per 15A NCAC 02T.0403(a)(5) or the permittee's individual System -Wide Collection permit.
FORM: FTA 06-21 Page 4 of 5
X. CERTIFICATIONS:
1. Does the submitted system comply with 15A NCAC 02T the Minimum Design Criteria for the Permittinu of Pump Stations
and Force Mains tlatest version)_ and the Gravity Sewer Minimum Design Criteria (latest version) as applicable?
® Yes ❑ No
If no, for projects requiring a single variance, complete and submit the Variance/Alternative Design Request application
(VADC 10-14) and supporting documents for review to the Central Office. Approval of the request will be issued
concurrently with the approval of the permit, and projects requiring a variance approval may be subject to longer
review times. For projects requiring two or more variances or where the variance is determined by the Division to be a
significant portion of the project, the full technical review is required.
2. Professional Engineer's Certification:
I, Richard Ringler , attest that this application for The Point at Elon
(Professional Engineer's name from Application Item 111.1.) (Project Name from Application Item 11.1)
has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans,
specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further
attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations,
Minimum Desi_.n Criteria for Gravity Sewers (latest version) and the Minimum Design Criteria for the Fast -Track Permitting
of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this
submittal package, inclusion of these materials under my signature and seal signifies that 1 have reviewed this material and
have judged it to be consistent with the proposed design.
NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. Misrepresentation of the application
information, including failure to disclose any design non-compliance with the applicable Rules and design criteria, may subject
the North Carolina -licensed Professional Engineer to referral to the licensing board. (21 NCAC 56.0701)
North Carolina Professional Engineer's seal, signature, and date:
3. Applicant's Certification per 15A NCAC 02T .0106(b):
I, Richard Roedner , attest that this application for
(Signature Authority Name from Application Item 1.3.) (Project Name from Application Item 11.1)
attest that this application has been reviewed by me and is accurate and complete to the best of my knowledge.
I understand that if all required parts of this application are not completed and that if all required supporting documentation
and attachments are not included, this application package is subject to being returned as incomplete. I understand that any
discharge of wastewater from this non -discharge system to surface waters or the land will result in an immediate enforcement
action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division
of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application
package are not completed and that if all required supporting information and attachments are not included, this application
package will be returned to me as incomplete.
NOTE — In accordance with General Statutes 143-222,(5.,bA and 143-215.6B, any person who knowingly makes any false
statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may
include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation.
The Point at Elon
Signature:
FORM: FTA 06-21
Date: g
3, /2U z 1
Page 5 of 5
State of North Carolina
Department of Environment and Natural Resources
Division of Water Resources
Flow Tracking/Acceptance for Sewer Extension Permit Applications
(FTSE 10-18)
Enity Requesting Allocation City of Burlington
Project Name for which flow is being requested: Shallowford Phase 1 and 2
More than one h 1 SE-IO/07 may be required for a single project if the owner of the PVWTP is not responsible for all pump stations
along the route of the proposed wastewater flow.
1. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: East Burlington WWTP
b. WWTP Facility Pennit #: NC 0023868
All flows are in GPD
c. WWTP facility's permitted flow 12,000,000
d. Estimated obligated flow not yet tributary to the WWTP 1,950,633
e. WWTP facility's actual avg. flow 5,302,000
f Total flow for this specific request (18,600) Elon Allocation 0
g. Total actual and obligated flows to the facility 7,252,633
h. Percent of permitted flow used 60.4%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP . None
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Obligated, Total
Design Approx. Not Yet Current Flow
Firm Average Daily Current Avg. Tributary Plus
Pump Station Capacity,* Flow' Daily Flow, Daily Flow, Obligated Available
Name GPD (Firm/pf), GPD GPD GPD Flow Capacity***
Dry Creek 4,000,000 1,600,000 582,428 0 582,428 1,017,572
* The Firm Capacity of any pump station is defined as the maximum pumped flow that can be
achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pumpstation divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity s 0.
Downstream Facility Name (Sewer) : Dry Creek Interceptor
Downstream Permit Number: Not Known
Page 1 of 2 FTSE 10-18
Certification Statement:
1, W. Todd Lambert, P.E. certify to the best of my knowledge that the addition of the
volume of wastewater to be permitted in this project has been evaluated along the route to the receiving
wastewater treatment facility and that the flow from this project is not anticipated to cause any
capacity related sanitary sewer overflows or overburden any downstream pump station en route to the
receiving treatment plant under normal circumstances, given the implementation of the planned
improvements identified in the planning asssessment where applicable. This analysis has been
performed in accordance with local established policies and procedures using the best available data.
This certification applies to those items listed above in Sections I and 1I plus all attached planning
assessment addendums for which I am the responsible party. Signature of this fonn certifies that the
receiving collection system or treatment works has adequate capacity to transport and treat the proposed new
wastewater.
Signing Official Signature
City Engineer
Tide of Signing Official
mica/I`�
Date
Page 2 of 2 FTSE 10-18
Se1071.42585-Shallowford_HomestDocsk&Permittin9\NCOECPStreet Map Exhibit dwg 1 Plotted on 8/17/2021 11:17 AM; by Hannah Hams
0
N
0
O
O
D
r—
rn
1i
0
O
0
NAD 83
V/
m
TIMMONS GROUP ^••':"•
YOUR VISION ACHIEVE/THROUGHOLRS.
MIS OMMIMIFILESIRED AT TP4
FFICe
wzN. Meina:N Swe n 1 Aslue. ti<lNM
THE POINT AT ELON
TOWN OF ELON• NORTH CAROLINA
STREET MAP EXHIBIT
and .ey (MI MID
rms wApen mnHM d 111/MONS GROUP.
DATE
REVISION OESCarION
S: 107N2565-ShellawfordHomes1Docsl6-PermelingINCDEQIUSGS Map Exhibif.dwg I Platted on 8/17/2021 11:18 AM I by Hannah Hams
TIMMONS GROUP .•'7•••
SION ACM,EVEO M[OLYNOURt
MIS DDANDE AIDIE
m °p®ee++.xc�iw5
IimN am
THE POINT AT ELON
TOWN OF EION•NORTH CAROLINA
USGS Map Exhibit
awvm ate the artluure pmpoM or100WS GROUP and may ml bemutodueel nwM.r in psn ana shall iwlb+ u.ed!r any so wlmtwo
wCDon ,Ylieq I.MMNa mews writtenoOowtlnl TIMMONS GROUP.
ION OPSCWPIO.
WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT NARRATIVE
A permit for this project was previously approved, Permit No. W00041298 dated November 13, 2019 for
the construction of 2,375 linear feet of 8-inch gravity sewer to serve 20 four -bedroom and 25 three -
bedroom homes as part of the Shallowford project, and the discharge of 18,600 gallons per day of
collected domestic wastewater into the Town of Elon's and the City of Burlington's existing sewerage
system.
The previous approved plans required a street realignment to comply with a revised 401/404 permit.
The revised street alignment required the sanitary sewer line to be rerouted and a second point of
connection into the town of Elon's system was required. The new point of connection required the
sewer line to be installed across a wetland area with an aerial sewer crossing over an existing stream.
The rerouting of the sewer line also required a crossing over a proposed storm drain line that did not
meet the separation requirements. The crossing is shown on Sheet C-606 of the improvement plans.
Since the separation requirements could not be met, both the sewer main and storm drain line were
designed using Ductile Iran Pipe with special bedding and backfill consisting of flowable fill.
The total flow from the project, the pipeline that the proposed sewer mains are connected, and the
treatment facilities has not changed from the previously approved permit. In general, the location of
the sewer pipelines in the streets also have not changed other than the new point of connection.
We are proposing a public wastewater collection system to serve forty-five (45) single family
lots. The public mains will discharge to the Town of Elon's public sanitary sewer system with two
connections. Both connections will be accomplished with a doghouse manhole.