Loading...
HomeMy WebLinkAboutNCG140119_DMR_20200730 (1)STORMWATER DISCHARGE OUTFALL (SDO) - Semi -Annual MONITORING FORM GENERAL PERMIT NO. NCG140000 CERTIFICATE OF COVERAGE NO. NCG 14 O 119 FACILITY NAME: Chandler Concrete Piedmont - Salisbury #114 PERSON COLLECTING SAMPLES: _ CERTIFIED LABORATORY:Pace Analytical Lab #633 OPTIONAL INFO: PartA: Stormwater Monitoring Requirements Ong - State SAMPLE COLLECTION YEAR: 2020 0 Copy -State SAMPLING PERIOD: ❑July -December ®January -June 0 Copy -Plant COUNTY Rowan 0 Copy -File PHONE NO.(3366) 226.1182 ADD TO USTSERVE? DYES ®NO EMAIL: _ DISCHARGING TO CLASS: ❑SA ❑HQW ❑PNA ❑Trout ®Other: WS-V B Date Sample Collected pH TSS Total In Tier 2 go f Mont sin Outfall No. (mm/dd/yrOR (Standard Units) (mg/L) Rainfall' Monthly Monitoring? Tier NO FLOW)' (in) (y/n) Sampling - - 61 10011 - - - 1 NQD N N/A NQD-No Qualified Discharge - 1 If wastewater systems have not discharged in this quarter- report "No Flow" or"No Discharge" here. Please make sure to mark the sample quarter above. 2 Reportthe abbreviation for the type of Authorized Wastewater Discharges here: Vehicle and Equipment Cleaning(VE), Raw Material Stockpiles(RM), Mixing Drum Cleanout(MD). Report more than one type if the waste -stream is commingled. 3 if an effluent limit is exceeded twice In a row, the permittee is required to institute monthly monitoringfor that parameter for six months, unless DEMLR RO staff notifies you to continue monitoring. 4 pH limits are 6-9 S.U. for wastewater discharges to freshwaters, and 6.8-8.5 S.U. for discharges to saltwater 5 TSS limits are 20 mg/L for wastewater discharges to HOW waters, 10 mg/L for Trout and PNA waters, and 30 ri for all other water classifications. 6 Process wastewater discha tees shall only be monitored for TPH when commingled with stormwater discharges from VMA areas. TPH does not have a limit for wastewater, but instead is subject to benchmarks and provisions of Part IV, Section A, including the Tiered Response Action. 7 Flow rate can be measured continuously or calculated. Flow limits for wastewater discharges to HOW waters shall be set to 50% of the Summer 7010 Flow as per 15A NCAC 02B.0224.Permittees who discharge wastewater to HOW waters shall obtain a Summer 7010 flow and report this information to DEMLR. if the permittee cannot obtain a Summer 7Q10 flow for receiving waters at discharge location, the permittee shall notify DEMLR, and the DEMLR Regional Office may require an annual flow report on acase-by-case basis. Permit Date: 8/1/2017-06/30/2022 Last Revised 07/27/17 Page 1 of 2 AUG 10 2020 CEN-TW', Fir "-S DV'WR SEC ICN Part B: Vehicle Maintenance Activity Monitoring Requirements for facilities using> 55 gal of new motor oil/month— averaged over a calendar year. Non -Polar Oil & Outfall Date Sample pH Grease using Total Suspended Event Total New Motor Oil Monthl n Tier 2 # of Months in (Standard method Solids Duration Rainfallc Usage Tier No. Collected Units) 16645GT--HEM (ma) (minutes) (in) (gal/month) Monitoring? Sampling° (mo/dd/yr)' (mg/L) (y/n) 6-97 15' i HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES AT ANY ONE OUTFALL (INCLUDING VEHICLE MAINTENANCE)? YES ❑ NO HAVE YOU CONTACTED THE REGION? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mai Original and one copy of this DIM (including all "No Flow" & "No Discharge" reports) within 30 days of receipt of sample (or at end of monitoring Period in case of "No Flow") to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there:;W7 false information, Including the possibility of fines and imprisonment for knowing violations." _ 30 (Sign ure of Permittee) ( te) Permit Date: 8/1/2017- 6/30/2022 Last Revised 7/27/18 Page 2 of 2 Commented (KW11: