HomeMy WebLinkAbout20211213 Ver 1_Approval Letter_20210927 DocuSign Envelope ID:5E29C93D-7C26-4B61-92A5-AB4641 EB65D8 ROY COOPER �, o Governor — 24, ELIZABETH S.BISER A * i 12 SP. * ..= Secretary 45` rrko_= S. DANIEL SMITH NORTH CAROLINA Director Environmental Quality September 27, 2021 DWR#20211213 Pitt County Mr. Lynn Raynor, P.E. City of Greenville 1500 Beatty Street Greenville, NC 27834 Subject: APPROVAL of TAR-PAMLICO RIPARIAN BUFFER IMPACTS WITH ADDITIONAL CONDITIONS TASC BUILD Grant, Project G,TIP# EB-6043, Pitt County Dear Mr. Raynor: You have our approval for the impacts listed below for the purpose described in your application dated August 5, 2021, received by the Division of Water Resources (Division) August 5, 2021. These impacts are covered by the Tar-Pamlico Buffer Rules and the conditions listed below. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The following impacts are hereby approved, provided that all of the Conditions listed below and all of the conditions of the Tar-Pamlico Buffer Rules [15A NCAC 02B .0734] are met. No other impacts are approved, including incidental impacts. Site Buffer Zone 1 (sq ft) Buffer Zone 2 (sq ft) 1-Temporary -- 542 1- Permanent -- 1,298 2-Temporary 103 157 2- Permanent 4 539 3-Temporary 2,072 667 3- Permanent 1,978 7,309 4-Temporary -- 445 4- Permanent 1,083 2,280 5-Temporary -- -- 5 - Permanent -- 56 Total 5,240 13,293 Net Total 18,533 D —,- Noh np of Environmental Quality Wt Rerces 1" Sl2 NorthrtCaroli SalisburyaDe Streetartment 1617 Mvirailn Service Center Raleigh,Division Northofa Carolina ersou27699 1617 NORTH CAROL]NA Department of ErNIronmenlal owniv 919.707.9000 DocuSign Envelope ID:5E29C93D-7C26-4B61-92A5-AB4641 EB65D8 DWR#20211213 Buffer Authorization Certificate Page 2 of 4 This approval is for the purpose and design described in your application.The plans and specifications for this project are incorporated by reference as part of this Authorization Certificate. If you change your project,you must notify the Division and you may be required to submit a new application package. If the property is sold,the new owner must be given a copy of this Authorization Certificate and is responsible for complying with all conditions. [15A NCAC 02B .0734] If you are unable to comply with any of the conditions below,you must notify the Washington Regional Office within 24 hours (or the next business day if a weekend or holiday)from the time the permittee becomes aware of the circumstances. The permittee shall report to the Washington Regional Office Regional Office any noncompliance with the conditions of this Authorization Certificate and/or any violation of state regulated riparian buffer rules [15A NCAC 02B .0734]. Information shall be provided orally within 24 hours(or the next business day if a weekend or holiday) from the time the applicant became aware of the circumstances. Additional Conditions: 1. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc 2. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval.[15A NCAC 02H.0507(c)and 15A NCAC 02H .0506(b)(2)and(c)(2)] 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] 5. When applicable, all construction activities shall be performed and maintained in full compliance with G.S. Chapter 113A Article 4 (Sediment and Pollution Control Act of 1973). Regardless of applicability of the Sediment and Pollution Control Act, all projects shall incorporate appropriate Best Management Practices for the control of sediment and erosion so that no violations of state water quality standards, statutes, or rules occur. [15A NCAC 02H .0506{b)(3) and (c)(3) and 15A NCAC 02B.0200] 6. Sediment and erosion control measures shall not be placed in wetlands or surface waters or within 5 feet of the top of bank without prior approval from DWR. [15A NCAC 02H.0506(b)(3) and (c)(3)] DocuSign Envelope ID:5E29C93D-7C26-4B61-92A5-AB4641 EB65D8 DWR#20211213 Buffer Authorization Certificate Page 3 of 4 7. Erosion control matting in riparian areas shall not contain a plastic or nylon mesh grid which can impinge and entrap small animals. Matting should be secured in place by staples, stakes, or wherever possible live stakes of native trees. [15A NCAC 02B.0201] 8. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, then design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands, stream beds, or banks, adjacent to or upstream and downstream of the above structures. All sediment and erosion control devices shall be removed from wetlands and waters and the natural grade restored within two (2) months of the date that the project was completed and stabilized. [15A NCAC 02H.0506(b)(3) and (c)(3)] 9. Pursuant to 15A NCAC 2B .0734(11), all riparian buffers impacted by temporary fill or clearing activities or temporary sediment and erosion control devices shall be restored to preconstruction topographic and hydrologic conditions and replanted with comparable vegetation within two months of when construction is complete. 10. Stormwater runoff into the riparian buffer shall meet dispersed flow as defined in 15A NCAC 02H .1002 except as otherwise described in 15A NCAC 2B .0734(9). 11. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. [15A NCAC 02H.0506(b)(3)] 12. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance,the NCDWR may reevaluate and modify this certification. [15A NCAC 02B.0200] 13. The Permittee shall report any violations of this approval to the Division of Water Resources within 24 hours of discovery. [15A NCAC 02B.0506(b)(2)] 14. Upon completion of the project,the applicant shall complete the"Certification of Completion Form" to notify the NCDWR when all work included in the Buffer Authorization has been completed. [15A NCAC 02H.0502(f)] 15. A copy of this Approval shall be maintained on the construction site at all times. In addition, the Approval and all subsequent modifications, if any, shall be maintained with the on-site project manager. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] DocuSign Envelope ID:5E29C93D-7C26-4B61-92A5-AB4641 EB65D8 DWR#20211213 Buffer Authorization Certificate Page 4 of 4 This approval and its conditions are final and binding unless contested. [G.S. 143-215.5] This Authorization Certificate can be contested as provided in Chapter 150B of the North Carolina General Statutes by filing a Petition for a Contested Case Hearing (Petition) with the North Carolina Office of Administrative Hearings (OAH) within sixty(60) calendar days. Requirements for filing a Petition are set forth in Chapter 150B of the North Carolina General Statutes and Title 26 of the North Carolina Administrative Code. Additional information regarding requirements for filing a Petition and Petition forms may be accessed at http://www.ncoah.com/or by calling the OAH Clerk's Office at(919)431-3000. One (1) copy of the Petition must also be served to the North Carolina Department of Environmental Quality: William F. Lane, General Counsel Department of Environmental Quality 1601 Mail Service Center Raleigh, NC 27699-1601 This Authorization shall expire five (5)years from the date of this letter. This letter completes the review of the Division under the Tar-Pamlico Riparian Buffer Rules as described in 15A NCAC 02B .0734. Please contact Garcy Ward at 252-948-3917 or garcy.ward@ncdenr.gov if you have any questions or concerns. Sincerely, DocuSigned by: nO-VY1, pPlitikk, 9?2PTaff)474... S. VQIIICI Jllllll 1 VII CCTV I• Division of Water Resources cc: Lynn Raynor, P.E., City of Greenville, Traynor@greenvillenc.gov Emily Thompson, USACE, Washington Field Office Emma Radford, Kimley-horn, Emma.Radford @kimley-horn.com DWR Transportation 401 & Buffer Permitting Branch electronic file