Loading...
HomeMy WebLinkAboutNCC201209_NOT Closeout Documents_20210920Division of Energy, Mineral and Land Resources County: Franklin Project: Holden Creek Preserve Phase 5 -Various Lots Person financially responsible: Taylor Morrison Attn: Sarah Larson, VP Finance Address: 15501 Weston Parkway, Suite 100, Cary, NC 27513 1. Project location: Holden Road, Youngsville Pictures: No: ❑x Yes: ❑ Video: ❑ Digital: ❑ 2. Weather and soil conditions: Sunny, wet, workable 3.a. Has NCGO1 Certificate of Coverage been issued at time of inspection? Yes: ❑x 3.b. NCGO1 Certificate of Coverage on site? Yes: ❑x No: ❑ Not Applicable: ❑ 4. Is site currently under notice of violation? Yes: ❑ No: ❑x River basin: Neuse Project # FRANK-2020-021 Case # First inspection: Yes: ❑ No: ❑X No: ❑ 5. Is the site in compliance with S.P.C.A. and rules? Yes: ❑x No: ❑ If no, check violations below. 6. Violations: ❑ a. No approved plan, G.S. 113A-57 (4) and 15A N.C.A.0 413.0107(c) ❑ b. Failure to follow approved plan, G.S. 113A-57(5) ❑ c. Failure to submit revised plan, G.S. 113A-54.1(b) and 15A N.C.A.C. 413.0118(a) ❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3) and 15A N.C.A.C. 4B.0107(b) ❑ e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) ❑ f. Failure to take measures to protect property, 15N.C.A.C. 413.0105 ❑ g. Inadequate buffer zone, G.S. 113A-57(1) ❑ h. Graded slopes and fills too steep, G.S. 113A-57(2) or 15A N.C.A.C. 4B.0124(e) ❑ i. Unprotected exposed slopes, G.S. 113A-57(2) ❑ j. Failure to install and maintain measures, 15A N.C.A.C. 413.0113 ❑ k. Failure to self -inspect G.S. 113A-54.1(e) and 15A N.C.A.C. 413.0131 ❑ 1. Other (describe) 7. Is the site in compliance with NPDES Permit NCG 010000? Yes: 0 No: ❑ Not Applicable: ❑ If no, check violations below. ❑ m. Discharge without a permit, G.S. 143-215.1(a) and 15A N.C.A.C. 02H .0126 ❑ n. Failure to develop or adhere to approved plan, NCG 010000, Part I ❑ o. Failure to manage construction site pollutants, NCG 010000 Part II, ❑ p. Failure to provide ground stabilization, NCG 010000 Part II, E ❑ q. Failure to meet self -inspection, reporting and record -keeping requirements, NCG 010000, Part III ❑ r. Failure to install and maintain BMP's, NCG 010000 Part II, G.2-3 ❑ s. Failure to dewater sediment basin from surface, NCG 010000, Part II, B.8 or GA ❑ I. Bypass of storrawater control facilities, NCG 010000, Part II, G.5-6 ❑ u. Other (describe) 8. Site out of compliance with NOV deadline? Yes: ❑ No: ❑ Not Applicable: ❑x 9. Has sedimentation damage occurred since last inspection or at 11 inspection? Yes: ❑ If yes, where? (check all that apply) No: ❑x Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑ 10 11 Description: Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: ❑ moderate : ❑ Contact made with (name): N/A severe: ❑ Title: Inspection report given: ❑ or sent: ❑x to person financially responsible. Date given/sent: August 5, 2021 Corrective actions needed: Permanent ground cover has been adequately established. Permit will be closed. Report by: Natalie Norberg Date of inspection: August 4, 2021 cc: Others present: Lauren Garcia Time arriving on site: 8:30 Time leaving site: 8:35 Page 1 of 2 Revised 06222020 County: Franklin 12. Comments: Division of Energy, Mineral and Land Resources Project: Holden Creek Preserve Phase 5 -Various Lots Project # FRANK-2020-021 Check only one box, ii closing out project. ❑ Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required. Project is released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated. ❑x Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required and the project is released under the SPCA. If this project has a Certificate of Coverage (COC) under the NCGO1 permit, then complete the electronic Notice of Intent (eNOT) form at deq.nc.gov/NCGO1. Report by: Natalie Norberg Date of inspection: August 4, 2021 Page 2 of 2 Revised 06222020