Loading...
HomeMy WebLinkAboutNCG180085_Vanguard Furniture Letter and Report_20210927ROY COOPER Governor ELIZABETH S. BISER secretary BRIAN WRENN Wrernw NORTH CAROLINA Environmental Quality September 27, 2021 Vanguard Furniture Company, Inc. Attention: John Bray, Permit Owner P.O. Box 2187 Hickory, North Carolina 28603 Subject: Compliance Evaluation Inspection Craftwork Guild Plant NPDES Certificate of Coverage — NCG180023 NCG180085 Catawba County, North Carolina Dear Mr. Bray, Enclosed please find a copy of the Compliance Evaluation Inspection Report for the inspection we conducted at the Craftwork Guild Plant on September 22, 2021. Please note that in the stormwater inspection report summary we ask that the Stormwater Pollution Prevention Plan (SWPPP) and site map be updated by January 14, 2022. In addition, locate all outfalls and begin monitoring from each outfall per the permit. Submit to the Mooresville Regional Office a completed monitoring record for each outfall by January 14, 2022. The report should be self-explanatory; however, should you have any questions, please do not hesitate to contact me at (704) 663-1699 or by E-mail at james.moore@ncdenr.gov. Sincerely JiJes Moore tant Regional Engineer Enclosure c: Laserfiche D EW O%Z North Carolina Department of Environmental Quality I Division of Energy, Ivfineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 1 Mooresville, North Carolina 28115 w-\04W� 704.663.1699 Compliance Inspection Report Permit: NCG180085 Effective: 08/01/19 Expiration: 05/31/24 Owner: Vanguard Furniture Co Inc SOC: Effective: Expiration: Facility: Craftwork Guild Plant County: Catawba 431 Simpson St Region: Mooresville Conover NC 28613 Contact Person: Cathie Lane Title: Phone: Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/22/2021 Entry Time 11:20AM Primary Inspector: Jesse M McDonnell Secondary Inspector(s): Certification: Phone: Exit Time: 12:10PM Phone: 704-235-2139 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Furniture and Fixtures Stormwater Discharge COC Facility Status: ❑ Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG180085 Owner - Facility: Vanguard Furniture Co Inc Inspection Date: 09/22/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: The Stormwater Pollution Prevention Plan (SWPPP) has been developed, but not implemented. The SWPPP, and associated documents, needs to be updated. Qualitative monitoring is not occurring per the permit. Begin conductingmonitoring at all outfalls per the permit. Submit to the Mooresville Regional Office the updated SWPPP along with monitoringrecords by January 14, 2021. Page 2 of 3 Permit: NCG180085 Owner - Facility: Vanguard Furniture Co Inc Inspection Date: 09/22/2021 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ 0 ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ■ ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ 0 ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: The Stormwater Pollution Prevention Plan (SWPPP) -is outdated and needs to be updated. The SWPPP is not being reviewed annually, spills are not being documented, training was not documented, and the site map needs to be updated. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Qualitative Monitoring is not occuring per the permit reguierments. All outfalls must be viewed and recorded semi-annually. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ 0 1111 Comment: All outfalls were not observed during this inspeciton. Outfall locations are unknown and need to be located. Page 3 of 3