HomeMy WebLinkAboutNCC204309_NOT Closeout Documents_20210920North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481
County: Lenoir Project: Falling Creek 115kv Transmission Line Phase 1 River basin: Neuse
Person financially responsible: City of Kinston - Rhonda Barwick, Public Services Project #: LENOI-2020-005
Director
Address: PO Box 339, Kinston, NC 28502
1. Project Location: US 70, Kinston
Pictures: No
2. Weather and soil conditions: sunny, warm, dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
Title:
Date given/sent: September 17, 2021
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or
self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage
10. Comments: under the NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the
permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deg.nc.gov/Forms/NCG01-
Termination. Please note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: September 16, 2021 Time arriving on site: 12:45 PM Time leaving site: 1:45 PM