Loading...
HomeMy WebLinkAboutNCC203447_NOT Closeout Documents_20210920North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Lenoir Project: Falling Creek 115kv Transmission Line Phase 2 River basin: Neuse Person financially responsible: City of Kinston -Rhonda Barwick, Public Services Project #: LENOI-2021-001 Director Address: PO Box 339, Kinston, NC 28502 1. Project Location: US 70 —Banks School Rd, Kinston Pictures: No 2. Weather and soil conditions: sunny, warm, dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report Title: Date given/sent: September 17, 2021 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self - inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the 10. Comments: NPDES General Stormwater Permit for Construction Activities (NCG01) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:Hedocs.deg.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: September 16, 2021 Time arriving on site: 12:45 PM Time leaving site: 1:45 PM