Loading...
HomeMy WebLinkAboutNCC203374_NOT Closeout Documents_20210920North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Randolph Project: Randolph Mall Redevelopment River basin: Cape Fear Person financially responsible: Asheboro Mall, LLC - James M Hull Project #: RANDO-2020-020 Address: 1190 Interstate Parkway, Augusta, GA 30909 1. Project Location: East Dixie Dr, Asheboro Pictures: Yes -Digital 2. Weather and soil conditions: cloudy, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): N/A Title: Inspection report: Sent Report Date given/sent: June 15, 2021 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Blane Houck Others present: N/A Date of inspection: June 10, 2021 Time arriving on site: 2:45 PM Time leaving site: 3:00 PM cc: