Loading...
HomeMy WebLinkAbout20211414 Ver 1_Site Plan_20210927-&rno'je � MC3-11 L)nde-fm'cned +reeS Oh Sy)orp- i � ne- +C) ?r0�'er\d . n', cnoA 0 6o�v-ey- Please approximately sketch the following information on this plan, length of shoreline (Provide dimensions for each item, such as 10ft x 100ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 3 of 3