HomeMy WebLinkAbout20211414 Ver 1_Site Plan_20210927-&rno'je � MC3-11
L)nde-fm'cned +reeS Oh
Sy)orp- i � ne- +C) ?r0�'er\d
.
n', cnoA
0
6o�v-ey-
Please approximately sketch the following information on this plan, length of shoreline
(Provide dimensions for each item, such as 10ft x 100ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
FORM: SSGP 10-2013
Page 3 of 3