Wanucha, Dave
From:Euliss, Amy
Sent:Friday, September 17, 2021 11:11 AM
To:Wanucha, Dave
Subject:RE: U-5738 Julian Road 303d question
Good to know! Thanks!
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Friday, September 17, 2021 10:54 AM
To: Euliss, Amy <aeuliss@ncdot.gov>
Subject: Re: U-5738 Julian Road 303d question
Excellent! I probably would have allows it anyhow, with the understanding that measures would beefed up during field
ops.
Dave Wanucha
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
On Sep 16, 2021, at 11:15 AM, Euliss, Amy <aeuliss@ncdot.gov> wrote:
Please disregard that. We delved into the calculations They have been designed to the 25 year storm
event, but the plans weren’t notated. We will have them note as such on the plans, and comment to
DSSW in the permit application.
From: Euliss, Amy
Sent: Thursday, September 16, 2021 10:59 AM
To: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Jones, Matthew W <mwjones2@ncdot.gov>
Subject: U-5738 Julian Road 303d question
1
Dave,
We are in the process of preparing our permit application for U-5738 (Julian Rod widening) in Rowan
County. We completed our JD and MCDC (SEPA documentation) in 2017. During preparation of our
permit package, we discovered that Town Creek was added to the 303d list for turbidity on the 2020
list. It was not there for turbidity prior to that. We have already designed the EC plan and are preparing
to let in February 2022. I know DSSW is typically required for projects with streams that are on the
303d list for turbidity. Redesigning the EC plan to meet DSSW at this time could cause delays to our
project schedule. Can you tell me if the project would be grandfathered due to the recent change in
listing for the DSSW requirements? I know DWR does grandfather for buffer rules based on document
date, and wanted to see if it was possible to apply the same logic here. Please advise as soon as
possible. We have to turn in our plans soon to meet the let date, and are very concerned that the let
date might be in jeopardy if we have to redesign the EC plans.
You will be seeing the permit application in the next couple of days.
Amy Euliss
Division 9 PDEA Engineer
North Carolina Department of Transportation
336 747 7802 office
aeuliss@ncdot.gov
375 Silas Creek Parkway
Winston Salem, NC 27127-7167