HomeMy WebLinkAbout20081764 Ver 4_Public Notice_201308160%-116q
US Army Corps PUBLIC NOTICE
Of Engineers
Wilmington District
Issue Date: August 13, 2013
Comment Deadline: September 12, 2013
Corps Action ID Number: SAW- 2005 -00344
(ORM #2004 - 00344)
The Wilmington District, Corps of Engineers (Corps) received a request from the Town
of North Topsail Beach seeking a permit modification to their current Department of the
Army (DA) authorization issued on May 27, 2011 to relocate the New River Inlet ebb
tide channel and to conduct beach nourishment along 11.1 miles of North Topsail Beach
oceanfront shoreline in Onslow County, North Carolina. The modification request
consists of changing Phase V's original permitted construction schedule and beach fill
footprint.
Specific plans and location information are described below and shown on the attached
plans. This Public Notice and all attached plans are also available on the Wilmington
District Web Site at
http:// www .saw.usace.army.mil/Missions/Re atogyPermitPro rpx. Also, please
reference the December 2009 Final Environmental Impact Statement (EIS) and the April
13, 2011 Record of Decision (ROD) for the May 27, 2011 DA authorization.
Applicant: Mr. Stuart Turille, Town Manager
Town of North Topsail Beach
2008 Loggerhead Court
North Topsail Beach, North Carolina 28460
Agent (if applicable): Coastal Planning & Engineering of North Carolina, Inc.
C /o: Mr. Brad Rosov
CB &I
4038 Masonboro Loop Road
Wilmington, North Carolina 28409
Authority
The Corps evaluates this application and decides whether to issue, conditionally issue, or
deny the proposed work pursuant to applicable procedures of the followi
Authorities:
® Section 404 of the'Clean Water Act (33 U.S.C. 1344)
® Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.
Y3
❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972
(33 U.S.C. 1413)
Location
The Phase V project site, 34129'12.59" N & 77 025'48.52 "W, extends from North Topsail
Beach/Surf City limits to approximately 1.75 miles southwest of NC Hwy 210 high rise
bridge and encompasses approximately 3.85 miles of North Topsail Beach oceanfront
shoreline; and also includes an offshore borrow source located approximately 0.5 mile
directly offshore from the high rise bridge in Onslow County, North Carolina.
Existing Site Conditions
Phase I of the original permit was implemented during the 2012 /2013 dredging window
and all work was completed by February 2013. This phase included the relocation of the
New River ebb tide channel with the use of a cutter head dredge and the placement of an
estimated 566,244 cubic yards of dredged material along approximately 7,500 linear feet
of the north - northeast ocean shoreline on North Topsail Beach.
The Phase V beach fill placement is approximately 3.85 mile stretch (of the original 11.1
miles) along the southwest ocean shoreline of North Topsail Beach. Unlike most of the
other phases, this section, originally known as the southern section, is located outside of
the Coastal Barrier Resource System (CBRS), which prohibits the expenditure of Federal
funds pursuant to the Coastal Barrier Resource Act of 1982 (CBRA -82) and the Coastal
Barrier Improvement Act of 1990 (CBIA -90). Being outside of the CBRS and eligible to
receive Federal funds, this southern section of North Topsail Beach remains included in
the U.S. Army Corps of Engineers study area for the development of Topsail Island long-
term Federal shoreline protection plan.
Applicant's Stated Purpose
One of the main purposes for the Town's original construction timeframe was due to
financial limitations and scheduling. The applicant's stated purpose for the project
modification is to expedite the construction schedule and funding process due to the
positive results in implementing Phase I. With the potential of new funding avenues, it is
the Town's desire to push for a consecutive beach placement event this upcoming
dredging season. Additionally, the Town's purpose to increase the footprint for Phase V,
which is a similar density rate as the other phases, is due to the shortfalls of the Federal
Project.
Project Description
Project plans consist of increasing the beach fill volume to 1.5 million cubic yards (over
twice the amount of the original volume of 512,400 cy) with a range fill density of 50 -92
cubic yards per linear foot, averaging 75 cubic yards per linear foot. This proposed linear
footage is similar to that of the other phases. By implementing Phase V in 2013/2014
dredging window, the schedule for this phase will deviate from its original estimated
timeframe of (7) years following the initial construction of Phase I. All other original
plans for Phase V, as stipulated in the FEIS, ROD, and May 27, 2011 DA authorization,
remain unchanged. This includes the use of the offshore borrow area, utilization of a
cutter head dredge, and the implementation of all mitigation, minimization, and
avoidance measures outlined in Section 6.0 of the FEIS and in the Special Conditions of
the DA authorization.
Avoidance and Minimization
The applicant provided the following information in support of efforts to avoid and/or
minimize impacts to the aquatic environment: All mitigation, minimization, and
avoidance measures outlined in Section 6.0 of the December 2009 FEIS and the May 27,
2011 DA authorization remain valid.
Compensatory Mitigation
The applicant offered the following compensatory mitigation plan to offset unavoidable
functional loss to the aquatic environment: All mitigation, minimization, and avoidance
measures outlined in Section 6.0 of the December 2009 FEIS and the May 27, 2011 DA
authorization remain valid.
Essential Fish Habitat
Pursuant to the Magnuson - Stevens Fishery Conservation and Management Act, this
Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The
Corps' initial determination is that the proposed project may affect, but not likely to
adversely affect EFH or associated fisheries managed by the South Atlantic or Mid
Atlantic Fishery Management Councils or the National Marine Fisheries Service
(NMFS).
No additional effects to fisheries are expected to be incurred with the implementation of
the permit modification outside of what has been previously documented in the original
permit. All potential direct and indirect impacts to EFH and other fishery resources
associated with the proposed modification activities can be referenced in the original
September 2009 EFH Assessment. NOTE: Through coordination with NMFS on August
5, 2013, an amendment to the 2009 assessment will not be prepared for the permit
modification.
Cultural Resources
Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of
33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C,
the District Engineer consulted district files and records and the latest published version
of the National Register of Historic Places and initially determines that:
® No historic properties, nor properties eligible for inclusion in the National
Register, are present within the Corps' permit modification area (offshore borrow
area and Phase V placement footprint); therefore, there will be no historic
properties affected. The Corps subsequently requests concurrence from the
SHPO.
NOTE: As a result of the January 21, 2008 cultural resource survey during the
original permit review, no historic properties, nor properties eligible for inclusion
in the National Register, were present within the offshore borrow area or the
Phase V placement area. By letter dated March 12, 2008, SHPO concurred with
the findings in that original survey. Special Condition No. 13 of the May 27,
2011 permit remains valid and states, "If submerged cultural resources are
encountered during the operation, the USACE will be immediately notified so that
coordination can be initiated with the Underwater Archeology Unit (UAU) of the
Department of Cultural Resources. In emergency situations, the permittee should
immediately contact the UAU at (910 -458- 9042), Fort Fisher, so that a full
assessment of the artifacts can be made."
The District Engineer's final eligibility and effect determination will be based upon
coordination with the SHPO and/or THPO, as appropriate and required, and with full
consideration given to the proposed undertaking's potential direct and indirect effects on
historic properties within the Corps - identified permit area.
Endangered Species
Pursuant to the Endangered Species Act (ESA) of 1973, under purview of U.S. Fish and
Wildlife Service ( USFWS) and the NMFS Protective Resources Division, the Corps
reviewed the project area, examined all information provided by the applicant, consulted
the latest North Carolina Natural Heritage Database, and reevaluated the November 2009
Biological Assessment (BA) for the original permit. The project area for the
modification request is included in the November 2009 BA overall project area and was
part of the evaluation during our original ESA review and consultation. However, since
the previous consultation, the Corps has become aware of USFWS and NMFS's recent
and separate proposals to list Critical Habitats for the loggerhead sea turtle (Caretta
4
caretta) subject to each agencies purview. The proposed Critical Habitat designation
listings, which include onshore nesting habitat for USFWS, Sargassum habitat for
NMFS, and Neritic habitat for NMFS, include North Topsail Beach. Based on this new
available information:
® The Corps determines that the proposed project modification may affect, not
likely to adversely federally listed endangered or threatened species or their
formally or proposed designated critical habitat. A Supplemental BA to the
November 2009 BA has been prepared and will be provided to USFWS and
NMFS. The Corps reinitiates consultation under Section 7 of the ESA with each
agency and will not make a permit decision until the consultation process is
complete. NOTE: In our previous consultation associated with the original
permit request, which included using the offshore borrow area with a cutter head
dredge and the placement of fill along Phase V limits, both the USFWS and
NMFS concluded that the activity is not likely to adversely affect any of the listed
species under their purview. All Special Conditions of the May 11, 2011 DA
authorization associated with threatened and endangered species remain valid.
Other Required Authorizations
The Corps forwards this notice and all applicable application materials to the appropriate
State agencies for review.
North Carolina Division of Water Ouality (NCDWO): The Corps will generally not
make a final permit decision until the NCDWQ issues, denies, or waives State
Certification required by Section 401 of the Clean Water Act (PL 92 -500). The receipt of
the application and this public notice combined with appropriate application fee at the
North Carolina Division of Water Quality Central Office in Raleigh constitutes initial
receipt of an application for a 401 Water Quality Certification. A waiver will be deemed
to occur if the NCDWQ fails to act on this request for certification within sixty days of
the date of the receipt of this notice in the NCDWQ Central Office. Additional
information regarding the Clean Water Act Certification may be reviewed at the
NCDWQ Central Office, Wetlands, Buffers, Stormwater Compliance and Permitting
Unit, 512 North Salisbury Street, Raleigh, North Carolina 27604 -2260. All persons
desiring to make comments regarding the application for certification under Section 401
of the Clean Water Act should do so, in writing, by September 12, 2013 to:
NCDWQ Central Office
Attention: Ms. Karen Higgins
(LISPS mailing address): 1650 Mail Service Center, Raleigh, NC 27699 -1650
13
(physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604
5
North Carolina Division of Coastal Mana¢ement (NCDCM): The application
did not include a certification that the proposed work complies with and would be
conducted in a manner that is consistent with the approved North Carolina Coastal Zone
Management Program. Pursuant to 33 CFR 325.2 (b)(2) the Corps cannot issue a
Department of Army (DA) permit for the proposed work until the applicant submits such
a certification to the Corps and the NCDCM, and the NCDCM notifies the Corps that it
concurs with the applicant's consistency certification. As the application did not include
the consistency certification, the Corps will request, upon receipt„ concurrence or
objection from the NCDCM.
Evaluation
The decision whether to issue a permit will be based on an evaluation of the probable
impacts including cumulative impacts of the proposed activity on the public interest.
That decision will reflect the national concern for both protection and utilization of
important resources. The benefit which reasonably may be expected to accrue from the
proposal must be balanced against its reasonably foreseeable detriments. All factors
which may be relevant to the proposal will be considered including the cumulative effects
thereof; among those are conservation, economics, aesthetics, general environmental
concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain
values (in accordance with Executive Order 11988), land use, navigation, shoreline
erosion and accretion, recreation, water supply and conservation, water quality, energy
needs, safety, food and fiber production, mineral needs, considerations of property
ownership, and, in general, the needs and welfare of the people. For activities involving
the discharge of dredged or fill materials in waters of the United States, the evaluation of
the impact of the activity on the public interest will include application of the
Environmental Protection Agency's 404(b)(1) guidelines.
Commenting Information
The Corps of Engineers is soliciting comments from the public; Federal, State and local
agencies and officials, including any consolidated State Viewpoint or written position of
the Governor; Indian Tribes and other interested parties in order to consider and evaluate
the impacts of this proposed activity. Any comments received will be considered by the
Corps of Engineers to determine whether to issue, modify, condition or deny a permit for
this proposal. To make this decision, comments are used to assess impacts on endangered
species, historic properties, water quality, general environmental effects and the other
public interest factors listed above. Comments are used in the preparation of an
Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS)
pursuant to the National Environmental Policy Act (NEPA). Comments are also used to
determine the need for a public hearing and to determine the overall public interest of the
proposed activity.
0
Any person may request, in writing, within the comment period specified in this notice,
that a public hearing be held to consider the application. Requests for public hearings
shall state, with particularity, the reasons for holding a public hearing. Requests for a
public hearing shall be granted, unless the District Engineer determines that the issues
raised are insubstantial or there is otherwise no valid interest to be served by a hearing.
The Corps of Engineers, Wilmington District will receive written comments pertinent to
the proposed work, as outlined above, until 5pm, September 12, 2013. Comments should
be submitted to Mr. Mickey Sugg, Wilmington Regulatory Field Office,
69 Darlington Avenue, Wilmington, North Carolina 28403 , at (910) 251 -4811, or by e-
mail at mickey.t.sugg_@usace.army.mil.
VA
n
D
N-I
D
r
'O
z
z
^z^
YMMI
90
m
z
O
z
m
m
z
O
O
m
z
O
D
O
Zr_
D
z
n
T
OD
C
A
A
O
1�
O
IA
A
0.
In
01
A
A
7
rr
O
1
V
0!
A
l L
260000
Ini
.•,� sue- ;r ^?�: '
h •, a
r
•
PROPOSED PHASE 5
20,320 LF
-r1.5 MILL CY
•
ATLANTIC
OCEAN
780 +�0
= y s
GJ �/
0
260000 -i
LEGEND: NOTES:
.A�• HARDBOTTOM MAPPED 2004, 2005 AND 2006 Q BORROW AREA 1. COORDINATES SHOWN ARE IN FEET BASED ON
SECTION LIMIT 0 COARSE MATERIAL CUT AREA THE NORTH CAROLINA STATE PLANE COORDINATE
SYSTEM, NORTH AMERICAN DATUM OF 1983 (NAD 83).
® PROPOSED FILL PLACEMENT A USACE BASELINE STATION 2.2012 BACKGROUND IMAGERY IS FROM THE USDA
NATIONAL AGRICULTURAL IMAGERY PROGRAM.
z
O
4
S
O
A
of
n
S
N
S
0
m
v
O
m
0
O
v
0
m
po
J
�b
f
f
'JY
'
260000
Ini
.•,� sue- ;r ^?�: '
h •, a
r
•
PROPOSED PHASE 5
20,320 LF
-r1.5 MILL CY
•
ATLANTIC
OCEAN
780 +�0
= y s
GJ �/
0
260000 -i
LEGEND: NOTES:
.A�• HARDBOTTOM MAPPED 2004, 2005 AND 2006 Q BORROW AREA 1. COORDINATES SHOWN ARE IN FEET BASED ON
SECTION LIMIT 0 COARSE MATERIAL CUT AREA THE NORTH CAROLINA STATE PLANE COORDINATE
SYSTEM, NORTH AMERICAN DATUM OF 1983 (NAD 83).
® PROPOSED FILL PLACEMENT A USACE BASELINE STATION 2.2012 BACKGROUND IMAGERY IS FROM THE USDA
NATIONAL AGRICULTURAL IMAGERY PROGRAM.
z
O
4
S
O
A
of
n
S
N
S
0
m
v
O
m
0
O
v
0
m
po
J
n
O
D
D
r
z
z
z
ci
90
m
z
a
z
m
m
z
0
O
n
z
O
x
a
O
Zr_
D
z
p
r
DO
C
I
m
N
3
d
N
V
O
F+
V
tp
3
ID
CL
a
D)
I
z
s
m
0
,. PHASE 1
0000 ,,�`', 280000
� � E
PHASE 1: 9,000 ft W
PaHA�� o c� 544,400 cy S
PHASE 2:10,120 ft 0 1,500 3,000
��• 940,700 cy Feet
♦� 1 Inch = 3,000 feet
o 0 0
e e o
o ` 0 0
MATCHUNE - FIGURE 6 �°+ ee to
Cm
LEGEND
HARDBOTTOM MAPPED 2004, 2005, AND 2006
PROPOSED CHANNEL LOCATION
AL USACE BASELINE STATION
NOTES
1. COORDINATES SHOWN ARE IN FEET BASED ON
THE NORTH CAROLINA STATE PLANE COORDINATE
SYSTEM, NORTH AMERICAN DATUM OF 1983 (NAD 83).
2. DATE OF AERIAL PHOTOGRAPHY FROM APPROXIMATELY
1010 +80 NORTH: JUNE 2008, FLOWN BY THE ATLANTIC
GROUP (TAG).
3. DATE OF AERIAL PHOTOGRAPHY FROM APPROXIMATELY
1010 +80 SOUTH: FEBRUARY 2005, FLOWN BY GEOVANTAGE.
z
O
4
s
O
N
a
m
d
A
s
m
0
0
O
m
t
D
r
M
z
z
G)
Ip
m
z
G)
z
m
m
29
z
G)
O
n
z
O
D
0
r_
z
n
In
co
00
C
N
3
14
N
V
N
O
F+
N
Q
a
or
I
o'r
A
A
r�
'11 11 - - /
y•� ��� ��
000 �, tiR,
Fk
too it
F
L'
5
le
LEGEND
.a,• -� HARDBOTTOM MAPPED 2004, 2005 AND 2006
0 BORROWAREA
BORROW AREA DESIGN CUTS
Q COARSE MATERIAL CUT AREA
® USACE BASELINE STATION
f
ON,S O W
EA, Y
E 27-7
----------------
TCHLINE -FIGURES
270000-1
PHASE 3: 11,500 ft
393,800 cy
PHASE 4: 6,880 ft N
721,500 cy
W - E
S
$ 0 1,500 3,000
TKiiZiiFeet
w N 1 inch = 3,000 feet
NOTES
1. COORDINATES SHOWN ARE IN FEET BASED ON
THE NORTH CAROLINA STATE PLANE COORDINATE
SYSTEM, NORTH AMERICAN DATUM OF 1983 (NAD 83).
2. DATE OF AERIAL PHOTOGRAPHY: FEBRUARY 2005,
FLOWN BY GEOVANTAGE
z
O
O
m
d
n
N
O
m
0
m
0
m
m
ao
c
w
3
of
mc
N
V
N
Mme+
1'+
fp
3
Q.
I
z
f0
7
0
a
6o
o,o
1 6
1
v .f. .
`r!7
0
1 11
11 11•
�Yg
r •.,,; -may •
PHASE
0
0
0
0
PHASE
O �d
b
c�4s0000
E
v 1,aw 3,000 0
—iiiiiFeet 0°0
1 Inch equals 3,000 feet N
LEGEND NOTES
1. COORDINATES SHOWN ARE IN FEET BASED ON
HARDBOTTOM MAPPED 2004, 2005 AND 2006 = COARSE MATERIAL CUTAREA THE NORTH CAROLINA STATE PLANE COORDINATE
BORROW AREA AL USACE BASELINE STATION SYSTEM, NORTH AMERICAN DATUM OF 1983 (NAD 83).
2. DATE OF AERIAL PHOTOGRAPHY: FEBRUARY 2005,
- BORROW AREA DESIGN CUTS FLOWN BY GEOVANTAGE.
z
0
4
0
v
a
A
S
N
r3D
0
rD
O
m
a