Loading...
HomeMy WebLinkAbout20130867 Ver 1_401 Application_20130813DURHAM CITY OF DURHAM Public Works Department 101 CITY HALL PLAZA I DURHAM, NC 27701 919.560.43261 F 919.560.4316 www.DurhamNC.gov 1869 CRY OF MEDICINE August 7, 2013 20130867 VIA CERTIFIED MAIL RETURN RECEIPT REQUESTED NCDWQ, Webscape Unit 1650 Mail Service Center Raleigh NC 27699 -1650 RE: Pre - construction notification /Major Water Quality application for Third Fork Creek bank stabilization Dear Sir /Madam: The City of Durham Public Works Department is administering a contract for stabilization of stream banks of unnamed tributatries of Third Fork Creek. These unnamed tributaries are in an active floodplain and pose an imminent threat to the adjacent City infrastructure such as the greenway trail and sanitary sewer. I have previously discussed this project with Martin Richmond and Cherri Smith. Please let me know if you have any questions or concerns. Sincerely, 4�v_ oe� Sujit Ekka, P.E., CFM Civil Engineer Sul it. Ekka(&-durhamnc.gov �c�r�oee� AUG 1 5 2013 Encl: 1. Five (5) copies of the application 2. Check for $570.00 payable to the NC Division of Water Quality 3. Copy of wetland jurisdictional determination from 2010 for Third Fork Greenway project c: Eric Alsmeyer, US Army Corps of Engineers Dana Hornkohl, Civil Engineer C .S. ARNI1 CORPS OF ENGI\ E-ERS \ \IL \II \(11)(1\ DPNs'1RKT \,:U1ur I� 1i•1 2009- 01608 ( omin I >urh:rnr I tit 11 !,)tl,ld suut1)11cs1 Dul1),111) GI•:\ER \I. PEIZ111 f (IZ1:GRA A \ \D \ \'1'IO\ \\ II)V) VE.Rll,t(' \'t IO\ 1'10[)Cll1 1 )11 nC1 ( it. of Durham. Prujecr \IgmL Dig. \u1h1 wal \sonl Dr. J.li. (timer III & \„oc.. Inc. \ttht,: Daniel L. Ding \ttu:.lennifer \I. \rchanlhault "iddl-C" 2011 I'a, Street PO Bo\ 891 Durham. \(' 27704 Southern fine,. \( 28388 1 sIghons \11 919 -360- 4197.015 910 -695- 1043 '110 !o,.I1n111 11' plori 11, (1)1.111 n.1111c nl,lah:l. um lt1 I Proposed NO! lurk ( reel. I rail. Phases I \ .\ I Il, project. I. apprlmmatt-h 3,7 mile, in Icnl th. trom (,arrett Road (BIZ 1110). -7110 I'cet north or Ilupe \ alle, lioall. ro Oal. Ilid_r Ilold\'Ird. southeast of, of Durham. \orth ( arolina. �ttr (,uadimoe., 3,1.94" \ -78.92"\\ 'A a11•I\1.n l I, ro l hird Furl.( reel. Rn rl lVin (• ;tile I-car III t 11303111102 I )L''o 1 !1)11- )11 U! I)II1(oiI,,11i,I,11111 acInIq No inge -' 1111 ,1 11111111.11\ ul .ILI111011/Cd III1111,I�:I,) \ICCIt ;III 1 /ed Iait(I CICAI-Illg. emiamin. the installation ofcmemy and the permanent and tentpor'ar• placement of till (earth, riprap and p;I\elllellt). nece„ar� lot- the cun,truction of the Proposed Third lurk ( reel. I rail. Phases 1 \ .o Ill. project, in accordance "kh the driminl s submitted on 1 19,211111. and ,uhicct to the Special condition, helot,. \1)1,11, thl' I .1)1 �: 4(14 (( 1:.111 \\ at;: \.I.. - 1 ti( 1 1 -1) _ 'No11J1)n I(I ( I:1) e1 . IILI I I,Il Ilk l, \i I.:: l �( X1,3► \U1114111"'11 till \allun11o11: (icuoi,11 I'•:Inul \on I)oi(.) 11 - Surnllla •s of kill horiied_I J).aFts and 1Zelluired \litigation ( 31)!11 \\ xcl 1,:, 1 _ \\ el1and t.l:) I. tlllllpol -lalll silo Itll (III 1)111)1111,1111 tiliv.1111 111 1 I1:tlll'Ula I'rl 1)1.1)1.1)1 I rn11�1v.It � I'rnn,nl�nl 11•oylul.0 � P�1 nLUlrnl 11•nyn11.1, � I'� I nl,u1, 1.1 1A I nllla� l 1 111,11. II 0 __(1.85 0.36 0 - II 0 157 I t1Ltl l u.- ul ,Il� \\r, of l 1� I ,1 1,11 1 11.30 r11Cll 1 rn, Uf \\ ,Ill`1Owet 1 on 153 IZ1:y:,11:kl \\ 1.11,11111 Mill "1Uun (ac) 0 Ilellullvd ti11cam (11) 11 \ole: I hi, S eriticatiun replaces the preS iuu, \crillcations for this project dated 317.211(r . 8, 28 =11111), and 11 13 NN. \o additional mitigation i, required. Riprap ern,ioll protection placed at c111%crt crossing sites should he placed only on Ihe,tremil bash, or•. Kit is ncccs,arl to he placed in the Stream hell. the riprap should be placed no higher than the original stream bed. Special Permit ( undition: In order to compensate for has ul'1136 acre of riparian Ssctl:uul,. the permittee N required lu make pay meat to the North ('arolina Ecomlem Lnhancement Program (I•'I•.Ph in the mo nomtt determined h% 11:1, sufficient to pert'ornt 037 acre of restoration egnhalem riparian metland% mitigation. in the ( ape I•ear Ri\cr basin 011 drolol is ( ataloging l nit 030311002. \ccording to a receipt dated \pril 21, 2005. I•A-T has pros ided .%ripen Coll lirrnalion that i1 agrees to accept mgmn,iWM) for the mitigation isor k required. and the perrnittcc has made %"Rlclem py item. in compliance !13111 the \IOl hehtceu the UK ('arolina Department of I'm ironnlcnt and \alural Itcsourcc. and the l oiled States \rm) ( ores of En!gineen, \\ ilnlinglon Di,u•ict. dated Nmemhcr 1. 11)1)8. \o lurthrl pa,nx•nl i, required. Page I of �I \ruun I I )1 ' 1 2009 -01608 \ 11:11 1\oll, ,i I!hol I /:\1 I`\ d .1i'M C IU1.'It'I, :t� I1t1111.1 I'In\ ltlal 11 IN 1:0)IIII)IIIIICII 111 X11 I11 Jt:til 11,111,; \ III) IIII., 1'.', X1„1 t1'I'tll 11'1 ' .:I .tIt 11 ,'111:1 :tl Ill,ll IN \11\ \ It ll,l lit 117 111 II:, 1 1_:,11 „! ,,it It I. l it l l IN ,11 ,1:\ I.I171111 1l) \;1111 '1111111111%:d 111,111' 111.1_\ �llll�: t: Ill, ,1:' ialnt, .t1 .' 'I, it \ %,Il it 111,':1 1 :; NIU( 111011 01dCt .Illtl 11) . II)I1! Ol't I.II: I:C.Ii Alit 111 1111' \ :III It..:.WI I• \,11„1 JIl,I 11;11 11 I, 1. It Id 111:,1 It1 "1 i:,I t,' I:\t1 ct.I \11 tll Ill: \\ P, .tio Ii,:dttl,,: III I\t• Il oJil'tll I,1,�11,,t ul t,\ td­ ,1 1'I 1111 it \l.l.,h 11, -i1,— I' I, II . 111111:1' 1,1`„11 ,,ill 4i 1,1711111 1171171 lll„ 1 111 (11 Ili,. \ \\ I', \ \; I \I,1 I•. :I; .1 :111'11, 111II, 'A I1:1' C), \'\ t1' .Ili 1: "110,1 I Lit 11'01101- 1 '-till ,1' :l 111:11,, t1' .I', llihlil :Ullil,l,l lit tl Ulllll:llt, 1111' It II\ it\ ! \, lut, III, ,1 Ili 111.11 Ill, 1\ 1, \ 1 11 I I.l l it'll,\ I, 11 M :, 1'1,1,11I I „l J: I:\,il,:,! \m- 1 \Ili I \t I•.\c 1: I '1 '1 lit 1111' ::11111 Ill,' ,Litt• 111 Ill, I11i1,1111,,' 1-1111 In 1.11 ,,a 1, 11' IiI II:, \ \\ 11 ., „1111111 C i ii: 1,11\ II\ w,dcl I.lt' pi 71:, ,II'11 „IIIt:.IIon, o '11,' 1•.111-111\\ Itll I`CI III II \,II\ 111, • lllh�Qtt :,11,:111111 411— 1,1' 111,11:.II:,1 .It', I \ :1 .11.1\ ,II,U I,tlllllt .111 111,11\ In 1111 \ \.11,1 1 7,1.1111\ ( , 111It. ill i 11'. •1111 I ,,1111 lit III, V DI \1'1,711 lit \ \.11:1 (,Ill,'lll\ II: 1: 711111:17 1,7:111 ' ;-1 -\(it tit ,1:1:1111111: l%:t:)till 4111 I:tI1711:1111'lll' hi, I)l'jl.11 1111, :17 111 Il1C \till\ \:1il'o.- tillli JO N 11111 I:II: \l' Ili: hClnlln:C tit 1171: r:,polIN1111111\ lit 1/111.1111 .Im ,1111,1 1111,1111I'Illti\,11, polnil, 11 111,1, ,Ill' .lilt ,111:,Illlll, till, \:I Illt.ltl,ill .III\ 111 Illi t011,lltll111l lit IN. 11,111111, ill 1111.• ( oll't, tit rot . I'11,•'I ::I` 111: I,C , 011..1, 1 I ric kl \1111'\ Cr ill IC I:Illion: (11)")1 154 -4884. l' \t. D . \ J (111!1. Il:•�ul:lttlr\ OIlii:l,ll _�_Kc�� ���� t)at: � 10,211111 \ rrllirJutnl I \Iln,luun f ),11: i 18.201'_ I I1, \\ 11111111--kill D1,1110 1,,I11:IIII111:1110 [lit), 171111_ I!lc hiLllt'l l:\t' 171 '1111111111 to Ih: 1 ublit 10 lICl11 It' c'111I %:' \t tt11111171it' NO :,17111117 , : 1C l II. 11111101 'sal7'1,11'lloll 1111'\ C\ ItII .III c1 lit ut'7 \1 cl',II: .1' , 1 ' ' • 111 i 111111/17 It 111; ..11 \: \ 71111111,• Ct111\ I ui 111.11,.•\7 JHC (J. \rrhanthaull) ( - E.I:l' y�ot WATF9OG o < 20130867 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre - Construction Notification (PCN) Form A. Applicant Information f 1. Processing 1a. Type(s) of approval sought from the Corps: Q Section 404 Permit 4' ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Q Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): © 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only for Corps Permit: ❑X Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes Q No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes ❑X No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑X No 2. Project Information 2a. Name of project: Bank Stabilization in Tributaries of Third Fork Creek 2b. County: Durham 2c. Nearest municipality / town: Durham 2d. Subdivision name: N.A. 2e. NCDOT only, T.I.P. or state project no: N.A. 3. Owner Information 3a. Name(s) on Recorded Deed: City of Durham 3b. Deed Book and Page No. DB 2461, PG 118; DB 2103, PG 281 IN 3c. Responsible Party (for LLC if applicable): N.A. � D 3d. Street address: 2011 Fay St Rut- I 3e. City, state, zip: Durham, NC A 3f. Telephone no.: 919 - 560 -4197 UALIN 3g. Fax no.: N.A. W a j N.A. 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent Q Other, specify: Owner Representative 4b. Name: Sujit Ekka; Dana Hornkohl 4c. Business name (if applicable): City of Durham Public Works Department 4d. Street address: 101 City Hall Plaza, 3rd Floor 4e. City, state, zip: Durham, NC, 27701 4f. Telephone no.: 919 - 560 -4326 x 30271 4g. Fax no.: 919 -560 -4316 4h. Email address: SUJIT.EKKA @DURHAMNC.GOV; DANA.HORNKOHL @DURHAMNC.GOV 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 0719 -02 -99 -4002; 0719 -02 -98 -6966 1b. Site coordinates (in decimal degrees): Latitude: 35.95 Longitude: 78.94 1c. Property size: 5.582 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Third Fork Creek 2b. Water Quality Classification of nearest receiving water: WS -IV, NSW 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: General land use in vicinity of the project is residential. Third Fork greenway trail and City sanitary sewer are in the immediate vicinity of the oxbow channels where work is proposed. High flows have caused erosion of oxbow channel banks and the adjacent trail. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 2,000 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to stabilize banks of oxbow channels/tributatries to Third Fork Creek that are causing erosion of adjacent trail. 3e. Describe the overall project in detail, including the type of equipment to be used: The project includes bank stabilization and armonng by placing riprap and rocktoe protection at three different locations of these unnamed tributaries. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑X Yes ❑ No ❑ Unknown Comments: Protect on unnamed stream 4b. If the Corps made the jurisdictional determination, what type of determination was made? El Preliminary Q Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency /Consultant Company: Jay H Carter Associates I Other: Coulter Jewell Thames 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Jurisdictional Determination was made for the Third Fork greenway protect Date: May 10, 2010, Action ID 2009 -01608 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ❑X No ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes Q No 6b. If yes, explain. Page 3 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply)* ❑ Wetlands Q Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 Choose one Choose one Yes /No W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No - W4 Choose one Choose one Yes/No - W5 Choose one Choose one Yes/No - W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Stabilization Tributary of Third Fork INT Corps 11 52 S2 P Stabilization Tributary of Third Fork PER Corps 8 179 S3 P Stabilization Tributary of Third Fork PER Corps 8 48 S4 Choose one - S5 Choose one - - S6 - Choose one - 3h. Total stream and tributary impacts 279 3i. Comments: Width is provided for channel bottom Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWO) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number — Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet ) 6g. Zone 2 impact (square feet 61 - Yes/No B2 - Yes /No B3 - Yes/No 134 - Yes /No 65 - Yes /No 136 - Yes /No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Although erosion is in a larger segment, this project focuses on stabilization around the threatened infrastructure Contractor will be required to follow all erosion and sediment control requirements per NCDENR erosion and sediment control planning and design manual. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The proposed temporary stabilization measures are rocktoe protection and riprap armoring of limited stream bank length to minimize any construction impacts. Construction techniques will follow NCDENR erosion and sediment control regulations. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes Q No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes ❑ No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ❑ Yes ❑ No 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? % 2b. Does this project require a Stormwater Management Plan? ❑ Yes ❑ No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally - implemented stormwater management programs apply (check all that apply): ❑ Phase 11 ❑ NSW ❑ USMP ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 4. DWQ Stormwater Program Review 4a. Which of the following state - implemented stormwater management programs apply (check all that apply): []Coastal counties ❑HQW ❑ORW []Session Law 2006 -246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form —Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal /state /local) funds or the ❑X Yes ❑ No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes Q No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes Q No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑Yes ❑X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after- the -fact permit application? ❑Yes ❑X No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑Yes Q No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form — Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ❑ No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ❑ No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑Yes ❑ No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ❑ No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑X Yes ❑ No 8b. If yes, explain how project meets FEMA requirements: A local floodplain permit application is submitted to the City of Durham. 8c. What source(s) did you use to make the floodplain determination? FEMA Floodplain Maps. Map ID# 3720071900K, Panel#0719K, Effective Date 08/02/2007. Sujit Ekka Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 10 of 10 0 fi I Iw -I III -- -- -- -- Q I G I Z 3631 COURTLAND OR l / Q I RESCUE MISS IONS MINISTRIES PIN #0729 -01 -09 -1439 SPE P.O. BOX 11858 I I I DURHAM, NC \ 3632 COUP- ND DR / WILLI M A V AND SUSA T A TSON it AL FLOOD HAZARD AR A \ PIN #0719 -0 X99 -8492 FLOOD ZONE AE MAP #3720071900K ' •-- ENTRAWdE TO UST 2, 2007 I TH� -TRAIL 3639 MANFORD D CHRISTINE B FO ER PIN #0 719- 02- 9 9 -19 1 19 / 7 364.2 MANFORD DR �I,YR917 DURHAM GENERAEVICES DEPARTMENT ^)fO�i�D'aa0 O� PIN DB 2103 PG 281 Qp�QO � / / / PR 2 PP 135 / / I STREAM IMPACT NO. 1 /pl ) + / -STA. - -z,-L-42 � / FIRST CONCRETE PEDESTR'(AN BRIDGE S Si4�ET 2 3635 /C OUR TLAND DR C Y OF DURHAM / GENERAL SERVICES DEPT ' � REAL ES TA IF DI V PIN #0719 -01 -99 -9281 t�CIAt�'FLOOD HAZARD AREA FLOOD ZONE AEFW MAP #3720071900K — EFF. DATE: AUGUST 2, 2007 I I r / /� STREAM IMPACT NO. 2 (S2 +/- STA. 7 +68 J / / ( SECOND CONCRETE PEDESTRIA BRIDGE I / / SEE SHEET 2 CITY SANITARY SEWER SYSTEM /'o' ' 0 / STREAM IMPACT NO. 3 (S3) / +/- STA. 9 +35 ASPHALT TRAIL SECTION / SEE SHEET 2 CONTRACT: SD- 2013 -02 PROJECT: COP -001 THIRD FORK CREEK TEMPORARY STREAM BANK STABILIZATION VICINITY MAP SHEET NO. 1 STORMWATER & GIS SERVICES DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF DURHAM, NORTH CAROLINA AUGUST 2, 2013 0' 100' 200' GRAPHIC SCALE: 1" =100' 20 1 3086 7 �OFES•'9�i Q = cn' m a z = � /IKKA������� Gz NOTES: 1. ALL WORK TO BE COMPLETED WITHIN THE LIMITS OF CONSTRUCTION (�). 2. DETERMINE ACTUAL LENGTHS, BEND ANGLES, SIZES, ETC. PRIOR TO ORDERING ANY MATERIALS. 3. PORTIONS OF THE PROJECT SITE SHOWN HERE LIE WITHIN A FEMA SFHA. FLOOD AREAS DETERMINED FROM FEMA FIRM 3720D71900 K. 3720072900 K. AND 3720082000 K, EFFECTIVE DATES: DS /02/07. 4. AS PER ARTICLE 3 OF CHAPTER 87 OF THE NORTH CAROLINA GENERAL STATUTES, UTILITIES SHALL BE NOTIFIED FOR THE PURPOSE OF LOCATING THEIR RESPECTIVE UNDERGROUND UTILITIES THROUGH THE ASSOCIATION KNOWN AS NORTH CAROLINA ONE —CALL CENTER, PHONE: (800) 632 -4949 OR 811, WEB SITE: p�Jp://rK811 mo=h1m 5. ALL WORK SHALL CONFORM TO FOLLOWING CITY OF DURHAM PUBLIC WORKS DEPARTMENT STANDARDS. ALL DOCUMENTS MAY BE DOWNLOADED AT: 5.1. REFERENCE GUIDE FOR DEVELOPMENT 5.2. WATER AND SEWER SPECIFICATIONS 5.3. STREET SPECIFICATIONS 5.4. STANDARD DETAILS 6. ALL WORK SHALL CONFORM TO THE NCDOT STANDARD SPECIFICATIONS (CURRENT VERSION) AND APPLICABLE REVISIONS. THE NCDOT STANDARD SPECIFICATIONS MAY BE DOWNLOADED AT: �p //m ncdoLaov/DOH1PflECONSIRLY T/ W%7pecffimjjombR6rifjWiws moyb mehid, 7. ALL WORK SHALL CONFORM TO THE NCDOT STANDARD DRAWINGS (CURRENT VERSION) AND APPLICABLE REVISIONS, THE NCDOT STANDARD DRAWINGS MAY BE DOWNLOADED AT: ncd�Lgpy/-OHlPRE00NSTRLa'1,10/sW dra. /d fW h m 8. ALL WORK SHALL CONFORM TO THE NCDENR EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL (CURRENT VERSION). THE NCDENR MANUAL MAY BE DOWNLOADED AT: 9. IN THE EVENT OF CONFLICTING STANDARDS OR DETAILS, CONTRACTOR SHALL INFORM THE ENGINEER FOR DIRECTION. 10. EXISTING INFORMATION SHOWN ON THIS PLAN WAS TAKEN FROM CITY OF DURHAM GEOSPATIAL DATABASE AND IS SCHEMATIC AND APPROXIMATE. NO SURVEY WAS CONDUCTED TO GATHER THIS INFORMATION. STREAM IMPACT NO. 1 (S1) (FIRST CONRCETE PEDESTRIAN BRIDGE) PROVIDE CUT /FILL, FINE GRADING, GEOTEXTILE, AND RIP -RAP. SLOPE STABILIZATION OF THE BANK (NCDOT SECTION 462). SCOPE INCLUDES BANK UNDER THE BRIDGE AND 20 LF EACH SIDE OF PEDESTRIAN BRIDGE (SEE DETAIL, SHEET 3) STREAM IMPACT NO, 2 (S2) (SECOND CONCRETE PEDESTRIAN BRIDGE) REMOVE GABION BASKETS FROM SITE AND DISPOSE OFF. PROVIDE CUT /FILL, FINE GRADING, GEOTEXTILE, AND RIP -RAP. SLOPE STABILIZATION OF THE BANK (NCDOT SECTION 462). SCOPE INCLUDES BANK UNDER THE BRIDGE, 20 LF EACH SIDE OF PEDESTRIAN BRIDGE, AND THE SHOWN ERODED BANK (SEE DETAIL, SHEET 3) STREAM IMPACT NO. 3 (S3) (ASPHALT TRAIL SECTION) REMOVE DEBRIS FROM THE STREAM. NEAT SAWCUT TRAIL EDGE. PROVIDE CUT /FILL, GRADING, GEOTEXTILE, AND RIP -RAP FOR SLOPE STABILIZATION OF THE BANK. SCOPE INCLUDES WEST BANK. (SEE DETAIL, SHEET 3) CONTRACT: SD- 2013 -02 PROJECT: COP -001 THIRD FORK CREEK TEMPORARY STREAM BANK STABILIZATION SITE PICTURES AND NOTES SHEET NO. 2 STORMWATER & GIS SERVICES DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF DURHAM, NORTH CAROLINA AUGUST 2, 2013 E s si o 173,3 a: > _ ti LNG' ciN �. 3 DISTANCE VARIES PROVIDE GRADATION OF NCDOT RIP RAP CLASS I & II WITH NON -WOVEN GEOTEXTILE EX. STREAM BED 1 2' 3' I- III —I I p EX. GROUND 1 1F - - =1 I III I 11=111 11- ' 1 FINISHED STREAM BANK TIE TO EX. GROUND EX.STREAM BANK CONTRACT: SD- 2013 -02 PROJECT: COP -001 THIRD FORK CREEK TEMPORARY STREAM BANK STABILIZATION SHEET NO. 3 STORMWATER & GIS SERVICES DIVISION DEPARTMENT OF PUBLIC WORKS CITY OF DURHAM, NORTH CAROLINA AUGUST 2, 2013 FINE GRADE SLOPE AT 1 z :1 TO 2:1 AND PROVIDE SUITABLE FILL AS NEEDED. FILL MATERIAL TO BE PLACED IN LAYERS WITH NON -WOVEN GEOTEXTILE FABRIC TYPE II STAKED BETWEEN EACH LAYER. USE 12" LIFTS AND COMPACT USING WHEEL ROLLERS OR SIMILAR METHODS. ROCK TOE PROTECTION WITH GRADATION OF NCDOT CLASS II AND B RIPRAP AND #57 STONE NON -WOVEN GEOTEXTILE FILTER FABRIC ORIGINAL TOE OF SLOPE PRIOR TO EROSION BANK STABILIZATION DETAIL (NOT TO SCALE) a SF AL = 437 A: q .0 9 `nC' ' • /N E 62'