HomeMy WebLinkAbout20130877 Ver 1_Streambank Repair_20130814@McGiff
A S S O C I A T E S
June 27, 2013
Mr. Kris Boyd
Planning Director
Haywood County, North Carolina
157 Paragon Parkway, Suite 200
Clyde, North Carolina 28721
Dear Mr. Boyd:
FILE COPY
Project #
File #
RE: Floodplain Development Permit Application
Riverbank Restoration at Steel Bridge
West Fork Pigeon River
Haywood County, North Carolina
Please find the following attached documents as part of our application for a Floodplain
Development Permit for the riverbank restoration near the Steel Bridge crossing the West Fork
Pigeon River: 1) a project narrative, 2) a digital copy of the proposed hydraulic model, 3) a
HECRAS output table, 4) a map showing the proposed project area, and 5) a check for $150 for
the application fee.
Please do not hesitate to contact me or Dale Pennell should you have any questions about
our application.
Sincerely,
McGILL ASSOCIATES, P.A.
BRENDAN SHANAHAN, PE
Project Engineer
Enclosures
cc: Mr. Tom Covington, NC Wildlife Resources Commission (w /enc)
P:\2012 \12.00140 -Steel Bridge\ misc\ DocumentsForKrisBoyd \CoverLetter.docx
E n g i n e e r i n g • P l a n n i n g ® F i n a n c e
McGill Associates, P.A. • P.O. Box 2259, Asheville, NC 28802 • 55 Broad Street, Asheville, NC 18801
828 - 152 -0575 • Fax: 828 -252 -2518
nMcGill
A S S O C I A T E S
June 27, 2013
Mr. Kris Boyd
Planning Director
Haywood County, North Carolina
157 Paragon Parkway, Suite 200
Clyde, North Carolina 28721
RE: Floodplain Development Permit Application
Riverbank Restoration at Steel Bridge
West Fork Pigeon River
Haywood County, North Carolina
Dear Mr. Boyd:
I would like to summarize our progress regarding our proposed project to repair the
severe erosion of the West Fork Pigeon River stream bank near the USGS monitoring station at
the Steel Bridge Road crossing on NC 215. McGill Senior Project Manager, Dale Pennell, PE,
met with you in March 2013 to discuss the bank erosion problem and the possible solutions. At
that time the concern was raised as to how such a project would affect the Church located
approximately 850 feet upstream of the bridge. It was established that prior to the issuance of a
development permit a study would need to be conducted to determine the potential effect at cross
section 50938, which is located at the church.
The study was based from the effective model for the West Fork Pigeon River, which
was received from the North Carolina Floodplain Mapping Program on March 26, 2013. Two
cross sections (50271 and 50527) were added to the model between the effective cross sections
50092 and 50938. The section of bank that has been eroded is located at effective cross section
50092. For the "Existing Conditions" model, this cross section was updated to include a survey
of the bank conducted by McGill Associates in February 2013. The "Proposed Conditions"
model was created using the proposed design for the bank repair using gabion baskets.
The models were run in HECRAS 4.1.0. The comparison of the "Effective ", "Existing"
and "Proposed" model results are shown in the attached table. The modeling shows that the
proposed project would: a) reduce the base flood elevation (BFE) by 0.13 feet at cross section
50092, b) increase the BFE by 0.01 feet at cross sections 50271 and 50527 and c) not change the
BFE at cross section 50938.
E n g i n e e r i n g o P l a n n i n g • F i n a n c e
McGill Associates, P.A. • P.O. Box 2259, Asheville, NC 28802 • 55 Broad Street, Asheville, NC 28801
828 - 252 -0575 • Fax: 828 - 252 -2518
Mr. Kris Boyd, Planning Director
June 27, 2013
Page 2 of 2
Attached are 1) the HECRAS output table, 2) the cross section location map and 3) a
digital copy _of the hydraulic models. Please do not hesitate to contact me or Dale Pennell should
you have any questions about this study.
\ /
\\�V C AR , Sincerely,
Q` • • • •
j0 • MCGILL ASSOCIATES, P.A.
O.• ��S S •.?� i�
• SEAL 9
�.,•a 038718 r
ZZ
BRENDAN SHANAHAN, PE
V. Project Engineer
.j
P:\2012 \12.00140 -Steel Bridge\ misc\ DocumentsForKrisBoyd Warrative.docx
HEC -RAS River:
West Fork
Pigeon Reacn: heacn
-I rrumv. ivv -yca,
Top Wdth Act
(ft}
93
Area
(s4 ft)
939
Vel Total
(mss)
12.4
W.S. Elev
(ft)
3016.57
Base WS
(ft)
3016.57
Prof Delta WS
(ft)
Reach
River Sta
Plan
52839
Effective Model
Reach -1
93
93
939
12.4
3016.57
3016.57
Reach -1
52839
Existing Cond
939
12.4
3016.57
3016.57
Reach -1
52839
Proposed Cond
102
830
14.0
3009.83
3009.83
Reach -1
52293
Effective Model
102
830
14.0
3009.83
3009.83
Reach -1
52293
Existing Cond
102
830
14.0
3009.83
3009.83
Reach -1
52293
Proposed Cond
179
933
12.5
3004.14
3004.14
Reach -1
51782
Effective Model
179
179
933
933
12.5
12.5
3004.14
3004.14
3004.14
3004.14
Reach -1
Reach -1
51782
51782
Existing Cond
Proposed Cond
200
1444
8.1
2994.01
2994.01
Reach -1
50938
Effective Model
199
199
1435
8.1
2993.96
2993.96
Reach -1
50938
Existing Cond
1433
8.1
2993.96
2993.96
Reach -1
50938
Proposed Cond
535
2291
5.1
2991.38
2991.38
Reach -1
50527
Existing Cond
535
2296
5.1
2991.39
2991.39
Reach -1
50527
Proposed Cond
499
3414
3.4
2990.99
2990.99
Reach -1
50271
Existing Cond
499
3422
3.4
2991.00
2991.00
Reach -1
50271
Proposed Cond
180
2661
6.9
2989.77
2989.77
Reach -1
50092
Effective Model
152
2388
7.4
2989.54
2989.54
Reach -1
50092
Existing Cond
144
2282
7.9
2989.41
2989.41
Reach -1
50092
Proposed Cond
Bridge
Reach -1
50048
154
154
1494
1494
9.0
9.0
2986.17
2986.17
2986.17
2986.17
Reach -1
Reach -1
50002
50002
Effective Model
Existing Cond
154
1494
9.0
2986.17
2986.17
Reach -1
50002
Proposed Cond
202
202
202
3143
3143
3143
9.4
9.41
9.4
2981.31
2981.31
2981.31
2981.31
2981.31
2981.31
Reach -1
Reach -1
49624
49624
Effective Model
Existing Cond
1 Proposed Cond
Reach -1
149624
y =Y
�., �. ,. .; =` A ti..;.•�, ..- 'tj ire '' -.
< t - PLAN
Lij
s ae -� � i ! i • ,
c
ANMBANK REPAIR AREA
.4 4 *�T- ,. _, ;. . .. ice.. -bt `f :� t,is -_ ! :.qy„ + _- - 'Z• c ;�- -��... -- J r - _ -
4 p _ e •.
-
-
.
,
3
i
- a
A
�� a _ ^.. � '.- �,-•'�. -"'�. : ":v ° *n..�., •4 , i- r,' - s '..^ins �i�' - + .,�.- ...",:' - '
�� _ - .�' �{� i '_••Y �f__ �v -�� —
,
- G
R
AV •
ACC
E
S ARE
A ..
_
a.
M �
-
RC?SS
EC
�, •,,�;�. ��,; _ . - _ ;. __ � � _ `S TIQN 50092 -
.���
a ^ha
_
y
-
-i
tii • �,:,• :; r
N 5
.e t
y_
a; 4
C
._ 02
71
ON- ENCROA CHMEN
__
-J
- - . �s.•wy 'a1 - s # - � a� .. �' `~sti ,. a2.. _ � ,_+ �i -r �.c.�y�_t. . < � _ � ,f � -.h` { r . ±.'
a., uw ? <��_� a~�.. .t. i�.t � < ::s. y�•y +ice _ F:�� _�1 �c - -,!s?� _
.- :<<-��z� �4u �• ;a- � '� I. y-� .:Y� .}'.C•�Y..�,yrt..� .: -:4 '�:... -If � '`"�'' /i f
``�i i'r'+•k,!+t w. d'': A.. '+a•': } +'.w't ?° ,i-�a: g,!'f E
`�• R *��a\`?ia��+`� i' .s. �.:y.. � iC
a
-
�i. ^_- �`'�,`_ -. St -? Z.•F �l�a� •fit �`a4 ._4 � j•� ...°�.• _ - ��c- . -+•�T- T _ 7: ,�c.H
S
R
•
N 50 -
Q
EC,T[
:. O
527
♦ . _ :"it��
r
J i
,
r '
- .. > ti - • .. __ a_ - � '� } .,,. \ J - � yam'^ � .. ��-° a. �•� y� �✓
. '4\ � � ^•��r � � — 114.. - � � �'' a.'.� — -' "^"i JC -�f •�'.w q�P" ,
•
_
i
- ED C
3
>
S e rt
,
W � �
t
DEVELOPMENT PERNIIT FOR THE HAYWOOD COUNTY FLOOD HAZARD AREA
Development Permit Number 5ne O a
Application Date -7--T-13
Owner's Name STaT,�� n!G G►l�s .ar�
Address P . o . �3 e * W,9
R.o..t,gAk rim a7%D1
Telephone
Building Permit Number
f l�en�w S�aka,�,
Cpl; --r Name �,(,r; I I AS S y e-,'c -45
Address 5 5 13ro" S T
Askey; lte, Wc- a►wo I
Telephone _R a.k - 3.5 2. - b5-75
Property Identification Number (PIN) $ Io 3 a - 4.14- 8 & 3 le
FIRM Panel Number Zone Floodway Map Number
Stream Velocity (fps) Cross Section
1. Location of proposed development:
iai
2. Description of proposed development:
New construction Manufactured Home
Alteration of channel Filling
Addition to existing structure
Alteration or repair - if yes, answer the following:
Estimated market value of existing structure $
Cost of proposed construction $
Park Model RV
Grading
Dredging
If the cost of the proposed construction equals or exceeds 50% of the market value of the structure, then the
substantial improvement requirements shall apply.
Other (please specify)
3. Type of Construction:
New residential
Y_ New non - residential
Addition
4. Size of Proposed Development:
5. Location within Flood Hazard Area:
Improvement to existing structure
Accessory structure
Temporary structure
Width of Floodway (Ft) on property
_ (X Inside regulatory floodway limits
Outside of floodway limits, but within flood fringe
Inside flood hazard area where no detailed information is available (unnumbered A zone).
Ground elevation Base Flood Elevation (BFE)
Required lowest floor elevation
Required flood - proofed elevation (if applicable)
MSL (NGVD)
7. Required supporting documentation that must be provided as part of the application for a development
permit:
Yes No N/A
Yes No N/A
Yes No N/A
a) No -rise certificate from an engineer if the proposed
development is inside the floodway.
b) Survey plat indicating ground elevations at four
comers of existing or proposed building, base flood
elevation and location of flood line.
c) Building plans showing proposed First Floor elevation
and any other necessary information.
8. Applicant has been made aware that within 21 days of completing the lowest floor, the surveyor must provide
the Planning Office with an Elevation Certificate.
Applicant acknowledgement: I understand that the issuance of this permit is contingent upon the above
information being correct, and that the plans and supporting data have been or shall be provided as required. I
agree to comply with all applicable provisions of the Haywood County Flood Ordinance and all other laws or
ordinances affecting the proposed development.
Applicant Signature 7J Date �M12
Date of Issuance -7 'g"13 By /Q-
Continents:
�-rt•Ga.ro. 2i- �Tora-6
R„ ••� � •+.c. G,C.GA W 1 -t-�.: � � t9 O � � fie.,' n •�. x'15 t � � y� n/�� �n,Gt��.•c,l►w�,.a.,,i
mecca. I h.r �-i ea- L-s Sr-s jskc!is Lo .'rt9 a FJ� -Apt Cass -sec—'y"_ _
0 el -t is L we lr j 4 r-i' s far_ 'fda
Approved for compliance by:
Date of form: 1/6/97
Date
000 �0 HAYWOOD COUNTY PLANNING
ANNEX II
1233 N. MAIN ST.
1808 WAYNESVU LE, NC 28786
RECEIVED FROM
nol
001903
g 20 13
Amount Paid $ 15 b p D �aT 65(09,g3)
STEEL BRIDGE
STREAMBANK REPAIR PROJECT
N__C WILDLIFE RESOURCES COMMISSION
HAYWOOD COUNTY, NORTH CAROLINA
McGill
A S S O C I A T E S
ENGINEERING -PLANNING -FINANCE
55 BROAD STREET ASHEVIL.I F, NC 28801 PH. (828) 252 -0575 FIRIM LICENSE # C-0459
PROJECT LOCATION:
35' 23'45.84" N, 82° 56' 16.30" W
WAYNESVILLE w
( QUADRANGLE ; jiT16 ;r f'I'LE LIST r � n n
w
PISGAH
d N1 A T I 0 d -L -F-0 R E S T.
� r
I
F.
LAKE
PI3G. AAAH G
PROJECT -
F A,
LOCATION .
`7-
L A �, BRIDGFi N r; m
WEST FORK 6
IGEOAJ'Rp,ER
Ag
I ,z.
PROJECT LOCATION MAP NOT TO SCALE
M
JULY 2013
SCHEDULE OF DRAWINGS
G -001 .....
COVER SHEET / PROJECT LOCATION MAP
C -101 .....EXISTING
CONDITIONS
C -102 .....
PROJECT PHOTOGRAPHS
C -103 .....
STREAMBANK REPAIR PLAN
C -501 .....
CROSS SECTION A -A
AND CROSS SECTION B -B
C -502 ....
MISCELLANEOUS NOTES
C -503 ....
MISCELLANEOUS DETAILS
PRELIMINARY
NOT FOR CONSTRUCTION
o:1z01z —1. --.i ana0,�o„g.�cr ino�..w,a,�c,,,,�n.,i R- 7- 122013 SUBM11-12.001 -1.-9. MSIGNAM BWO132:35M gas
F>
\m
\\
{)
ken
\Q
II
(
§
)
,
§m
)\
/§
){
2\
\$
§k
)k
CO/
{
!
z
O�
\
m
_
zz
«
E>
n
ix
z
kj
§�
\mz
\\
kq
§
7
!
\
(
\\})
; >5�
(} §0
3(;)
M zx
\
)� §j
!`P
\( o ]7
_� §)
)\§( ca
0A
(\(
t'
>dko
%m §,
)k2)
9\ ;q
°� \)
�§32
;3!`
)OM'
)� §)
>),
0c
=;5
§§k
�§/
())
\/\
)k)
G)z\\#
)2
]§
§4
9;
e §'tI
m$()
)
�2 ;2
$
w ;
\} /
I,
°m0q
zex�
/ §/
[
(j /\
/0
)�\\
§
\ §R§
G / \)
, ,
\�\\
- /(
}§§z
`\ /(
�
UK
u)\
Am!
§§§
\
rn2
-q >q
m
JOB NO: 12.00140
DATE: JULY 2013
STEEL BRIDGE
T
PROJECT
DESIGNED
/�
STRE&eBaNK REPAIR PROJECT`°
m
IIAL
Q
PHOTOGPHS
DESIGN
NC WILDLIFE
FILE NAME
RESOURCES COMMISSION
'
Rc$N�xt7
m�oomu£t m�wgRO m
� �/� ®®
ENGIKEE!&LANINFl�c
-___ _ NC_ P&__ __,_,
019019 113.m1.0 -BI•M &WpN0u1pn1CNNA•>Mp.' Coro• pu• IPYm' M -1f 901] 6lBNTT /�L \t2A01N8W b1�.0E8N3N.My WMISIMPMLgB
I I 1
UP
I
j i I 1
I I
IZ I ZI ��GZ)m•m91 •
I
n
� CIE Ii
zv to II Ta �QQ mm
W N O�LJN� ]]I O 1\ CI_I. -j9f' ��Z� Zc Z 1
Ul V coha
>� il>0 CZi� OM OM NmN I�1 I OWwr Z 1
Or mCOA ZD �N I I I p9N0�1� m
VI A i ti � j ,Zmj I I I fp �CTm{
I
mZ ocao Smzm CONCRETE �! !
mm Fom �D� I I. �D - -- --
oc m�Z) '-1OOa f ��� i � � �i CON C ETE
10^� w m°mmz I ��� i i LJ 4
�N �m mZZ I_) y , I _ 29650
tia tnr_
>2z
N, i 't ;� —�_ —_ I __ - -- _-i q�l
(A m0 moo I 11 i t _
ED o� -. + row - -� SPINDLE . t - -nw___ 994
ZD'i8 ii Dra j ASPHALT 1 STE3R. 1218E ROAD ""t og
lI f A
>Z
00m 0 oxq I rt- --T- -` - - -= •m._- - - -\ mz
2 G o' -1 Z D I 1 ui iRilr— :: >.x,- _: :::- :..;:h. 0
p v O r
A ;IAA {D I 1 .+f`';�'
' m �,�, Z o < I r f� ' '•I 1 U"4.13, �. GAGING STATION BASE \ �: m U
D A r ° ° m / h ' , / / I (TO REMAIN IN SERVIOE-)' - !J m z )n
ry am OO + I / 1.11 / , I / / i �, ' �y 1 Aa
r< ZAF xOA �� II m0 0
yo °O° Dcz UIG.S. GAGING STATION // sm s
m 2 n I 11 i / r I I 11 (TO BE REMOyED) '�, CO Z
m D ti Z N I I �;3> I 1- 1 I I r • m L7
o m y o I �, ,/ r 1 1 TOP OF GABION VARIES I 0
Uri A c5 •/ j l /;��i i� l/I 1� 1 FROM 2991' Tf 2996' 1 1 y
y �mi nZ [ j / // I �� iD , IIR10B xWaa' „/C66Z o
Z° O Z m l //�� 1 I, /,/ i , 11 / R / 11 11 I 11 11 111 ___ Y 1 z Z8
`J I l 1 I I N� Z
N �i / I mo`\ 1\ j II i i o \10 111 li o j i �O_ E 1 1 o
U. zi 4 0.+ + + *J +I 0 E:` m
O� / �/ % i 1 1, f \> 11\`Ol 1' 110 �Oi 1pl p� j I + 1 ma
I / .4
/ z r d l 1 lu9.s1 I ;1 m5
i r % 11 11 roi I • q f °1F
II
% UP O// ~ it Eli j I 1 1 ' It O li rii i
i- �• y m$
+0
I u O I � o 111 I I 1 1 11 1111111 'NO "� i�� 1-
1111
/ / r / / / I I 1 QII{IIII 5 1 r 1 I � 1111 W ul ixo •� � Fi
i i i {N111 {w�+1' / i �\ i i1 iii iii 1 m r
/
SOU ER 1 I I 01 p 71
O
; =F
-0 °mLu p m 1 1 0 1/ l,p 11 ���uupEi
P � + 1 1
zZ�i�o III uw' o�n
i , %/� Z• �� / j m 5r p
� III 11\ o II ins p z 0.
Ng � 1 Qm z
2/
*� D2C m 111 HI �/ •' �N
m
mD
�� �� <m �/ 1 xa
/ 4 , "1/ 1oap mm
.Zir
O
y;-Iin O En
�
O O
� ,
mi
s•A �,�xaua' °P o a z m
9'sr_ ,_,p
d/ 9 FF / + L V�Q I 1 I m
I = I
FF Z m
m
r
11 >� o m
1 --UP r rn °
j 2990 9 i� m y r
UP
UP . % g m m 1 = (A
r0 3 z
L" m ; z
. rA
m 6 1
°m 1
m
a A B i
3/F 7
� z
� � 7Og�
ti. c fit 3
m I r: / •�• r O
tI
O n
I,
/ •�� ; 0
�' •�.
Z / c
O
0 N
2 O ^ '`• gi
/ N
4
z 0
x 1
c c
0 D 1
z� �, 1
JOB NO.: 12,0140 ,uunnq�
( ^) ♦n DATE: JULY 2013 STEEL BRIDGE �tH CAgp� -.,,,
VJ DESIGNED BY: DP =
STREAMBANK REPAIR PROJECT ;r
M EXISTING CONDITIONS DESIGNREVI W:_ S 2150 F McG
o m CONST. REVIEW. _ NC WILDLIFE RESOURCES COMMISSION ' ASSOCIATES
FILENAME: FEE. `` ENGINEERING -PLANNING •FINANCE
Bddg.DESIGN.dwg HAYWOOD COUNTY, NORTH CAROLINA 5513ROADMRM ASHEVUE, NC28801 PH.(828)252 -0575 FIRMUCP.NSE#C -0459
Ell I BARBED -WilE Fl
PROPOSED ROOD RAL FENCE
WFALL r WL FROM TOP OF PROPOSED SLiOFE
BAONWU WIN COIPACTED
FOR PLANING DN EACH I
SEE OETAL SKEET 0-602
Ir
TIP.
12' MNMNN
♦ ♦ ♦'�' eaumt -- - I
•��� I�
DOB'INO SIREAY
CROSS SECTION A -A
=loom
FOR FO I1ISMIKIN BALLAST
DOUBLE ROW of G'ABION BABID:TS
DOW BARKED -M S
PROPOSED WOW WL PENCE
MALL r WL FROM TOP OF PROPOSED am
BAC OU WITH oa1PAO7ED s011
ftb
INSTALL DOUBLE u7rER
SoL
WIA L Sun HATM SEEDpq
no LI1E.' m ANQS lu OEM
GEDIDLIE.E,
csES am o-am)
0 0 O
WVm 14M APPROVED EO
•�,
FOR PLANING ON EACH EE11C11.
CSI w N
SEE arm SHEET'
IC mNE. �
X
INSTALL NON-MOM
L WITH I
� Q
i
AFL COBBLE m
%
AL
E r
E
APPROVED EQ
NrDI -W7YBI F
DESING FACED SLOPE
F- Q v
v
SAL g
g Lu o
o
M 7
! -
OVER BANK ZONE.
"yam
OR
•?•
COBBLE WIWN L�TO
ALLOW W11ER 70 DRAIN
♦ ♦ ♦'�' eaumt -- - I
•��� I�
DOB'INO SIREAY
CROSS SECTION A -A
=loom
FOR FO I1ISMIKIN BALLAST
DOUBLE ROW of G'ABION BABID:TS
DOW BARKED -M S
PROPOSED WOW WL PENCE
MALL r WL FROM TOP OF PROPOSED am
BAC OU WITH oa1PAO7ED s011
16' OFPSE7
♦�
♦ WA: 2ML13
DOSING STREAM
CROSS SECTION B-B
wmw"
wm amr�m Lmm
ofMEL
1. STONE BETWEEN 4'-B' N SIZE SHALL BE USED N NEW OABION WAU-
I THE DOSING S7REA BANK WTERUL CAN BE USED AS OASIONN FU AFTER OWNS 6 RETIOVED.
SUPPLEMENTAL STONE BETWEEN 4 -W N SIZE SHALL BE USED.
& KABION BASKETS SHALL BE MN. 12 KAVOE PVC COAIED WIRE AND THE WE MESH
SHALL CONFORM TO ASTM A-181L MESH OPEIONO VILL BE 3' X Y.
4. THE EXCAVATED SLOPE SMALL BE LINED WITH A NON-WOVEN OEOSIN nWW SUCH AS MOM 14ON
OR APPROVED EQUAL
S, BASKETS SHALL BE TIED TOGETHER VITH MOWN 3 TIES PER SIDE USNO MMRN 12 OAUOE COATED WM
B. RESTORE STREAYBANK AS SHOWN ON PROPOSED REPAIR PLAN.
7'. BAC WU WHIN LOWER BANK ZONE 70 BE OOWMWTED USING STONE. EXCAVATED DEBRIS/WSTREAMBANK
W7ENALS, OR CONCRETE BLOB( REWOVED FROM USOS
GAGNO STATION. MID AND UPPER BANK ZONE 70 K 00161RUCTED USING COMPACTED CLAY.
* BANK REPAIRS 70 BE BENCHED INTO EXISRNG FAILED SLAPS
U
pQz.
a
[-4 z
I2' MNORm Q
"Z
..
VUzIg
Day
a�
v
—SWALL DOUBLE LAMM � Z
NPAR 140" at
APPROVED EQUAL Q
z
z
o
z
wm
Y
ENNOA
GDWT
�� ar
DOUBLE ROW OF
H h
W AM
mrosw
m
WIA L Sun HATM SEEDpq
no LI1E.' m ANQS lu OEM
z
csES am o-am)
0 0 O
O
•�,
FOR PLANING ON EACH EE11C11.
CSI w N
SEE arm SHEET'
IC mNE. �
0 —
L WITH I
� Q
i
AFL COBBLE m
m W
N
_ 1
W Y ca
NrDI -W7YBI F
16' OFPSE7
♦�
♦ WA: 2ML13
DOSING STREAM
CROSS SECTION B-B
wmw"
wm amr�m Lmm
ofMEL
1. STONE BETWEEN 4'-B' N SIZE SHALL BE USED N NEW OABION WAU-
I THE DOSING S7REA BANK WTERUL CAN BE USED AS OASIONN FU AFTER OWNS 6 RETIOVED.
SUPPLEMENTAL STONE BETWEEN 4 -W N SIZE SHALL BE USED.
& KABION BASKETS SHALL BE MN. 12 KAVOE PVC COAIED WIRE AND THE WE MESH
SHALL CONFORM TO ASTM A-181L MESH OPEIONO VILL BE 3' X Y.
4. THE EXCAVATED SLOPE SMALL BE LINED WITH A NON-WOVEN OEOSIN nWW SUCH AS MOM 14ON
OR APPROVED EQUAL
S, BASKETS SHALL BE TIED TOGETHER VITH MOWN 3 TIES PER SIDE USNO MMRN 12 OAUOE COATED WM
B. RESTORE STREAYBANK AS SHOWN ON PROPOSED REPAIR PLAN.
7'. BAC WU WHIN LOWER BANK ZONE 70 BE OOWMWTED USING STONE. EXCAVATED DEBRIS/WSTREAMBANK
W7ENALS, OR CONCRETE BLOB( REWOVED FROM USOS
GAGNO STATION. MID AND UPPER BANK ZONE 70 K 00161RUCTED USING COMPACTED CLAY.
* BANK REPAIRS 70 BE BENCHED INTO EXISRNG FAILED SLAPS
U
pQz.
a
[-4 z
I2' MNORm Q
"Z
..
VUzIg
Day
a�
v
—SWALL DOUBLE LAMM � Z
NPAR 140" at
APPROVED EQUAL Q
z
z
o
z
wm
Y
ENNOA
GDWT
�� ar
DOUBLE ROW OF
E7GSii o � As � 0
tEOETNSAR1r J =
TE �
V
Z
Pat � BAtJ�118r
011BI011 BASKETS �
WHIM
Q m
Q m
z z
O O
wzw
mam
[n in
O O
w 0:
U U
PRELIMINARY
NOT FOR CONSTRUCTION
SHEET
C -501
H h
Lu z
z
G FAILED SLOPE 0
0 0 O
O
wa v0
CSI w N
IC mNE. �
0 —
L WITH I
� Q
i
AFL COBBLE m
m W
W Y ca
NrDI -W7YBI F
F- Q v
v
SAL g
g Lu o
o
PRELIMINARY
NOT FOR CONSTRUCTION
SHEET
C -501
i
i
,r,1m,a.�. 0r„ A,�BImf11.H,LM.00r,BUp>g1p1,,, V&=32=F.«3
O
gj
g � abS gx A>$FR� a k z g ym o ��W q m 0
�yRE 1$ 8 8 a m q r
IF
Z Z
li �I #a R Rg eRa @s a !i a (n (n
■� R tl� <� s? �< %W
s3s y RI ■ isq 0
lip 1. P P • r P r
P r P P • r r ; 11 4 P P t
i A g
III M z ro lim, w I 1 9
mm 100 no 4 z
cl) � $ q'�q � �!� � �q � � ��� r
8v 8 v zg vva`v gg t z
O� q 4 pp is O m
—
Iq� q 8 m m eeq �q r� g= s� c
$ Orn I�g g Y g� q R . 911 � R � q i e, —4
0— �g a _ v i �� CIE _! z
o R �v a
cn — �;�a v $ ��$ z —�4 gq �� iw vIIq -04
—I Q R�� (n ! a �gv d m
cis cn !i 4
z x !II R8 9�
NO OAM 1 M13 STEEL BRIDGE SN •
co DATE FM 2013
m MISCELLANEOUS DDB D[ STREAMBANK REPAIR PROJECT CAM
p m NOTES °� =°"R�"�"'-
`o' R�E""- NC WILDLIFE RESOURCES COMMISSION >�. ASSOCIATES
IV —� 1,LE �
IM1404ted E ENGINEERING - PLANNING - FINANCE
mod294)ESON dV HAYWOOD COUNTY, NORTH CAROLINA 55MM U" Ate. N=801 MMI)2MM MUIS MOC40
m,mrliAD1A -W PkMW- 12200VJBWWALU2jWl4D1%dod%omsxp,ay &%w,mwLW
0) P P ► F F r \
I W m gig"
z o
�.
I Re
g� �
m a .o 0
z Yz
m�� a ,"
ze •. !E
g R
■ Yeg +OMA
let
fop
i3 P ► F F r
v 6U8a1l �
< m m
Z
10 8D = "
z 90
f � v 55 p
gig i SPPPP� m I
itl ` v Z
e 0
Z "'
!E
I �
0�
E !q ;o r o D T.
D I n
m +R x � D
V 0
z
oil
mq
6 �
D
r
av W v
O
z
� D
T _
s
< fd fa
z "D �
O� o0D co 00
$ Om n
nr �r M
OK z ��
MZ
0D
z a
NO cn ME 120070 STEEL BRIDGE �, Gin
ME �. m,�
CJ7 m MISCELLANEOUS � op STREAMBANK REPAIR PROJECT �
Cp m DETAILS DESIGN FW-
"�— NC WILDLIFE RESOURCES COMMISSION ASSOCIATES
120D1 HAYVNDODCOUNTY, NORTH CAROLINA ENGINEERING• PLANNING•PINANCE