Loading...
HomeMy WebLinkAboutNCC215272_ESC Approval Submitted (2)_20210927Iredell County Planning & Development Erosion Control Section 349 North Center Street P.O. Box 788 Statesville, NC 28687 Date: March 1, 2018 LETTER OF APPROVAL WITH MODIFICATIONS Everett Franklin Jacobs, Jr. Bradford Community Investors, LLC PO Box 99 Davidson, NC 28036 RE: Project Name: Gambill Forest Subdivision Acres Approved with Modifications: 145 Project ID: MVLLE-2018-047 Project Location: PIN 4677034049.000 Submitted By: Piedmont Design Associates, P.A. Date Received: February 14, 2018 Plan Type: New Dear Mr. Jacobs: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and herby issue this Letter of Approval with Modifications. Modifications must be received in this office no later than two weeks prior to the project start date. Failure to submit modified plans can result in a violation and fine under the Iredell County Land Development Code. The Modifications required for Approval are listed on the attached page. The Certificate of Approval issued by Iredell County must be posted at the job site. This plan approval shall expire three (3) years following the date of this approval as is required by Title 15A NCAC 4B.0129 and Section 9.6.6 of the Iredell County Land Development Code. Title 15A NCAC 4B 0118(a) and Section 9.6.9 of the Iredell County Land Development Code requires that a copy of the approved erosion control plan be on file at the job site. Any amendments and/or revisions to the approved plan must be reviewed and approved prior to implementation in order for the site to remain in compliance. Failure to submit plans for approval may result in administrative actions and/or penalties as indicated in the Iredell County Land Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Section 14.2.2 of the Iredell County Land Development Code, of our right of periodic inspection to insure compliance with the approved plan. Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is Letter of Approval with Modifications Gambill Forest Subdivision March 1, 2018 Page 2 of 3 inadequate to meet the requirements of the Iredell County Land Development Code and the Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act and Code. Acceptance and approval of this plan is conditioned upon your compliance with Federal, State, and County water quality laws, regulations, and rules. This approval does not supersede any other permit or approval. Please be aware that your project will be covered by the enclosed NPDES General Stormwater Permit NCGO1000 (Construction Activities). You are responsible for becoming familiar with all of the requirements for compliance regarding the enclosed general permit. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it is required that this office to be notified of the proposed starting date for this project. Please notify us when you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Randall Moore, CESSWI Erosion Control Inspector II Enclosures: Modifications NPDES General Stormwater Permit Cc: NC Department of Environmental Quality, Division of Energy, Mineral, Land Resources Land Quality Section Letter of Approval with Modifications Gambill Forest Subdivision March 1, 2018 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Gambill Forest Subdivision Project ID: MVLLE-2018-047 County: Iredell Reviewed by: Randall Moore Required changes are designated as "RC" under legal authority from NC General Statutes Chapter 113A Article 4 and the Iredell County Land Development Code. Suggested changes are designated as "SC" for improvement of the plan. 1. Provide a statement from the property owners granting the Financial Responsible Party permission to perform the land disturbing activity and/or provide an updated FRO and deed showing the Financial Responsible Party as the property owner. —RC 2. A modified phasing plan for the project needs to be submitted for review prior to the pre - construction meeting due to the size of the project. —RC 3. Silt fence should be across all downslope sides of disturbances and diversions and clearing limits (Sheets EC-113, 1C, 1F). —RC 4. Diversion from east to SSB#1 should enter basin via slope drain in front of the first baffle. —RC 5. RB 96 outlet does not discharge at clearing limits. —SC 6. Some of RB#7 is across property line. Need an easement or move the basin. —RC 7. The tables for the SSB's does not show a minimum depth of flow of 0.5 feet for the weirs with weir flow depth less than 0.5 feet. —RC