HomeMy WebLinkAboutNCC215272_ESC Approval Submitted (2)_20210927Iredell County Planning & Development
Erosion Control Section
349 North Center Street
P.O. Box 788
Statesville, NC 28687
Date: March 1, 2018
LETTER OF APPROVAL WITH MODIFICATIONS
Everett Franklin Jacobs, Jr.
Bradford Community Investors, LLC
PO Box 99
Davidson, NC 28036
RE: Project Name: Gambill Forest Subdivision
Acres Approved with Modifications: 145
Project ID: MVLLE-2018-047
Project Location: PIN 4677034049.000
Submitted By: Piedmont Design Associates, P.A.
Date Received: February 14, 2018
Plan Type: New
Dear Mr. Jacobs:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and herby issue this Letter of Approval with Modifications.
Modifications must be received in this office no later than two weeks prior to the project start
date. Failure to submit modified plans can result in a violation and fine under the Iredell County
Land Development Code. The Modifications required for Approval are listed on the attached
page. The Certificate of Approval issued by Iredell County must be posted at the job site. This
plan approval shall expire three (3) years following the date of this approval as is required by
Title 15A NCAC 4B.0129 and Section 9.6.6 of the Iredell County Land Development Code.
Title 15A NCAC 4B 0118(a) and Section 9.6.9 of the Iredell County Land Development Code
requires that a copy of the approved erosion control plan be on file at the job site. Any
amendments and/or revisions to the approved plan must be reviewed and approved prior to
implementation in order for the site to remain in compliance. Failure to submit plans for approval
may result in administrative actions and/or penalties as indicated in the Iredell County Land
Development Code. Also, this letter gives notice as required by G.S. I I3A-61.1(a) and Section
14.2.2 of the Iredell County Land Development Code, of our right of periodic inspection to
insure compliance with the approved plan.
Iredell County's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan is
Letter of Approval with Modifications
Gambill Forest Subdivision
March 1, 2018
Page 2 of 3
inadequate to meet the requirements of the Iredell County Land Development Code and the
Sedimentation Pollution Control Act of 1973, (North Carolina General Statute 113A-51 through
66), this office may require revisions to the plan and implementation of the revisions to insure
compliance with the Act and Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State,
and County water quality laws, regulations, and rules. This approval does not supersede any
other permit or approval.
Please be aware that your project will be covered by the enclosed NPDES General Stormwater
Permit NCGO1000 (Construction Activities). You are responsible for becoming familiar with
all of the requirements for compliance regarding the enclosed general permit.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the form. In addition, it is required that this
office to be notified of the proposed starting date for this project. Please notify us when you plan
to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Randall Moore, CESSWI
Erosion Control Inspector II
Enclosures: Modifications
NPDES General Stormwater Permit
Cc: NC Department of Environmental Quality,
Division of Energy, Mineral, Land Resources
Land Quality Section
Letter of Approval with Modifications
Gambill Forest Subdivision
March 1, 2018
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Gambill Forest Subdivision
Project ID: MVLLE-2018-047
County: Iredell
Reviewed by: Randall Moore
Required changes are designated as "RC" under legal authority from NC
General Statutes Chapter 113A Article 4 and the Iredell County Land
Development Code.
Suggested changes are designated as "SC" for improvement of the plan.
1. Provide a statement from the property owners granting the Financial Responsible Party
permission to perform the land disturbing activity and/or provide an updated FRO and
deed showing the Financial Responsible Party as the property owner. —RC
2. A modified phasing plan for the project needs to be submitted for review prior to the pre -
construction meeting due to the size of the project. —RC
3. Silt fence should be across all downslope sides of disturbances and diversions and
clearing limits (Sheets EC-113, 1C, 1F). —RC
4. Diversion from east to SSB#1 should enter basin via slope drain in front of the first
baffle. —RC
5. RB 96 outlet does not discharge at clearing limits. —SC
6. Some of RB#7 is across property line. Need an easement or move the basin. —RC
7. The tables for the SSB's does not show a minimum depth of flow of 0.5 feet for the weirs
with weir flow depth less than 0.5 feet. —RC